Transcript Slide 1
KEY STRATEGIES OF IWMP SLNA, Commissioner Rural Development Govt. of Andhra Pradesh NRM strategy in convergence with MG-NREGS Segregation of NRM based Projects for implementation by IWMP & MG-NREGS in IWMP villages 12 Projects out of 22 Projects taken up by IWMP staff in IWMP villages Sharing of funds between both the programmes based on the type projects executed as well as for Human Resource services Ground Water Recharge, Drainage Line Treatment, Afforestation, Common Property resources Projects Land Development & Fodder Devt. Projects Dry Land Horticulture Others – Flood control, Roads etc Land Devt. works Watershed Computer Centre Mandal Computer Centre Watershed Computer Centre Mandal Computer Centre Fodder NREGS FUNDS IWMP FUNDS NREGS Funds NRM Shelf of works With NREGS fund With NREGS With IWMP Staff staff Land Development & Soil Moisture conservation works Jungle clearance , Boulders removal, Stone bund, Trench cum bund, Terracing on hill slopes, Silt application, Compost pit etc IWMP Fund With IWMP staff (Removed from software of NREGS for IWMP villages to avoid duplication) Staggered trenches, Water Drainage Line Absorption Trench, Live checks, Treatment works, Sunken pits, Loose boulders, Rock fill dams etc Dry Land Mini Percolation tanks, Percolation Horticulture & tanks, Check dams, Farm ponds, Water Harvesting Fodder Gabions, Sub surface dams, Repairs Structures Development to existing water harvesting works like structures etc Fodder Plots, Block plantation, Barren Hill Fodder Afforestation Afforestation, Avenue, Bund nurseries, Silo works plantation, Back yard plantation pits, Raising of Common silvi pasture etc Property Seed dibbling, Trenches, Fire tracing, Resource Plantation, Cattle Proof trench etc development works New Activities Sl No II Project Land Development Projects (I to VII) Name of the work 1 a b c d 2 III IV Drainage line treatment Project Common Property Resource Project Dry land horticulture Acid lime Sapota Ber Guava Boulder removal using machinery & Stone bunding 1 Sand bag structures 1 Cattle troughs Activities extended to other farmers with Differential costs & WDF Sl N o Project Name of the work Benefici Project ary Remar Fund ks contribut (%) ion (%) I With Differential costs: Through Beneficiary contribution Block plantation in 1 Private lands a Subabul b Teak Limited Afforesta- c Tamarind 1 to 1 Ha tion project d Casuarina 40% 60% per e Bamboo farmer f Simaroba Live fencing with Agave 2 / Henna Activities extended to other farmers with Differential costs & WDF Sl No II 1 Benefici ary Project Rema Project Name of the work contribut Fund (%) rks ion (%) With Differential costs: Through Beneficiary contribution Dry land 1 horticulture a Cashew b Custard Apple c Mango d Jamun Land limited e Ber Development to 1 Ha 40% 60% f Guava Projects per (I to VII) g Sapota farmer h Acid lime 2 Tank silt application Boulder removal 3 using machinery & Stone bunding Activities extended to other farmers with Differential costs & WDF Sl Project No Name of the work Beneficiary Project Rema contribution Fund (%) rks (%) III Without Differential costs: Through collection of WDF amount Farm pond Dug out pond 1 Ground Water Recharge Project 10% of amount shall be collected as WDF Mini Percolation Tank Percolation Tank Check wall Check Dam 20% of amount shall be collected as WDF Convergence strategy with Forest Forest Dept. Dept • Mapping of actual catchment areas falling under Reserve Forest areas using GIS • Treatment of Reserve Forest Area falling in IWMP project area through Forest Dept. • Funds for treatment of Forest Areas shall be allocated from MG-NRES • Convergence meetings arranged at district level for delineation of areas and action plan preparation • Capacity Building to VSS members on IWMP • Tie