Transcript Slide 1
ТОО “SED” Sustainable Ecology Development Ecological Research Almaty, 2009 Services Assessment of current environmental condition (baseline study) Environmental Impact Assessment of planned activity Monitoring of Environmental Impact caused by industrial objects and processes Development of “Environmental Protection” chapters for technical projects Ecological audit Special research Environmental Impact Assessment of planned activity Oil & Gas Sector EIA of geological survey operations on Karatobe South field “TurkMunai” LLP EIA of group technical project for construction of exploration wells #2,3,5 on Tolkyn area FS and PreEIA, Site Survey and EIA for Perals block offshore operations. SHELL “Tolkyneftegas” OJSC EIA of pilot exploitation project of North Pridorozhnoe field “Khazar” LLP EIA of well drilling on Arys area “Liman Caspian Oil B.V.” EIA of drilling project and testing of layer Zhinishkekum wells in Zhusaly area “PETROM SA – Kazakhstan” EIA of Moldybai, Aktas, and East Burmasha structures research “Tasbulat Oil” LLP EIA of pilot exploitation of Tasbulat oilfield project “Tasbulat Oil” LLP EIA of geological survey operations project on Sinelnikovskyi area “Oztyurk - Munai” LLP EIA for NGDU “KaynarMunayGas” OJSC “Embamunaygas” EIA of pilot exploitation of Sinelnikovskoye deposit LLP “Ozturk-Munay” - EIA of Tub-Karagan gulf east coast CJSC NC “KazMunayGas” Environmental Impact Assessment of planned activity Geophysical operations EIA of 2D seismic acquisitions on licensed area of NIMIR PETROLEUM (North Buzachi). NIMIR PETROLEUM Bars EIA of seismic acquisitions project on Fedorovskyi area FIOC Mining operations Pre EIA of oil production and reprocessing project of polymetalic and baric ore on Zhairem field. Zhairem GOK Pre EIA of manganese production project. Zhairem GOK - Pre EIA of bitumen production project. “Porgress” corporation Seismic EIA of seismic acquisition at Ansagan-Amanat and Birlestik area LLP “TengizChevroil” EIA of 2D and 3D seismic acquisition at Tengiz area LLP “TengizChevroil” Environmental Impact Assessment of the Offshore Projects and Project in Transition Zone EIA of Koltyk oil deposit pilot exploitation project. OJSC “MunayGas” EIA of offshore pilot-methodic seismic works at South Zhambay– South Zaburunje sites. CJSC “KazMunayGas” EIA of exploratory well No 1 construction at Tub-Karagan area. “Tub-Karagan Operating Company BV” EIA of Tub-Karagan gulf east coast. CJSC NC “KazMunayGas” EIA of exploratory well No 1 and 2 construction at Kurmangazy area. MNC “KazMunayTeniz” Assessment of current environmental condition (baseline survey) Baseline ecological survey of environmental condition within water area of Kurmangazy structure in 2002. «KazMunaiGas» CJSC Ecological researches of environmental conditions within South Zhambay – South Zaburunye water area. «Zhambay» LLP Baseline ecological survey at Atash site. LLP “Atash Company” Baseline ecological researches at Tub-Karagan site. LLP “Tub-Karagan Operating Company BV” Baseline ecological researches at “N” site. CJSC NC “KazMunaiGas” Baseline surveys of environmental condition at Kurmangazy site in 2003. MNC “KazMunayTeniz” Assessment of current environmental condition within Imashevskoye deposit area. OJSC “Munaygas” Ecological Monitoring The objects of monitoring • Atmosphere • Resources of polluters disposal into atmosphere • • • • • • Domestic and industrial flowing Industrial and consumption wastes Soils Flora Fito zoo plankton, benthos Fauna Monitoring of the impact on the environment caused by gas compressor stations. CJSC “Intergas Central Asia” Monitoring of environment current condition on objects of “KazTransOil” CJSC. CJSC “KazTransOil” Local monitoring of environment current condition on Ktykmytyk field. CJSC “Anako” Monitoring of environment current condition during execution of offshore seismic acquisitions. LLP “Zhambai” Monitoring of seismic acquisition at Tub-Karagan site. LLP “Tub-Karagan Operating Company BV” Monitoring of seismic acquisition at Atash site. LLP “Atash Company” Ecological Audit SERVICES AND PROJECTS Pointing out and mapping of damaged landscapes Ecological audit of Zhusaly site. РННО “Petrom SA – Kazakhstan” identification of scales and intensity of pollution with heavy metals and oil products Assessment of technical condition of suspended well mouth at West Eskene site. Agip KCO Development recommendations damaged rehabilitation