ASB process map BandH V1

Download Report

Transcript ASB process map BandH V1

Initial call to PCC
Identified as ASB and four standard
questions asked. ASB tag added to
serial
Case referred directly to
NPT by partner agency
Graded as 1 or 2
Attendance within time frames
PC or Sgt creates
serial with ASB tag
Sent to NPT Queue
Forwarded to NPT
All ASB tagged incidents for 24 hour period
checked by NPT PC or Sgt
Quality assurance
dip checks
Low Risk
Quality assurance
dip checks
Risk assessed
Not low risk
Attendance by
NPT PC or PCSO
Brief rationale
on STORM log
Entry on ASB Share
Point library
Full risk assessment and
scoring matrix completed
Risk assessment
placed on
STORM log
Medium and
High risk
Risk assessment / file
reviewed by NPT Sup
Medium Risk
High Risk
• SPOC appointed
• SPOC appointed
• Overseen by NPT Sgt
• Overseen by NPT Inspector
• Sgt review every 28 days
• Sgt review every 14 days
• Inspector review every 56 days
• Inspector review every 28 days
• Chief Inspector review every 56 days
CIF forms completed with
overview and victims responses
to Risk assessment. Plan in PIER
format if High Risk