up with AH interventions • Avenue, Barren Hill Afforestation, Block Plantation & CCT/WAT are major interventions proposed Production Systems Improvement (Agricluture) with CMSA, SERP •Objectives: –To switch-over to organic agriculture in all Watershed villages –To double the income of the farmers •Coverage: –1,100 villages in IWMP 2009-10 & 2010-11 WSs –Balance 800 of 2009-10 & 2010-11 & 1,400 villages of 2011-12 will be taken up in 2012-13 •Strategy: Implementation through Village organizations •Interventions: –Increasing productivity of Natural resources by addressing problems in agriculture and allied subjects. –Soil Fertility management , Integrated Crop Management –Sustaining farming methods –Convergence for best practices with CMSA, Agril , AH Depts, CRIDA, ICRISAT, ANGRU etc –Breed improvement, Fodder Development & Nutrition Management etc. PSIAnimal Husbandry strategy Formulated to implement in convergence with Dept. of Animal Husbandry • To increase the productivity of the livestock in IWMP villages through interventions in area of : Intervention Activities Health coverage Organizing Health camps Fertility camps Sheep health camps in regular intervals of 3 months to protect the LS from seasonal diseases and improve the fertility rate Provide Mineral Mixture , Mineral Blocks on 50% to check micro nutrient deficiency and improve the productivity Nutritional Support To provide feed on 50% cost to pregnant Milch animals and AI born calves to improve calf development and milk yield. Breed improvement Provide Rs 50 as inventive to Gopalamitra working in IWMP villages for each true to type female calf born to encourage timely result oriented door step service. Encourage back yard poultry by supplying improved poultry birds on 50% cost to SC,ST,and POP. PSIAnimal Husbandry strategy Intervention Activities AH infrastructure Provide Trevices , Community based chaff cutters, Development in the Castrators, other infrastructure needed for AH IWMP villages services in IWMP villages Capacity building of the Orientation of farmers on clean milk production LS owners and best husbandry practices Orient the sheep rearers on best sheep husbandry practices • • Creating forward linkage for milk market in convergence with APDDCF Ltd by establishing AMCUs and upgrading the EMTs under EPA Discussions on PSI intervention in convergence with LPD unit of SERP in State Milk mission villages falling in IWMP villages are undertaken. Livelihoods strategy with SERP Salient features: • Identification of poorest of the poor households at village level • Coverage of Poor & PoP under Self Help Groups (SHGs) • Preparation of Livelihood Action Plans and approval by Village Organization & Watershed Committee • Financial assistance on credit basis to individuals through SHGs • Customization and application of software based MIS of SERP • Facilitation through Livelihood Activist (LA) positioned at watershed level • Organizing required training programmes • Convergence with other schemes/ bilateral agencies through SERP. Status: An amount of Rs. 7904.14 lakhs is proposed for release during 2012-13 against which already released Rs. 3067.89 lakhs. IWMP - PoP Implementation Process in a nutshell: Step I Step II Step III Step IV Finalization of IWMP villages & VOs Training CAs / LAs on Baseline Survey Training CAs / LAs on HLP Training of Beneficiaries Identification of PoP HH Collection of Baseline survey Short listing of HHs based on Baseline Implementatio n of HLPs Computerizing baseline Preparation & computerizati on of HLPs Collection & computerizati on of UCs Selection of PoP CA / LA Computerizing identified PoP HH Process Flow VO (Preparation of LAP) MMS PO-WS PD-DWMA PD – DRDA Collector (For Admin Sanction) VO Role of PD - DWMA 1. Scrutinize and consolidate village wise LAP and forward to PD – DRDA with his/ her recommendations. 