Ecological audit of Sinelnikovskoye contract territory. LLP “Ozturk Munay” of on sites Approval of audit results with state bodies Assessment of previously drilled well mouth at Sinelnikovskoye deposit. LLP “Ozturk Munay” Special Surveys Radioecological survey Location and contouring of polluted areas Estimation of the area and radioactive pollution intensiveness Classification of anomalies’ radioactive composition Estimation of polluted grounds volume Recommendations on minimization of radiation risks During operations execution the major accent was made on the safety of staff Оценка рисков и разработка мероприятий по их минимизации Individual means of protection Operative dissymmetric control Investigation on Body Counter, before commence and after operations completion (Kurchatov city, IRB) Special Surveys Ecological geochemistry of technology Definition of biological objects pollution level Geochemistry of transition zone sea – land Study of environment pollution process dynamics Estimation of environment conditions changes resulted from technogenic impact Recommendations aiming to decrease environmental impact on different components Partners and consultants Zoology Institute of RoK Ministry of Education and Science Geography Institute of RoK Ministry of Education and Science Soil Science Institute of RoK Ministry of Education and Science Chemical Science Institute of RoK Ministry of Education and Science Catalytical Chemistry Institute of RoK Ministry of Education and Science Geology Science Institute of RoK Ministry of Education and Science Botany Institute of RoK Ministry of Education and Science Kazakh Institute of Fish Industry of the Ministry of Agriculture Atyrau branch of Kazakh Institute of Fish Industry, Atyrau Department of science JSC “Atyraubalyk”, Atyrau Caspian Research Institute of Fish Industry, Astrakhan Ecocenter MTA, Moscow Radiation Safety Institute, Kurchatov Laboratories and Analytical Base OUR SUBCONTRACTORS Defining of hard metals on soils, water, and biological objects: “Alex Stewart (Assayers) LTD” laboratory –ICP methods Laboratory on the environment protection – atom-absorbent method , Atyrau city Laboratory Industrial Engineering Center “Geoanalitika” – atom-absorbent, chemical and spectrum, methods, Almaty city Defining of oil products, polycyclingaromatic hydrocarbons, phenols in soils, water, and biological materials: Laboratory of the Institute of chemical sciences mass-spectral method, Almaty city Defining of polluters in atmosphere and industrial disposals: Laboratory on the environment protection, Atyrau city “Ecoproject”, Almaty city “Kazecoanalyz” LLP , Almaty city Researches of gydrobintes (fitozooplancton, benthos, ichtuofauna): Atyrau affiliate of Kazakh Institute of Fish Industry, Atyrau city Caspian institute of fish industry, Astrakhan Laboratory “Atyraubalyk” JSC, Atyrau city Our Principles Compliance with environmental legislation and regulatory requirements of the Republic of Kazakhstan Fulfillment of overall Customer’s requirements Compliance with ecological; safety norms, mitigation of environmental impact during works Strict compliance with the provisions of Health and Labor Protection System developed in Company Priority Compliance with overall rules of health and labor protection Compliance of performed works with regulatory documents of the Republic of Kazakhstan Work quality Situation control – beginning from technical assignment creation and ending with public hearings and approval of work with Competent State Bodies Projects execution Project execution is performed with adherence to corporate standards CS1-CS13 Quality Management System Management is implemented based on resource planning using the licensed software systems Prima Vera or Microsoft Project Execution is implemented using Kazakhstani and International Standards Projects are executed taking into account Customer’s special requirements Techniques and Methods GIS technology – ArcGIS (ArcInfo), 9.0 MapInfo 7.0 Modern navigation equipment – GPS «Garmin-12» Modern software for the obtained data processing– Surfer, Grafor, Envi, MapSourse Satellite communication – telephones «THURAYA» Satellite images of various resolution – Lansat, IRS, Iconas Thank you for attention! «SED» LLP 3 Askarov, Almaty, 050043 Republic of Kazakhstan Tel.: (+7 727) 255-05-07, 295-48-19, 226-66-88 Fax: (+7 727) 295-48-20 Е-mail: [email protected], www.sed.kz