Transcript Document
THE COLLEGE AT BROCKPORT Facilities and Planning Capital Update College Senate November 26, 2007 THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Funding Programs SUCF Capital (State University Construction Fund) MR&R (Minor Rehabilitation & Repair, “Lump Sum” SUCF) DIFR Capital (Dorm Authority—DASNY Bonds) DIFR (Res. Life--Annual Small Projects) Campus State $ (Alterations, Parking, EH&S, Priority Needs, Department) Other (NYPA, Institutional Advancement, BASC, Grant, Unique) THE COLLEGE AT BROCKPORT FACILITIES and PLANNING SUCF Capital Initial Capital Program ($35M) 1998 - 2003 Remaining Projects Lennon South - HVAC, Utilities, Greenhouse & Smith “Swing Labs” $1.5M (under construction by NYPA until spring ’08) REOC Purchase & Renovate One City Center $29M THE COLLEGE AT BROCKPORT FACILITIES and PLANNING SUCF Capital “New” Capital Program ($49.9M) 2004 - 2009 Execute with NYPA • MetroCenter HVAC & Code – $3.1M, under construction • Rakov HVAC & Windows – $1.6M, complete • Morgan Roof – $400K, complete • A.W. Brown Rooftop HVAC Units – $1.1M, Dec. ’07 THE COLLEGE AT BROCKPORT FACILITIES and PLANNING SUCF Capital (cont’d) Execute with SUCF • Roofs Under Construction – Drake, Tuttle North & South - $6.4M • Hartwell Roof - $4.4M • Under Design – TFA Renovation - $12.4M, Smith Renovation - $19.6M, Cooper Roof - $3M Challenge: domino moves, relocations, swing space See Handout: Capital Plan 2004-2009 THE COLLEGE AT BROCKPORT FACILITIES and PLANNING SUCF MR&R SUCF MR&R Annual Lump Sum $330K (Future $500K) Recently Completed • • • • • Sanitary Sewer Upgrades - $60K TFA Vestibule - $60K Campus Mechanical/Electrical Repairs - $300K Repairs – Stairs/Ramps/Railings - $25K Vehicle Garage Lift - $35K Future (Examples) • HVAC Coils & Dampers • Asbestos Removal • Minor Roof Repairs • Edwards High Voltage Feed Replacement • Project Manager THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Bonded DIFR Capital Townhomes - $18M 208 beds – “Self Funded” LEED Certifiable Under Design High Rise & Middle Quad Integrated Fire/Smoke System - $3.1M, 2008-09 Thompson Full Rehab - $7.5M, 2009 Next: MacVicar Rehab (2010-11) See Handout – Residence Halls THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Local DIFR (Annual Minor) Maintenance & Repair (DIFR Committee) Recently Completed (Examples) $300K Annually for Small Projects McLean Lounge Windows - $15K Mortimer Workout Room Windows - $40K 2007 - 2008 Plan (Examples) Morgan Roof High Rise Window Study High Rise Plaza Repairs/ADA THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Campus - State Funds Alterations (FP Committee) - $180K Annual Parking EHS Lot D1 Expansion - $350K Parking Lot W1 (complete) and W (summer 08) Diesel Generator Upgrades - $150K TFA Wax & Welding Exhaust Priority Needs and Special Programs Edwards Blue Room Carpet Walkway, Ramps & Steps ADA Improvements Blue Light Phones THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Other Sources NYPA – Performance Contracts NYPA Phase 3A & B $12.9M for 30 Items – $8.5M SUCF w/Balance Cost Avoidance Financed $3.5M BASC Funds with NYPA Execution - $475K SUCF Football Field Turf Design - $70K Lake Ontario Natural Resource Center - Congress - $300K of $12M (Rep. Reynolds) NYSERDA & POCR - $550K for Energy Conservation BASC Harrison Renovation Institutional Advancement Grants Unique/Strategic Initiatives Special Event Rec. Center – Legislative Item - $39M REOC Downtown Relocation - $29M (Legislative Item) New Academic Building - $30M (TBD) THE COLLEGE AT BROCKPORT FACILITIES and PLANNING Planning—What is Next? 2001 Capital Study - Still Guiding Us FP Committee – On Going Updates/Priorities 2007 Condition Assessment Re-Look & Update Enrollment Management Task Force Matrix (goals & initiatives) MOU with SUNY Sustainability/Energy Programmatic Needs Master Plan Coming