2. Monitor placement of Livelihood Activists (LA) in non PoP villages. 3. Ensure that funds are not transferred to the villages where IWMP activities are not grounded. 4. Finalize the list of Villages / VOs to whom the funds have to be transferred in consultation with DRDA. Non performing and dysfunctional VOs should not be allotted funds for LH component under IWMP. 5. Facilitate convergence meetings with line departments/ agencies at district level. 6. Arrange training programmes for IWMP staff at D/ CLRC and facilitate PD, DRDA to conduct the same out of I&CB funds of IWMP. 7. Regular reviews with IWMP and SERP field staff for implementation of the programme. 8. Overall monitoring of the implementation in the district and giving the feedback to SLNA for the same. Entry Point Activities Non Negotiables : •It should benefit to a group / larger community for creating common assets / providing common benefits •Individual benefits are not permitted. •Civil works and cement structures are not permitted. •Duplication of work/ services is not permitted. •EPA shall be grounded in the first one /two years of project period.. Entry Point Activities – Focus areas • Water treatment plants/ RO plants should be taken up in limited number as a pilot basis in the districts with minimum of 20% contribution from the community. • The sanction of EPA activities in IWMP 2009-10 projects should be completed before 31st July 12. It will not be allowed after 1st August 2012. • The EPA activities in IWMP 2011-12 projects shall be taken up simultaneously along with DPR preparation without waiting for finalization of DPRs • If EPA activities are not grounded in any of the projects, the EPA amount shall be diverted into NRM component. Institution & Capacity Building Three Tier Capacity Building Strategy for strengthening Field level Functionaries: State reviews for CB team Mana TV programs WSAs trainings through ROs Development of I&CB software for conduct of trainings/exposures under IWMP. Development of IEC material – Annual calendars, Posters, short films, etc. Preparation of Annual calendars by all districts for 2012-13 fin. year Monitoring & Evaluation Customization of transaction based software model for IWMP in coordination with TCS • Fund flow mechanism through Management System (eFMS) Electronic Fund • Software based execution of IWMP interventions • Web based Management Information Systems (MIS) Centralized data entry of DOLR MIS Adoption of Social Audit process for IWMP watersheds Guidelines for Quality Control of IWMP works have been issued Third Party evaluations for declaration of Preparatory Phase of IWMP Batch I have commenced Integrated Participatory approach in establishing Hydrological Monitoring Network in Model Watersheds Inception of idea Step-1 Step-2 Step-3 Stakeholder identification Input from experts and Key Stakeholder Defining the scope of the network Installation Step-4 Monitoring Step-5 End User Step-6 Feedback to Key Stakeholder Initiatives to be taken up in Model Watersheds Establishment of Hydrological Gauging Stations and Weather Stations Participatory Research & Development (PR&D). Selection of Crops and Cultivars PR&D INM & IPM Trials Rehabilitation of Waste Lands Scientific Impact Assessment & Evaluation Studies Partnership with Technical Support Institutions Forage Production Live-Stock based activities Participatory Evaluation & Monitoring (PE& M). Strategic Research List of Model Watersheds proposed in IWMP Districts Sl.No Name of the District Name of the Mandal Name of the Project Batch Project Area proposed for Treatment (Area in ha.) 1 2 3 4 Muttala 5 6 2009-10 2,535 1 Ananthapur Atmakur 2 Chittoor Yerravaripalem Yellamanda 2009-10 3,668 3 Medak Kondapur Mallepally 2009-10 