Transcript Project
Project 4. <Decontamination of polluted soils> Lecturer: Stoyan Gaydardzhiev University of Liege, Belgium Group members: J. Tun Tun, H. Kissiger Noudjom, L. Mbogne, L. Wiendieck, M. Hanöffner, B. Meyer, K. Günther, S. Held, F. Mucke, D. Menzel Structure • 1 Introduction • 2 Project work 2.1 Task 2.2 Method 2.2.1 Biological treament (in situ) 2.2.2 Screening (on site) 2.2.3 Soil washing (ex situ) 2.3 Calculation • 3 Summary 17 July 2015 12. IPW - FH Nordhausen Introduction: • Definition of remediation 17 July 2015 12. IPW - FH Nordhausen Remediation strategies for polluted soil 17 July 2015 12. IPW - FH Nordhausen Further data: • • • • 17 July 2015 The surface area: 10 ha = 100,000 m² Depht = 0.8 m Soil = 80,000 m³ Mass = 128,000 t 12. IPW - FH Nordhausen Project work - Task • Given Facts: - Density = 1.6 g/ cm³ pH = 7.1 CEC = 23 mg/g Heavy Metals [μg/ g] -Humidity: water content 1.5% mass of dry soil -Organics: (from fuel leackage) - Pb: 1240 - Zn: 1200 - Cd: 15 Vinylchloride – soluble (water) Naphtalene – in water and gas Phenol – in water and in solid – [ Sand ] [Silt] [Clay ] [Carbon ] 56 % 32% 11% 17 July 2015 1% 12. IPW - FH Nordhausen Method 17 July 2015 12. IPW - FH Nordhausen Biological treatment 17 July 2015 12. IPW - FH Nordhausen Soil washing (ex situ) 17 July 2015 12. IPW - FH Nordhausen Moving drum screen - trommel 17 July 2015 12. IPW - FH Nordhausen Centrifugal non-mechanical classifiers - Hydrocyclone 17 July 2015 12. IPW - FH Nordhausen Calculation • • • • • • • Cost for renting mashines Energy cost Biological treatment Excavation Soil washing Laboratory test Labour charge Approximate cost 200 € per m³ 17 July 2015 12. IPW - FH Nordhausen Summary • Economical • Effective • Simple 17 July 2015 12. IPW - FH Nordhausen