Florida Department of Transportation, District 5 SR A1A

Download Report

Transcript Florida Department of Transportation, District 5 SR A1A

From Island Estates Parkway to St. Johns County Line
Gene Varano
FDOT District 5
719 S. Woodland Blvd., M/S 542
Deland, FL 32720
(386) 943-5145


Length = 8.4 miles
Existing = 2 to 4 lanes
End Project
North





Milling and resurfacing
No additional travel lanes
Marked bicycle lanes
throughout project limits on
existing shoulders
Proposed sidewalk in
Marineland
Implement Marineland Traffic
Study
Construction Cost Estimate ≈ $5 million
Begin Project


Provide 5’ bike lanes
Correct roadway cross slopes


Provide 5’ bike lanes
Correct roadway cross slopes


Keep 5’ bike lanes
Provide sidewalk from UF
lab to Marineland entrance
Traffic Operational
and Speed Zone
Study Findings:
1.
2.
3.
Pedestrian traffic signal
at Marineland Entrance
will be removed.
The pedestrian cross
signs and crosswalk will
be updated to meet
current design
standards.
Revise speed limit from
30 mph to 35 mph.


The non-functioning
traffic signal at the
Marineland Entrance
will be removed.
Remove the flashers
from the advance
pedestrian warning
signs.




Reconstruct
existing sidewalk
Extend sidewalk
to Marineland
entrance
Tie into existing
pedestrian
features and
walkways
Special emphasis
crosswalk at
entrance
UF Lab
Marineland
Entrance
North
During Construction:
 Minimize Impacts to the
Traveling Public.
 Minimize Noise.
 Minimum lane width shall
be 10 feet.
 Existing speed limits shall
remain during construction.
 Access to be maintained to
all Developments during
construction.

Plans Completed Date
March 1, 2012

Contract Letting Date
July 25, 2012

Construction Start
Late Summer/Fall 2012
For additional information about FDOT Projects and Programs:
http://www.cflroads.com/
Gene Varano
FDOT District 5
719 S. Woodland Blvd., M/S 542
Deland, FL 32720
(386) 943-5145
From Island Estates Parkway to St. Johns County Line