5,300 4 Kurnool Orvakallu Somarajulapally 2009-10 5,510 5 Prakasam Mundlamuru Polavaram 2009-10 4,600 6 Mahaboobnagar Koilkonda Parepally 2009-10 3,800 7 8 9 YSR-Kadapa Nalgonda Srikakulam Veeraballe Munugode Laveru Veeraballe Pulipalpula Laveru 2009-10 2010-11 2009-10 4,000 4,324 4,476 10 Rangareddy Yacharam Nandiwana parthy 2009-10 4,024 11 Adilabad Tamsi Dhanora 2009-10 4,691 12 Khammam Mulkalapally Chaparalla pally 2009-10 5,100 PROGRESS OF NRM WORKS UNDER IWMP 2009-10 UP TO 30TH APRIL 2012 Progress Sl No District 1 2 3 4 5 6 7 8 9 Anantapur Chittoor Kadapa Khammam Prakasam Srikakulam Adilabad Nalgonda Medak 10 Mahabubnagar 11 12 Ranga Reddy Kurnool Total Target No of % of Admin Sanctions Expenditure (Rs in zero progr Lakhs) Phy Fin (Rs in Phy (No Fin (Rs IWMP ess of (15%) (No of Lakhs) Projects in Lakhs) works) works) 1065.69 4634 8229.74 1549 0 860.93 80.79 684.45 3307 2019.17 1190 0 386.83 56.52 504.00 0 832 705.08 449 203.09 40.30 180.00 510 391.90 316 0 69.95 38.86 1216.80 1841 1668.32 0 777 400.17 32.89 351.14 0 990 413.89 482 96.11 27.37 648.00 1938 964.37 983 0 156.52 24.15 621.00 1298 0 721.43 566 147.27 23.71 455.40 0 474 3490.45 320 94.44 20.74 1154.70 2421 1359.34 1 1495 232.89 20.17 506.57 2184 0 805.53 541 65.88 13.01 1134.18 2553 1321.71 785 0 139.76 12.32 8521.94 22982 22090.93 9453 2853.84 33.49 1 No of Zero Micro WSs 0 0 0 0 0 0 0 0 0 7 0 0 7 PROGRESS OF NRM WORKS UNDER IWMP 2010-11 UP TO 30TH APRIL 2012 Progress Sl No 1 2 3 4 5 6 7 8 9 10 11 12 District Srikakulam Anantapur Nalgonda Kadapa Chittoor Adilabad Kurnool Prakasam Medak Khammam Mahabubnagar Ranga Reddy Total Target for NRM (Rs in Lakhs) (7%) 177.3492 896.2506 456.0948 520.4472 647.892 416.9424 586.4712 686.0196 389.5248 153.132 799.4784 521.6652 6251.2674 No of Admin Sanctions Expenditure % of zero progr IWMP Phy ( Phy (No Fin (Rs ess Projec Fin (Rs in No of of in ts Lakhs) works works) Lakhs) ) 271 233.38 49 16.07 9.06 0 2159 3034.97 336 58.48 6.52 3 1247 642.66 214 29.06 6.37 2 640 380.16 126 31.26 6.01 2 1530 898.18 138 34.88 5.38 5 1494 687.05 152 12.99 3.12 2 3045 908.95 183 12.99 2.21 2 207 319.50 30 12.69 1.85 13 223 470.16 25 6.58 1.69 4 248 97.13 16 0.82 0.54 1 278 128.30 14 3.16 0.40 20 365 282.04 4 0.6 0.12 4 11707 8082.47 1287 219.58 3.51 57 No of Zero Micro WSs 0 11 16 9 36 10 6 70 30 6 129 36 353 PROGRESS OF NRM WORKS -2009-10 FROM 25TH APRIL TO 15TH JUNE 2012 Progess (Rs in Lakhs) No of No of % of zero Zero progress IWMP Micro Projects WSs 24.39 2 15 18.46 1 5 15.80 2 12 SL No District Financial Target for NRM (Rs in Lakhs) 1 2 3 Anantapur Kurnool Chittoor 288.26 118.88 147.38 70.32 21.95 23.28 4 Mahabub nagar 75.25 9.98 13.26 5 32 5 6 7 8 9 10 11 12 Adilabad Prakasam Kadapa Nalgonda Ranga Reddy Srikakulam Khammam Medak Total 172.62 279.19 156.62 156.95 106.23 158.23 40.19 338.56 2038.35 22.03 28.36 15.66 12.59 7.83 5.97 1.25 4.71 223.93 12.76 10.16 10.00 8.02 7.37 3.77 3.11 1.39 10.99 1 4 0 1 1 0 0 0 17 4 22 0 6 5 0 0 0 101 PROGRESS OF NRM WORKS -2010-11 FROM 25TH APRIL TO 15TH JUNE 2012 No of No of Progess % of zero Zero (Rs in progress IWMP Micro Lakhs) Projects WSs 31.7 9.65 5 20 22.41 8.78 5 36 11.41 7.53 4 31 10.78 3.59 3 15 9.02 3.01 16 89 5.72 4.55 2 10 5.08 4.20 7 35 4.74 4.10 0 0 4.4 1.57 6 43 SL No District Target for NRM (Rs in Lakhs) 1 2 3 4 5 6 7 8 9 Anantapur Chittoor Nalgonda Kadapa Prakasam Adilabad Kurnool Srikakulam Medak 328.55 255.26 151.54 299.94 299.39 125.77 121.10 115.61 279.53 10 Mahabub nagar 115.46 2.01 1.74 20 129 11 12 Ranga Reddy Khammam Total 171.26 51.39 2314.79 0.72 0.65 108.64 0.42 1.26 4.69 10 1 79 76 6 490 NRM - Focus Areas For effective grounding of works, the following are the initiatives to be taken up •Continuous estimates generation as per the annual action plan by POs •Timely accord of administrative sanctions