Transcript Folie 1
Why a schedule of fees for cadastral surveying Dipl. Ing. Dieter Seitz, BDVI 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 1 Why we need a schedule of fees for surveying services? We need guaranteed quality for private persons and We have a unequal competition between the state and private surveying companys 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 2 Time fees Advantage All expenses are remunerated Drawbacks The costs of surveying is not able to estimate The costs are depend by the performance on the job The costs are depend by the quality of the land register It is easy to rig a price (more or less houres) Risk of dumping offers Investments in modern equipment / Computers / Software / new surveying methods are not profitable . 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 3 Equivalence fees Costs only depend on the value of the property As an example the schedule of fees for the building surveys in Baden-Württemberg Building with value 0-25.000 € Building with value 25.000-100.000 € Building with value 100.000-400.000 € Building with value 400.000-800.000 € Building with value 800.000-2.000.000 € Building with value 2.000.000-5.00.000 € 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija fee fee fee fee fee fee 100 € 200 € 300 € 500 € 800 € 1.200 € 4 Equivalence fees Advantage Arising costs can be estimated for a offer Costs do not depend by the performance on the job Costs do not depend by the quality of land register Fees cannot be manipulated Investments and innovations are profitable for the office Acceptance of fees is better by the clients Drawbacks Some services (low value) are not cost-effective 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 5 Hybrid types of fees Hybrid types of fees have elements of time fees and equivalence fees Example the fees for land parcel partition in Baden-Württemberg Following parameters are taken 06.05.2011 Land value / sqm Equivalence fees Number of partial areas Expence fees numbers of new landmarks Expence fees Dipl.-Ing. Dieter Seitz GA CLGE Opatija 6 New border point Origin parcel Parcel 1 Parcel 2 New border point 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 7 Hybrid types of fees the fees for land parcel partition in Baden-Württemberg as example Origin parcel 1 1 * 150 € New Parcel 2 * 230 € 2 2 * 40 € New border points 2 690 € Summary Value of Land 0-10 € factor 1 Value of Land 10-100 € factor 1.5 1035.00 € Value of Land 100-300 € factor 2.25 1552.50 € Value of Land > 300 € factor 3.0 2070.00 € 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 690.00 € 8 One common fee for all participants is needed The fee must used from all surveyors (private and state) The fee must be obligatory for all surveyors The fee must be developed together Controlling of the practice of the fees is needed 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 9 Thank You 06.05.2011 Dipl.-Ing. Dieter Seitz GA CLGE Opatija 10