Transcript Document
Equivalent Uniform Annual Cost: A New Approach to Roof Life Cycle Analysis James L. Hoff, DBA Firestone Building Products Canadian Roofing Symposium Calgary, Alberta June 5, 2007 Life Cycle Cost Problems • How long do roofs last? • How much do roofs cost? • How do you compare roofs with different service lives? Life Cycle Cost Problems How Long Do Roofs Last? Average Service Life Study EPDM Asphalt BUR Cash (1997) 14.1 Years 17.4 Years Schneider & Keenan (1997) 17.7 Years 13.6 Years Life Cycle Cost Problems How Long Do Roofs Last? Manufacturer’s Warranty Period System Asphalt BUR Modified Bitumen Single-Ply Up to15 Years Up to 20 Years Up to 30 Years Type IV Felt Type VI Felt See Below MB Cap over Non-MB Base MB Cap over MB Base MB Cap over Multiple Plies 45 Mil 60 Mil 80-90 Mil Life Cycle Cost System Details / Est. Min. Service Life Service Life (SL) Based on Warranty Period (Years) SYSTEM TYPE SYSTEM DETAILS Ballasted EPDM 45 Mil Unreinforced EPDM over 2" Polysio, Loosely Laid and Ballasted 15 Ballasted EPDM 60 Mil Unreinforced EPDM over 2" Polysio, Loosely Laid and Ballasted 20 Adhered EPDM 45 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 15 Adhered EPDM 60 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 20 Adhered EPDM 90 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 30 Mech. Attached EPDM 45 Mil Unreinforced EPDM over 2" Polyiso, Mechanically Attached 15 Mech. Attached EPDM 45 Mil Reinforced EPDM over 2" Polyiso, Mechanically Attached 20 Mech. Attached Thermoplastic 45 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 15 Mech. Attached Thermoplastic 60 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 20 Mech. Attached Thermoplastic 80 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 30 Modified Bitumen Mopped Fiberglass Base / Mopped SBS Cap over Cover Board & 2" Polyiso 15 Modified Bitumen Mopped SBS Base / Mopped SBS Cap over Cover Board & 2" Polyiso 20 (2) Mopped SBS Base / Mopped SBS Cap over Cover Board & 2" Polyiso 30 Built-Up Roofing 4-Ply IV w/ Gravel over Cover Board & 2" Polyiso 15 Built-Up Roofing 4-Ply VI w/ Gravel over Cover Board & 2" Polyiso 20 Modified Bitumen System details and warranty period based on data from NRCA 2004-05 Low-Slope Roofing Materials Guide (2005) and published manufacturer data. Life Cycle Cost Problems How Much Do Roofs Cost? • Initial Cost • Maintenance Cost • Replacement Cost Life Cycle Cost Standard Life Cycle Cost Model LCC = IC + MCPV + RCPV Where: LCC = Life cycle cost ($/ sq. ft.) IC = Initial Cost MCPV = Present value of all future maintenance costs RCPV = Present value of future removal and replacement costs In other words, how much money in today’s dollars do I need to pay all the costs associated with this roof over its service life? Life Cycle Cost Standard Life Cycle Cost Model Replacement Cost Initial Cost Maintenance Cost $ Year 1 Year 2 Year 3 Year 4 $ Present Value Year 5 Year N Standard Life Cycle Cost Model How to Calculate Standard LCC: 1. Determine System / Service Life 2. Determine Cost Elements a. Initial Cost b. Annual Maintenance Costs c. Replacement Cost 3. Adjust Cost Elements to Present Value a. Determine Cost of Money / Interest Rate b. Discount Replacement Cost to Present Value c. Annuitize Maintenance Cost to Present Value 4. Add Adjusted Cost Elements Together Standard Life Cycle Cost Model Step 1: Determine System / Service Life Service Life (SL) Based on Warranty Period (Years) SYSTEM TYPE SYSTEM DETAILS Ballasted EPDM 45 Mil Unreinforced EPDM over 2" Polysio, Loosely Laid and Ballasted 15 Ballasted EPDM 60 Mil Unreinforced EPDM over 2" Polysio, Loosely Laid and Ballasted 20 Adhered EPDM 45 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 15 Adhered EPDM 60 