for the works proposed •Grounding of machinery works along with already sanctioned works with out delay. •Regular field visit to WCCs,Watersheds •Review of progress communicated by SLNA against plans & targets PROGRESS IN DRY LAND HORTICULTURE Batch 2009-10 Sanctioned Executed Sl No District Targe t in Area in Ha (HA) 1 2 3 4 5 6 Adilabad Anantapur Chittoor Kadapa Khammam Kurnool 500 93 3000 8547 2500 2639 500 54 400 660 1500 352 3 6709 711 15 162 91 80 2718 1621 26 296 83 1 612 182 4 24 6 1000 5000 4000 1500 600 1500 7 Mahabubnagar 1500 1624 Medak 500 159 8 Nalgonda 500 491 9 Prakasam 1000 89 10 373 41 131 24 428 70 178 0 31 4 9 0 2000 11 Ranga Reddy 500 1140 300 549 12 Srikakulam Total 12700 16396 164 88 8512 16 314 5829 1 11 885 1000 Estt Expen Target Area Cost diture in Ha in (Rs in (Rs in (HA) Lakhs) Lakhs) 800 1000 1500 2010-11 Sanctioned Executed Expen Estt Area Area diture Cost in in (Rs in (Rs in (HA) (HA) Lakhs Lakhs) ) 0 0 0 0 2958 2477 471 49 631 156 52 2 0 0 0 0 0 0 0 0 0 0 0 0 44 0 17 0 12 0 4 0 0 0 400 0 0 20300 3651 2649 0 0 0 0 0 0 0 0 0 0 523 0 0 50 PROGRESS OF BLOCK & BUND PLANTATION (2009-10 Batch) Block Plantation Sanctioned Executed Sl No District Adilabad 2 Anantapur 3 Chittoor 4 Kadapa 5 Khammam 6 Kurnool 7 Mahabubnagar 8 Medak 9 Nalgonda 10 Prakasam 11 Ranga Reddy 12 Srikakulam 1 Estt Area in Cost(Rs in (HA) Lakhs) 11 6.5 0 1 0 10 0 16 0 0 15 0 2.16 346.23 32.79 126.9 0 192.5 0 2.13 0 17.91 21.09 0 Area Expenditu in re (Rs in (HA) Lakhs) 1 23 2 14 0 11 0 0 0 1 4 0 0.07 38.3 0.98 13.78 0 11.18 0 0 0 0.42 0.55 0 Bund Plantation Sanctioned Executed Estimate Expenditu Area in d Cost Area in re (Rs in (HA) (Rs in (HA) Lakhs) Lakhs) 7 0 663.39 81.34 0 0 0 0 0 0 62.22 23.16 0.91 0 24.54 1.84 0 0 0 0 0 0 16.24 4.83 0 0 48.83 9.5 0 0 0 0 0 0 0 23.16 0 0 0.38 0.16 0 0 0 0 0 0 0 0.28 Progress of BHA & Avenue Plantation (2009-10 IWMP Batch) BHA Avenue plantation Estt Expendi Cost Phy Physical ture (Rs (Rs in (No) (No) in Lakhs Lakhs) ) 1 0.63 1 0.04 14 82.98 7 6.77 14 56.85 1 0.19 0 0 0 0 0 0 0 0 7 21.46 2 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sl No District 1 2 3 4 5 6 7 8 9 10 Adilabad Anantapur Chittoor Kadapa Khammam Kurnool Mahabubnagar Medak Nalgonda Prakasam 11 Ranga Reddy 3 2.97 0 12 Srikakulam 0 0 0 Phy (No) Estt Cost (Rs in Lakhs) Phy (No) Expendi ture (Rs in Lakhs) 4 18 8 22 0 35 0 3 32 15 57.14 160.4 61.25 139.7 0 269.24 0 21.11 277.06 81.09 1 5 3 19 0 14 0 1 19 8 0.71 2.67 0.97 16.19 0 5.05 0 0.23 10.96 1.73 0 14 115.22 0 0 0 0 0 0 0 Plantation - Focus Areas • • • • • The survival of all the plantation taken up should be ensured. The targets communicated by SLNA should be achieved The plantation activities in community lands and private lands should be taken up on top priority. The estimates should be generated for the identified plantation activities , get admn sanctions and preparatory activities should be taken up immediately before onset of monsoon Plantation should be taken up with 1st showers to ensure good survival of plantation. District wise Action Plan & Progress of Fodder Plantation 2009-10 Sanctioned Executed SL No District Adilabad 1 2 Anantapur Chittoor 3 Kadapa 4 5 Khammam Kurnool 6 7 Mahabubnagar Medak 8 9 Nalgonda 10 Prakasam 11 Ranga Reddy 12 Srikakulam Total 13 2010-11 Sanctioned Executed Expendi Expendi Estt Cost Estimated Area in Area in ture (Rs Area in Area in ture(Rs (Rs in Cost(Rs in (HA) (HA) in (HA) (HA) in Lakhs) Lakhs) Lakhs) Lakhs) 68 383.17 367.28 210.355 50.5 271.88 354.95 25 834.78 409.55 541.695 270.52 3787.68 17.03 1 0.06 96.88 24.5 0.96 93.58 133.64 6.82 51.68 79.09 4.17 12.83 6 0.11 68.3 76.06 3.09 88.87 41.95 1.95 6.35 0 0 133.3 71 1.64 103.61 24.83 0.56 132.42 209.05 5.93 72.76 55.43 0.43 877.62 722.55 25.73 4 254.81 278.65 1 0 0 3.3 0 467 0 46.45 270.85 1326.06 