Why Akmola region?

Download Report

Transcript Why Akmola region?

Producing of complete steel constructions
for pre-engineered buildings
Project’s purpose and idea: 1. Foundation of modern
competitive plant on producing of complete steel
constructions with high grade of manufacture
2. Forming of national producer with high potential on
import substitution and export access
Initiator: "Alma Grad Real Estate" LLP
Period of implementation: 2012– 2020 years
Project location: Zagorodniy village, Ust-Kamenogorsk
city, East-Kazakhstan region
Project Cost: 21.8 million U.S. $
Financial structure : investments
Investments required: 21.8 million U.S. $
Expected result: export access
Current status of the project: The project is being
implemented
IRR: 29,80 %, NPV: 6.9 thousand U.S. $
Payback period: 5 years
Production: 65 thousand tn of metal constructions per
a year
The presence of documentation: Marketing researches
and business plan available
Contact details: Director General Terehov I.S.
8 72 32 25 45 59
Advantages: trade market available
Infrastructure and resources: Existing plant, Raw
materials of Kazakhstan, Russian and European
manufacturers
Trade market: Kazakhstan, Russia (from Ural to Far East)
Creation of new jobs: 290
Requirements for investors: financial opportunities and
experience at this field
Construction of the first biopowerstation
Project’s purpose and idea: Producing electricity
under clean non-waste technology with the usage of
high-technology equipment
Initiator: «BIO-TES» LLP
Period of implementation: 2014 – 2015 years
Project
location:
East-Kazakhstan
region,
Shemonaikhinskiy district, Shemonaikha village
Project Cost: 81 million U.S. $
Financial structure : investments
Investments required: 81 million U.S. $
Expected result: foundation of a competitive
enterprise, providing people with electric power
Current status of the project : Project is available for
implementation after feasibility study development
Payback period: 60 months
The presence of documentation: under development
Contact details: Starostin Viktor Aleksandrovich
tel 8 777 130 7246, e-mail: [email protected]
Advantages: Additional features: creation of additional
production sawmilling and wood up to 1 million m3, with
the manufacture of prefabricated panel houses for
Afghanistan by special request of the U.S. $ 300 million
to the Republic of Kazakhstan
Infrastructure and resources: There are material and
technical resources, production area (2700 m2) with
storage, railway siding; infrastructure available. The area
of the land plot is 2 ha
Trade market: East-Kazakhstan region
Creation of new jobs: 150
Requirements for investors: financial opportunities and
experience at this field
Egg Plant reconstruction
Project’s purpose and idea: Reconstruction of egg plant,
equipment implementation, market eggs producing
Initiator: «Semey Egg Plant» LLP
Period of implementation: 2012– 2016 years
Project location: East-Kazakhstan region, Semey city, Malaya
Aktuba village
Project Cost: 3.09 million U.S. $
Financial structure : investments
Investments required: 1.14 million U.S. $
Expected result: Plant operating at its full capacity, cover the
demand of Semey city in market eggs
Current status of the project: The plant produces market
eggs since June, 2013
Production: 25 million eggs per a year
The presence of documentation: Feasibility study and
business plan are available
Contact details: «Ertis» Social and Enterprise Corporation»
National Company» JSC
61 Kirov street, 070019 Ust-Kamenogorsk, East-Kazakhstan
region, Republic of Kazakhstan
tel.: + 7 (7232) 26 89 67
fax: + 7 (7232) 24 99 59
E-mail: [email protected]
Director of «Semey Egg Plant» LLP Uvaliev Kairat
Sarsenkulovich
tel: 8-777-281-76-29
E-mail: [email protected]
Advantages: trade market available, absence of competitors
in the region
Infrastructure and resources: Feed processing room, 4 boxes.
Egg Plant is operating
Trade market: Semey city, East-Kazakhstan region
Creation of new jobs: 36
Requirements for investors: financial opportunities and
experience at this field
Creation of transport and logistics hub in Ayagoz district
Project’s purpose and idea: Creation and development
of transport corridor West-East from Europe, trough
the Caucasus and the Caspian sea to the Central Asia
and China
Initiator: Government of Ayagozskiy district (Akimat)
Period of implementation: 2012– 2017 years
Project location: Ayagoz city, East-Kazakhstan region
Project Cost: 12.5 (approximate) million U.S. $
Financial structure : investments
Investments required: 12.5 million U.S. $
Expected result: increasing the turnover
Current status of the project: Searching for investors
IRR: 21 %
Payback period: 8 years
Production: Customs checkpoints East Kazakhstan
region - People's Republic of China, 9 months of 2013:
«Maykapchagay» customs checkpoint – approx.
270 000 tn (13 500 cars), «Bahty» customs checkpoint
– approx 140 000 tn of cargo (7 000 cars)
The presence of documentation: Under development
Contact details: Enterprise department of Ayagozskiy
district, tel . 8 72 32 25 45 59
Advantages: advantageous geographical location for
transport and logistics hub creation
Infrastructure and resources: Land plot (area 18 ha)
chosen for the project is situated at the city outskirts
along railway siding
Trade market: Republic of Kazakhstan, Russian
Federation, People's Republic of China, Europe
Creation of new jobs: during construction – 150, during
operation - 70
Requirements for investors: financial opportunities and
experience at this field
Development of tourism at «Gusinniy» island and its 5 tours
Project’s purpose and idea: Tourism and recreation
with visiting the historic places at the territory of EastKazakhstan region
Initiator: «SAMRUC» LLP
Period of implementation: 2013 – 2019 years
Project location: Zyryanovsk district, East-Kazakhstan
region
Project Cost: 10.10 million U.S. $
Financial structure: investments, participation interest,
loan
Investments required: 4.36 million U.S. $
Expected result: export access
Current status of the project: complete availability to
the investments
IRR: 26%, NPV: 533 thousand U.S. $
Payback period: 6 years
Production: 4240 tours per a year (2 023 thousand
U.S. $)
The presence of documentation: feasibility study and
business plan available
Contact details: Muhitov Sabet Kairgazinovich,
Muhitova Gauhar Berdibekovna, 8 7232 62 35 95,
+7 701 717 22 20, 8 701 555 41 30 [email protected]
Advantages: trade market available, advantageous
climatic and geographical conditions
Infrastructure and resources: There is a building for
hotel complex construction. The island is in private
ownership for camping site construction.
Trade market: Kazakhstan and near-abroad countries
(CIS)
Creation of new jobs: during construction – 130, during
operation - 80
Requirements for investors: financial opportunities and
experience at this field
«Orel» Mountain Skiing Complex Modernization
Project’s purpose and idea: Reconstruction and
modernization of the existing mountain skiing complex
Initiator: Imambayev B.K. individual entrepreneur
Period of implementation: 2013 – 2015 years
Project location: Orel mountain, Podorlenok village,
Zyryanovsk district, East-Kazakhstan region
Project Cost: 1.6 million U.S. $
Financial structure : investments
Investments required: 1.6 million U.S. $
Expected result: increasing the turnover
Current status of the project: complete availability to
the investments
IRR: 50%, NPV: 1 978 thousand U.S. $
Payback period: 6 years
Production: 60 000 people per a year
The presence of documentation: Under development
Contact details: Address: 4-1 Centralniy alleyway,
Zyryanovsk city
tel: 8 (72 335) 6 27 00
fax: 8 (72 335) 4 00 93
Advantages: advantageous climatic conditions, high
demand
Infrastructure and resources: existing mountain skiing
complex
Trade market: Kazakhstan and near-abroad countries
(CIS)
Creation of new jobs: during construction – 50, during
operation - 100
Requirements for investors: financial opportunities and
experience at this field