Chronology of Events – Concept to
Implementation
TRANSACTION
Mar 30’11
First Session of REC Trading
Feb’11
CERC approved Business Rules of Exchange Platform
Sep’10
CERC Issued Order on Applicable Fee and Charges for Participating in REC Mechanism
Jun’10
CERC has issued Order on Detailed Procedures for Implementation of REC Mechanism
Jun’10
CERC has issued Order on Forbearance and Floor Price after Public Consultation Process
Jan’10
CERC Designated National Load Despatch Centre as Nodal Agency under the REC Regulations
Jan’10
CERC notified Regulations for Implementation of REC Framework
Nov’09
Central Electricity Regulatory Commission initiated process for Implementation of REC Mechanism in India
Oct’09
FOR has approved Model REC Regulations for adoption by SERCs
I
M
P
L
E
M
E
N
T
A
T
I
O
N
Consultant submitted its Exhaustive Report to MNRE on Conceptual Framework for REC Mechanism in India
Jun’09
Sep’08
Consultant submitted its recommendation to the Working Group on 'Policies on Renewables’
Aug’08
MNRE engaged Consultant to Develop Conceptual Framework for REC Mechanism in India
CONCEPT
Jun’08
Hon’ble Prime Minister announced NAPCC recognizing Implementation of REC Mechanism as tool to promote RE
Jun’08
FOR initiated study to assess measures for increasing share of RE including Feasibility of Introducing REC Mechanism in India
17/07/2015
2
Status- RPO Regulations
BIO MASS
BIO MASS
SOLAR
SOLAR
GREEN
ATTRIBUTE
RENEWABLE
ENERGY
CERTIFICATE
GEO THERMAL
RENEWABLE
ENERGY
WIND
SOLAR
CERTIFICATE
NON-SOLAR
CERTIFICATE
ELECTRICITY
SMALL HYDRO
HYDRO
CERC REC Regulation, 2010 – Conceptual Framework
RE Generation*
Sale at
Preferential
Tariff
Electricity
Component
REC Component
Obligated Entities
Distribution Company
/ Third Party Sale/
Power Exchange
Obligated Entities /
Voluntary Buyers
* Self consumption by CPPs based upon renewable generation are eligible for RECs
NLDC
5
Salient Features of REC Mechanism
RE Generator
Grid
Connectivity
Trading
REC
State
Agency
1 MWh
Central Agency
REC Framework: Eligibility
Grid Connected RE technology approved by MNRE
Self
Consumption/
Captive use
No Promotional
Wheeling
No Promotional
Banking
Eligible if All Three conditions
mentioned above are met
Third party sale/Open
Access
No Electricity
Duty Exempt
Sale at Mutually
Agreed Price
Eligible
PPA with Distribution
Licensee
PPA at Average
Power Purchase
Cost
PPA at
Preferential
Tariff
Eligible
Not Eligible
Entities involved to Operationalise REC
Mechanism
Central

Forum of Regulators

Central Electricity Regulatory Commission

Central Agency (National Load Despatch Centre)

Power Exchanges

Compliance Auditors
State

State Electricity Regulatory Commission

State Load Despatch Centre

State Agencies

Eligible Entities

Obligated Entities
REC Procedures
ACCREDITATION
REGISTRATION
ISSUANCE
TRADE &
REDEMPTION
Applicability & Scope
 Applicable to:





RE Generators including CPPs
 RE source recognized and approved by MNRE
SERCs to designate State Agencies
Accreditation -six months prior to commissioning
No PPA at Preferential Tariff
In case of PPA


After 3 years or expiry date of PPA whichever is earlier
For CPPs

No benefit in the form of:



