Transcript Document
«Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW Bagdat Oral Project Manager [email protected] © «Samruk-Green Energy» LLP March 2013 [email protected] www.samruk-green.kz Company profile Company was established in January 25, 2012 (Astana, Kazakhstan) Mission - is a reliable and high-quality supply with electric power produced from renewable energy sources. Vision - is the Company’s formation as a leader in the field of renewable energy sector in Kazakhstan. 100 % subsidiary company of «Samruk-Energy» JSC, a national power company (www.samruk-energy.kz ) © «Samruk-Green Energy» LLP 2 Parent company information “Samruk-Energy” JSC was established on 18th April 2007 and officially registered on 10th May 2007; 100% of equity is fully owned by “Sovereign Wealth Fund “Samruk-Kazyna” JSC; The group incorporates 22 entities and is a vertically integrated electricity provider, operating within the borders of Kazakhstan. Its key focus areas are: Generation of electric and thermal power (71% thermal energy and 29% hydro energy) Transmission and distribution of electric power Supply Coal mining Reconstruction, expansion and construction of power generating facilities and units “Samruk-Energy” JSC controls 40% of the electricity generation in Kazakhstan and is strategically important for the national economy. © «Samruk-Green Energy» LLP 3 IN PERSPECTIVE CURRENT PROHECTS Main activities WIND SOLAR SMALL SCALE HYDRO POWER BIOMASS GEOTHERMAL ASSEMBLY AND PRODUCTION OF SMALL SCALE WIND TURBINES GARBAGE UTILISTAION WITH ELECTRICITY PRODUCTION © «Samruk-Green Energy» LLP 4 Current projects № PROJECT TITLE CAPACITY, MW 1 Wind farm in the Shelek corridor, Almaty Region. 60/300 2 Wind farm in Yereimentau city, Akmola Region 50/300 3 Solar Power Plant in Kapshagai city, Almaty Province. 4 Solar Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China 5 Wind Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China © «Samruk-Green Energy» LLP 5 2 1 5 Projects related to the acquisition of assets and JVs’ establishment № PROJECT TITLE CAPACITY, MW Construction of small scale hydro power plant “Bartogai 27” 13 2 Construction of small scale hydro power plant “Bartogai 28” 20 3 Establishment of a Joint Venture (with KD Stahl- und Maschinenbau GmbH, Germany) on production of small scale wind turbines - Establishment of a Joint Venture on assembly of products with light-emitting diodes - Establishment of a joint venture (with Office Privée, United Kingdom) on construction of the power plant using straw in energy production 5-10 1 4 5 © «Samruk-Green Energy» LLP 6 Construction of 60 MW capacity WPP in Shelek with the perspective of expansion up to 300 MW Completed actions: Feasibility study of the Project is completed (December 2012); Land plot is allocated; A scheme of electric power distribution is developed and agreed. Period of realization Number of workplaces Technical specification for grid connection is obtained. 2011-2016 Planned activities During the operation – 12 © «Samruk-Green Energy» LLP Obtaining the State expertise’s approval 7 Construction of 50 MW WPP with the perspective of expansion up to 300 MW Completed actions: Feasibility study of the Project is completed. State expertise approval is obtained. A scheme of electric power distribution is developed and agreed. Planned activities Period of realization 2011-2016 Approve the feasibility study and the tariff in Ministry of Industry and New Technologies Number of workplaces During the operation – 10 © «Samruk-Green Energy» LLP Organization of financing 8 Construction of 2 MW capacity SPP in Kapshagai city Completed actions: Feasibility study of the Project is completed. State expertise approval is obtained. A land plot is allocated. A scheme of electric power distribution is developed and agreed. Period of realization 2011-2013 Number of workplaces During the operation – 5 Construction of the SPP has started Planned activities Commissioning of the plant and obtaining the State acceptance committee Act © «Samruk-Green Energy» LLP 9 Hydro power plant projects on Bartogai Completed actions: Investment-Innovation Council of «Samruk-Energy» JSC has approved the realization of pre-investment stage of the Project by acquisition of the share capital of “Zharyk Su Ltd” LLP; The obtaining of land plots (2 and 3.1 hectares) for construction have been approved; The contract for water use has been signed; Technical review of the technical-economical analysis of the project is carried out; Planned activities Acquiring the interest in the share capital of Project Company when the due diligence is completed; © «Samruk-Green Energy» LLP 10 Using straw in electrical energy production Completed actions: Investment-Innovation Council of "Samruk-Energy“ JSC has approved the implementation of pre-investment stage of the Project; Social-entrepreneurial corporation «Essil» has chosen 2 land plots in Akmola region of construction of plant; Social-entrepreneurial corporation «Essil» has chosen potential suppliers of fuel; Planned activities © ТОО «Samruk-Green Energy» Project feasibility study development. 11 Assembly and production of small scale wind turbines Completed actions: «Samruk-Green Energy» LLP and KD Stahl- und Maschinenbau GmbH has signed the Memorandum of cooperation; Agreement of intent on possible sale of products with the "KazAgroFinance“ JSC is signed; Planned activities Signing the Framework agreement on establishment of a joint venture; © «Samruk-Green Energy» LLP Project Feasibility study development. 12 Perspective projects «Samruk – Energy» JSC and «Samruk-Green Energy» LLP are considering the possibility of developing following new projects: 1. Expansion of Kapshagay solar power plant up to 100 MW; 2. Construction of 45 MW Solar\Hydro mix station; 3. Construction of 300 MW solar power plant in the South Kazakhstan region. © «Samruk-Green Energy» LLP 13 ТОО «Samruk-Green Energy» Thank You for your attention! © ТОО «Samruk-Green Energy» March 2013 [email protected] www.samruk-green.kz