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 20 Adhered EPDM 90 Mil Unreinforced EPDM over 2" Polyiso, Fully Adhered 30 Mech. Attached EPDM 45 Mil Unreinforced EPDM over 2" Polyiso, Mechanically Attached 15 Mech. Attached EPDM 45 Mil Reinforced EPDM over 2" Polyiso, Mechanically Attached 20 Mech. Attached Thermoplastic 45 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 15 Mech. Attached Thermoplastic 60 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 20 Mech. Attached Thermoplastic 80 Mil Reinf. T'Plastic over 2" Polyiso, Mechanically Attached 30 Modified Bitumen Mopped Fiberglass Base / Mopped SBS Cap over Cover Board & 2" Polyiso 15 Modified Bitumen Mopped SBS Base / Mopped SBS Cap over Cover Board & 2" Polyiso 20 (2) Mopped SBS Base / Mopped SBS Cap over Cover Board & 2" Polyiso 30 Built-Up Roofing 4-Ply IV w/ Gravel over Cover Board & 2" Polyiso 15 Built-Up Roofing 4-Ply VI w/ Gravel over Cover Board & 2" Polyiso 20 Modified Bitumen System details and warranty period based on data from NRCA 2004-05 Low-Slope Roofing Materials Guide (2005) and published manufacturer data. Standard Life Cycle Cost Model Step 2: Determine Cost Elements SERVICE LIFE INITIAL COST RELPACEMENT COST MAINTENANCE COST (SL) (IC) (RC) (MC - Annual) Based on Based on 2005 Equals IC Based on Warranty Period Contractor Survey Plus $1.00 Disposal Cost Cash (1997) Study (Years) ($ / SF) ($ / SF) ($ / SF / YR) Ballasted EPDM 15 $2.85 $3.85 $0.20 Ballasted EPDM 20 $3.00 $4.00 $0.20 Adhered EPDM 15 $3.25 $4.25 $0.20 Adhered EPDM 20 $3.45 $4.45 $0.20 Adhered EPDM 30 $4.00 $5.00 $0.20 Mech. Attached EPDM 15 $3.35 $4.35 $0.20 Mech. Attached EPDM 20 $3.55 $4.55 $0.20 Mech. Attached Thermoplastic 15 $3.40 $4.40 $0.20 Mech. Attached Thermoplastic 20 $3.65 $4.65 $0.20 Mech. Attached Thermoplastic 30 $4.20 $5.20 $0.20 Modified Bitumen 15 $3.25 $4.25 $0.20 Modified Bitumen 20 $3.70 $4.70 $0.20 Modified Bitumen 30 $4.20 $5.20 $0.20 Built-Up Roofing 15 $3.60 $4.60 $0.20 Built-Up Roofing 20 $3.80 $4.80 $0.20 SYSTEM TYPE Initial cost data derived from contractor survey. Replacement and maintenance cost data derived from Cash (1997). Standard Life Cycle Cost Model Step 3: Adjust Costs To Present Value a. Determine Cost of Money This Example: 5% Annual Interest Rate b. Discount Replacement Cost to Present Value Replace At: PV Discount Rate: 15 Years 20 Years 30 Years 48% 38% 23% c. Annuitize Annual Maintenance Cost to Present Value Service Life: Initial Annuity: 15 Years 20 Years 30 Years 11 X Annual Cost 13 X Annual Cost 16 X Annual Cost Standard Life Cycle Cost Model Step 4: Summarize Adjusted Cost Elements REPLACEMENT COST MAINTENANCE COST LIFE CYCLE COST (RC) (MC) (LCC) SERVICE INITIAL LIFE COST Basic Present Value Adjusted Cost Annual Present Value Adjusted Cost SYSTEM TYPE (SL) (Years) (IC) ($ / SF) Cost ($ / SF) Adjustment (5% APR) RCpv ($ / SF) Maint. Cost ($/ SF) Adjustment (5% APR) MCpv ($/ SF) IC + RCpv + MCpv ($ / SF) Ballasted EPDM 15 $2.85 $3.85 0.48 $1.85 $0.2000 11 $2.20 $6.90 Ballasted EPDM 20 $3.00 $4.00 0.38 $1.52 $0.2000 13 $2.60 $7.12 Adhered EPDM 15 $3.25 $4.25 0.48 $2.04 $0.2000 11 $2.20 $7.49 Adhered EPDM 20 $3.45 $4.45 0.38 $1.69 $0.2000 13 $2.60 $7.74 Adhered EPDM 30 $4.00 $5.00 0.23 $1.15 $0.2000 16 $3.20 $8.35 Mech. Attached EPDM 15 $3.35 $4.35 0.48 $2.09 $0.2000 11 $2.20 $7.64 Mech. Attached EPDM 20 $3.55 $4.55 0.38 $1.73 $0.2000 13 $2.60 $7.88 Mech. Attached T'Plastic 15 $3.40 $4.40 0.48 $2.11 $0.2000 11 $2.20 $7.71 Mech. Attached T'Plastic 20 $3.65 $4.65 0.38 $1.77 $0.2000 13 $2.60 $8.02 Mech. Attached T'Plastic 30 $4.20 $5.20 0.23 $1.20 $0.2000 16 $3.20 $8.60 Modified Bitumen 15 $3.25 $4.25 0.48 $2.04 $0.2000 11 $2.20 $7.49 Modified Bitumen 20 $3.70 $4.70 0.38 $1.79 $0.2000 13 $2.60 $8.09 Modified Bitumen 30 $4.20 $5.20 0.23 $1.20 $0.2000 16 $3.20 $8.60 Built-Up Roofing 15 $3.60 $4.60 0.48 $2.21 $0.2000 11 $2.20 $8.01 Built-Up Roofing 20 $3.80 $4.80 0.38 $1.82 $0.2000 13 $2.60 $8.22 Life Cycle Cost Standard Life Cycle Cost Model Life Cycle Cost at Present Value (Dollars per Square Foot) $8.09 $8.60 $7.49 15 Year MB 20 Year MB 30 Year MB Life Cycle Cost Standard Life Cycle Cost Model Life Cycle Cost at Present Value (Dollars per Square Foot) $8.35 $7.49 $7.74 15 Year EPDM 20 Year EPDM 30 Year EPDM (Adhered 45 mil) (Adhered 60 mil) (Adhered 90 mil) Life Cycle Cost Standard Life Cycle Cost Model Life Cycle Cost at Present Value (Dollars per Square Foot) 15 Year System 20 Year System 30 Year System … but which system is the best investment? Life Cycle Cost Equivalent Annual Uniform Cost Model EUAC = A/P LCC (i,n) Where: EUAC = Equivalent Uniform Annual Cost A/P = Annualized cash flow or payment ($ / sq. ft.) LCC = Standard Life Cycle Cost i = annual interest rate (%) n = service life (years) Life Cycle Cost Equivalent Annual Uniform Cost Model (EUAC) $ ….. = Standard LCC Payment Year 1 Payment Year 2 Payment Year 3 Payment Year N In other words, what are my estimated annual payments over the service life of this roof? Life Cycle Cost Equivalent Annual Uniform Cost Model How to Calculate EUAC: 1. Calculate Standard Life Cycle Cost 2. Calculate the Annual “Payments” Required to Finance a. Over The Service Life b. At a Defined Interest Rate EUAC = A/PLCC(i,n) Life Cycle Cost Equivalent Annual Uniform Cost Model Equivalent Uniform Annual Cost (Annual Dollars per Square Foot) $0.72 15 Year MB $0.65 20 Year MB $0.56 30 Year MB Life Cycle Cost Equivalent Uniform Annual Cost Model Equivalent Uniform Annual Cost (Annual Dollars per Square Foot) $0.72 $0.62 $0.54 15 Year EPDM 20 Year EPDM 30 Year EPDM (Adhered 45 mil) (Adhered 60 mil) (Adhered 90 mil) Life Cycle Cost Equivalent Uniform Annual Cost $.74 $.72 $.66 $.63 $.62 $.57 Ballasted EPDM 15 Year System $.65 Mech. Att. EPDM $.72 $.66 $.65 $.56 $.54 Adhered EPDM $.72 $.72 Mech. Att. T'Plastic 20 Year System $.56 Modified Bitumen Built-Up Roofing 30 Year System Life Cycle Cost Conclusions 1. EUAC may be very useful in comparing the value of roof systems with different service lives. 2. Specification enhancements such as thicker membranes and redundant details appear to add tangible value. 3. Using the EUAC method, the life cycle costs of different roofing systems appear to be very close over the same time frames. Life Cycle Cost References Boon, R. A. (2001).Better roofs are less expensive. Roofing Contractor, November. Cash, C. G. (1997). The relative durability of low-slope roofing. Proceedings of the Fourth International Symposium on Roofing Technology, 119-124. National Roofing Contractors Association: Rosemont, IL. Hoff, J. L. (2007) Equivalent uniform annual cost: A new approach to life cycle cost analysis. RCI Interface, January, 2006. Fuller, S. K., & Rushing, A. S. (2005). Energy price indices and discount factors for life-cycle cost analysis, April 1, 2005 to March 31, 2006. Annual supplement to NIST Handbook 135 and NBS special publication 709 (NISTIR 85-3273-20). Gaithersburg, MD: National Institute of Standards and Technology. 2004-05 Low-Slope Roofing Materials Guide (2005). Rosemont, IL: National Roofing Contractors Association. Means Building Construction Cost Data (2005). Kingston, MA: R. S. Means. Schneider, K. G., & Keenan, A. S. (1997). A documented historical performance of roofing assemblies in the United States 1975-1996. Proceedings of the Fourth International Symposium on Roofing Technology, 132-137. Rosemont, IL: National Roofing Contractors Association. White paper on sustainability (2003). Building Design & Construction, November supplement.