CYPRUS AUSTRALIA COAL COMPANY Bulga Complex …

Download Report

Transcript CYPRUS AUSTRALIA COAL COMPANY Bulga Complex …

Beltana Development
ACARP Roadway Development Operators Workshop Sept. 2007
16
Beltana Hunter Valley
NSW
17
Beltana
18
Blakefield South
19
Blakefield South
20
Beltana Development
Beltana Update.
Blakefield Update.
USA Systems Study.
Supporting a High Capacity Longwall.
21
Beltana
Total of 28 Million tonnes
mined to date.
Total of 80 km of roadway
driveage to date.
22
Beltana 2007
Total of 5.5 Million tonnes
mined to date.
Total of 16.5 km of roadway
driveage to date.
23
Single or Super
Single Miner
MG7
V’s Super Unit
MG8
MG9
Cut Rate m/hr
4.2
4.9
5.6
Metres/wk
340
389
373
Belt Moves
17.8
17.6
19.9
24
Single or Super
Single Miner
MG7
V’s Super Unit
MG8
MG9
Eng Avail.
91.8
93.8
88
Op Avail.
77.6
74.9
75.4
Op Time.
78
74.8
67
25
Single or Super
Single Miner
MG7
V’s Super Unit
MG8
MG9
3.6
3.4
3.5
Total Metres
7,421
6,555
7,045
Days / Panel
159
114
132
Pillar Cycle
26
Single or Super
Single Miner v’s Super Unit
Gains
– Cut Rate
112%
– Metres / Week
125%
– Pillar Cycles
103%
– Days / Panel
119%
27
Single or Super
Single Miner v’s Super Unit
Losses
– Maint Quality
– Standards
– Belt Moves / Parallel Tasks
– Production Maintenance.
– Sustainability
28
Changes at Beltana
Back into Mains Driveage
Starting a 2nd Crew
– Self Hired
– Integration of Crews
Change in Development Structure
– Addition to Development Management Team
– Each Crew self sufficient
– Maintain Single Panel Focus.
29
Single Miner What will
it support at Beltana
Development at 340m per week
Equates to 144m LW retreat / wk
Equates to 165,600t / wk
6.95 Million Tonnes / yr
30
Strategies
Key Points to our Strategies
– Manning.
– Standards.
– Measurement.
– Continuous Improvement.
– Fit for purpose equipment.
– Communication.
31
Blakefield South
173km of Driveage
44.6 million ROM tonnes
400m Longwall Face
6.7 million Tonnes / Year
9 year Life
32
Blakefield South
Up to 10m3/t if insitu CH4
High volumetric capacity ventilation
system maximum 580m3/sec.
Force–exhaust (pressure balanced)
ventilation system.
7 heading mains / 3 heading gate
roads.
33
Blakefield South
34
Blakefield South
35
USA System Study
Review Strategies for future
Development systems.
– Review 3 Hdg Gate Road Development.
– Review Continuous Haulage.
– New Technology.
36
Mines Visited
Peabody Highland
– FCT in Room and Pillar Operation. (High Voltage
Miners.)
Consol Loveridge
– 3 Hdg Development and changing from batch
Haulage to FCT. (ABM’s.)
Cumberland
– 3 Hdg Development. (Miner Bolters and Mobile
Bolters.)
37
Mines Visited
Twenty Mile
– 3 Hdg Development (Place Changing.)
– High Producing Mine.
San Juan
– 3 Hdg Development (place Changing.)
– Good Technology.
Joy Franklin
– New Technology ED miners, Automatic Drill Rigs
and FCT’s.
38
San Juan Transport
39
Specialise
The Americans Specialise
everything they do.
Whether it be in Motels,
Restaurants, Roadwork's and Coal
Mining.
40
Development
Place Changing
– Up to 8,200ft / mth = 2,500m / mth
Bolter Miners
– Up to 6000ft / mth = 1830m / mth
FCT Operation Room and Pillar
– Up to 700ft / shift = 210m / Shift
– 21m / hr (Approx 8,500m / mth)
41
3 hdg Development
Opportunities
Design FCT Operation (Consol Loveridge)
– ABM 14’s
– Joy 4 FCT
– Auxiliary Ventilation
To give a 50% improvement in Gate
Road Development.
Process Cost Saving
Up to 9000ft / Month = 2,750m / Month
42
Where we are at Now
Beltana Bolter Miner
– Joy 12CM12
– 2 Joy 10SC32 Shuttle Cars (16t)
– Breaker Feeder (18t bunker capacity at
1700tphr)
– Auxiliary Ventilation
– 5.5m/hr
Up to 6200ft / mth = 1888m / mth
43
Development
Where does Development need to
be?
What maximum production can we
expect from a single Longwall?
44
Some Facts
7million tonne Longwall (400m face at
1740 t/m)
– 2hdg Development
– 3hdg Development
2.88m/hr
4.51m/hr
10million tonne Longwall
– 2hdg Development
– 3hdg Development
4.11m/hr
6.44m/hr
45
Some Facts
12million tonne Longwall
– 2hdg Development
– 3hdg Development
4.93m/hr
7.73m/hr
15million tonne Longwall
– 2hdg Development
– 3hdg Development
6.17m/hr
9.67m/hr
46
Low Hanging Fruit
Obtained
Process Improvement
Old
7.2 Day Pillar Cycle
New
3.6 Day Pillar Cycle
Total Process Improvement
100 %
47
FCT Model For Beltana
From Data measured at Beltana a Cut Rate
after a belt move of 8.92 m/hr can be
achieved.
Joy FCT Modelled a rate 8.98 m/hr with a Joy
12CM12D.
Therefore we believe an average cut rate
with an FCT for a 100m pillar cycle would be
in the order of 8 to 9m/hr.
This would be a 70% increase in this part of
the Process.
48
Opportunities
Bolter Miners
– 14ED25 being built in USA to go into
Consol McElroy which commenced
production 1st May 2007.
– ABM 25’s Used throughout QLD and NSW
Automated bolting
Self Drilling Bolt
49
Opportunities
Continuous Haulage Systems
– Joy4FCT
– Stamler Chain Haulage
– Prairie System
– Sandvik Continuous Haulage
50
FCT Stats
51
Summary
To Advance to the next step in
Longwall Production Development
has to do something different.
By 3 to 5 years time we need to
have developed a new system so
Longwall Coal is not restricted.
52
Development
Can’t keep doing the same and
expect something different.
12 Million Tonne Longwalls being
supported by 500 people.
This is not sustainable.
53
USA is BIG
54