concessional/promotional transmission or wheeling charges,
banking facility benefit and
waiver of electricity duty
 Accreditation valid for five years.
NLDC
10
Step Wise Schematic Description of Procedure for
Accreditation
Verification Prior
to Accreditation
2
1
3b
Eligible Entity
Application for
Accreditation
3a
Confirmation of
Accreditation
State Agency
Intimation of
Accreditation
SLDC
Intimation of
3c
Accreditation
Central Agency
Application for availing Accreditation by Generating Co. to the Host SA
Application shall contain details of Owner/Operator, Generating Station , Metering,
Connectivity , Statutory, General , fees & charges, Declaration
Separate Application for each RE Generation Project
Appointment of NLDC as Central Agency
NLDC designated as Central Agency.
 The functions of Central Agency includes :
 Registration of Eligible Entities
 Issuance of Certificate
 Maintaining and settling accounts in respect of the certificate
 Repository of transactions of certificates and
 Any other function incidental to the implementation of REC Mechanism
 The NLDC to operationalise REC mechanism has developed
various procedures .
 Various activities in these procedures shall be undertaken in the electronic
form to the extent feasible.
NLDC
12
Schematic Description of Procedure for
Registration
Eligible Entity
State Agency
3b
Intimation of
Application for
Registration
SLDC
Registration
3c
Intimation of
1
Registration
Central Agency
Confirmation of
3d
Registration
3a
Power Exchange(s)
Verification
Prior to
Registration
2
Intimation of
Registration
Information to be furnished by the applicant
Owner Details, RE Generating Station details, Certificate of Accreditation
Commissioning Schedule, Details of Fee & Charges, Declaration
Time Line
Application
accompanied with
fees and charges
Furnishing the
Central Agency
requested details
by the applicant
Grant of
Registration
3 Months
2 days
7 days
15 days
15 days
Process of
Registration
Intimation
regarding
Incompleteness of
application
NLDC
Payment of
applicable
registration
Charges
14
Schematic Description of Procedure for
Issuance
Intimation of
Issuance
State Agency
5b
2
3
SLDC
Regular Injection
Report
Verification
Pre-Condition
Central
Agency
Intimation of Meter
Reading
Issuance of
REC
4c
4b
1
Application for
Issuance
Distribution
Licensee
4a
Eligible Entity
Joint Meter
Reading
5a
Schematic Description of Procedure for Redemption
Central
Agency
Verification
Conditions
(By 15:30)
Eligible
Entity
Offer for Sale
13:00 to 15:00 hrs
1a
Intimation of
Trade results
For Extinguishing
REC
(By 17:00)
2
Confirmation
Of REC validity &
quantity
(by 16:00)
Bid for Purchase
13:00 to 15:00
Power
Exchange(s)
1b
Market Clearance
(Volume & Price)
3
Central
Agency
4
Reports
Obligated
Entity / Buyer
Home Page
https://www.recregistryindia.in
Accreditation Details
(As on 29.09.2011)
Non Solar
Capacity (MW)
Number
Wind
Small Hydro
Bio Mass
Bio Fuel Cogeneration
Urban & Municipal Waste
Total
Solar
Solar Thermal
Solar PV
Total
682
59
352
318
0
1411
Capacity (MW)
0
0
0
168
12
30
29
0
239
Number
0
0
0
Registration Details
(As on 29.09.2011)
Non Solar
Capacity (MW)
Number
Wind
Small Hydro
Bio Mass
Bio Fuel Cogeneration
Urban & Municipal Waste
Total
Solar
Solar Thermal
Solar PV
Total
569
52
224
230
0
1075
Capacity (MW)
0
0
0
121
10
20
21
0
172
Number
0
0
0
Issuance & Trading
Month,
Year
Opening
Balance
RECs
Issued
RECs
Redeemed
Closing
balance
March, 2011
0
532
424
108
April, 2011
108
4503
260
4351
May, 2011
4351
28270
18502
14119
June, 2011
14119
27090
16385
24824
July, 2011
24824
30224
18568
36480
August, 2011
36480
31813
25096
43197
Sept, 2011
43197
72850
46362
69685
195282
125597
Total
Power Exchange wise Trade Details
IEX MCV
( RECs
Traded)
PXI MCV
( RECs Traded)
Total
Trade
March, 2011
274
150
424
3900
2225
April, 2011
260
0
260
1500
0
May, 2011
14002
4500
18502
1500
1500
June, 2011
15902
483
16385
1500
1500
July, 2011
14668
3900
18568
1555
1550
August, 2011
22096
3000
25096
1800
1710
Sept,2011
41385
4977
46362
2300
2300
Month
IEX MCP
(Rs/ REC)
PXI MCP
(Rs/ REC)
Highlights
• Highest ‘Capacity’ Registered :
36 MW, Wind (Gujarat)
(Gujarat Fluorochemicals Limited)
• Smallest ‘Capacity’ Registered:
0.35 MW, 8 Projects
• Average ‘Capacity’ Registered: 6.4 MW
• Total Registered Buyers:
454 Buyers ( 5 Voluntary Buyers)
Concerns of stakeholders
• Extension of applying period of REC from 3 months
to 6 months
• Validity of RECs
• Periodicity of Compliance
– Quarterly or Six monthly
• Floor/Forbearance Price
– Longer visibility of 5 years
Concerns of stakeholders
• Long Term RPO Trajectory: For next 5 to 10
years
• Same RPO level across the country
• Strong Enforcement Mechanism
• CPP eligibility: Electricity Duty waiver
• Vintage based floor price for solar REC
– Multiplier linked to reduction in floor price
24
Weblinks
•
•
•
•
•
www.nldcindia.in
www.recregistryindia.in
www.cercind.gov.in
www.forumofregulators.gov.in
www.mnre.gov.in