Transcript PT. DINAMIK STRUKTURAL SISTEM
Construction Flowchart
Ground Anchoring Work
Preliminary Setting Out Coring ( Optional ) Drilling Homing/Installation Grouting Grout Cube Test Stressing Fabrication in Workshop Assembly on Site De - Tensioning
Construction Flowchart
Ground Anchoring Work (2 Layers)
Excavation until 1st layer elevation Setting Out Coring ( Optional ) Drilling Homing/Installation Grouting Grout Cube Test Stressing Excavation until 2 nd layer elevation Setting Out Coring ( Optional ) Drilling Homing/Installation Grouting Grout Cube Test Stressing
GROUND ANCHORING WORK STAGES
INITIAL EXISTING CONDITION EL.-2.325
EL.-2.325
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
GROUND ANCHORING WORK STAGES
1ST EXCAVATION LEVEL EL.-2.325
EL.-2.325
EL.-7.250
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
GROUND ANCHORING WORK STAGES
EL.-2.325
INSTALLED GROUND ANCHORS LAYER 1 EL.-2.325
EL.-6.950 (1st Layer GA) EL.-7.250
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
GROUND ANCHORING WORK STAGES
2ND EXCAVATION LEVEL EL.-2.325
EL.-2.325
EL.-6.950 (1st Layer GA) EL.-12.750
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
GROUND ANCHORING WORK STAGES
EL.-2.325
INSTALLED GROUND ANCHORS LAYER 2 EL.-2.325
EL.-6.950 (1st Layer GA) EL.-12.450 (2nd Layer GA) EL.-12.750
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
GROUND ANCHORING WORK STAGES
EL.-2.325
FINAL EXCAVATION LEVEL EL.-2.325
EL.-6.950 (1st Layer GA) EL.-12.450 (2nd Layer GA) EL.-16.900
DIAPHRAGM WALL T=800 EL.-26.400 (Type A) -23.900 (Type B)
STAGE 1 - EXCAVATION WORK
1st stage of site excavation (for 1st layer anchors installation) 2nd stage of site excavation (after completion of 1st layer anchors)
STAGE 2 - DRILLING WORK
Drilling in progress
STAGE 3 - FABRICATION WORK
Tendon being fabricated Fabricated tendon
STAGE 3 - FABRICATION WORK
Fabricated Tendon Fabricated tendon
STAGE 4 - INSTALLATION WORK
Permanent anchor being installed (Long Stoorage Kali Item Project) Temporary tendon being installed/homed (Plaza Asia & Sudirman Mansion Project)
STAGE 5 - GROUTING WORK
Grout pump used for anchor grouting Grout cube samples
STAGE 6 - STRESSING WORK
Anchor being stressed Completed anchor after stressing