1.02 64.75 65.54 0.25 0 0 0.84 0 61.41 0 11.8 74.95 280.55 0 27.6 79.35 1 0 0 0 0 72 0 1.5 88.5 269.95 0 1.43 4.31 0.07 0 0 0 0 2.09 0 0.01 1.46 33 9.38 AFFORESTATION – Nursery Raising • Finalization of nursery and plantation works. • Instructions were given to asses the requirement of seedlings for taking up plantation activities in 1st & 2nd batch watershed areas during 2012 rainy season • Explore the possibilities for getting the various species from the existing MGVN nurseries for meeting the plants requirement for taking up various plantations. • Assess Teak seedlings for block & bund plantation, and on the bunds of other farmers. • Species having local demand which are not available in MGVN nurseries AFFORESTATION • Selection of DWMA, MGVN and Govt., Nursery sites for raising of teak & locally demanded seedlings • Decided to raise 20,000 Teak seedlings per IWMP project. • Based on the requirement the tentative targets were assessed. • The targets assessed earlier are not tallying with present targets furnished. • Action Plan for Afforestation works - requirement of seedlings in IWMP 1st & 2nd batch Projects – 21 column proforma communicated on 29.02.2012. District wise proposed Teak Seedlings Sl No Name of the District No. of projects Targets (in lakhs) Locations Achieveme nt (in lakhs) 1 Adilabad 21 4.20 12 2.20 2 Anantapur 41 8.20 29 3.50 3 Chittoor 27 5.40 10 4.10 4 Kadapa 21 4.20 0 2.00 5 Khammam 6 1.20 0 1.20 6 Kurnool 29 5.80 6 2.00 7 Mahaboobnagar 38 7.60 10 7.60 8 Medak 15 3.0 10 3.00 9 Nalgonda 22 4.40 0 2.50 10 Prakasam 32 6.40 0 6.40 11 Rangareddy 20 4.00 6 2.50 12 Srikakulam 9 1.80 0 1.00 281 56.20 83 38.00 Total: Time Line for Nursery & Planting Activities S.No Activity Time line 1 Tying up MGVN Nurseries 20.05.2012 2 Tagging of Watershed villages with planting activity to Tech.Officers & Watershed Assistants 20.05.2012 3 Selection of tall plants for Avenue & non Teak species for other plantations 31.05.2012 4 Pitting in farmers’ land & CPR lands for raising Avenue, Bund & Block plantations 31.05.2012 5 Segregation of seedlings & hardening 10.06.2012 6 Transportation of plants to farmers fields and to plantation sites (where ever water facility is available) 15.06.2012 7 Planting activity on the onset of Monsoon 1.7.2012 to 15.07.2012 8 Casualty replacement 15 days after planting PSI – CMSA Progress The CMSA activities should be grounded immediately in all CMSA villages in convergence with CMSA staff The monthly convergence & review meeting at district level with PD, DRDA , cluster level convergence meetings with CMSAIWMP staff should be conducted regularly The CMSA activities in all non CMSA villages should be initiated with IWMP staff using technical help of SERP. Soil profile of the IWMP project should be prepared and the results should be shared with the farmers and the community. Necessary tie up with line dept like Horticulture etc should be made for supply of mini kits where ever possible Progress of Production systems improvement No of Villages No of VO accounts to be opened No VO Accounts opened Amount Released (Rs In Lakhs) No of Villages No of VO accounts to be opened No VO Accounts opened Amount Released (Rs In Lakhs) 73 Amount Released (Rs In Lakhs) No of Villages 21 No VO Accounts opened No of Projects Adilabad NGO No of VO accounts to be opened Name of the District 1 Non CMSA No of Villages Sl. No CMSA 37 6 34 29.52 47 21 46 17 25 14 11 11.00 2 Anantapur 41 201 53 53 53 48 95 95 85 47.5 57 57 50 57.00 3 Chittoor 27 169 42 42 42 42 123 123 123 29.20 4 4 4 4.00 4 Kadapa 20 118 90 29 47 40 74 68 57 24 0 0 0 0.00 5 Khammam 6 130 55 42 42 16.00 75 38 22 0.00 0 0 0 0.00 6 Kurnool Mahabub nagar 29 132 51 0 51 51 67 0 67 0 14 0 14 0.00 38 328 85 85 60 57 219 219 65 30.25 24 24 9 9.00 8 Medak 15 15 115 41 41 41 41 74 74 0 0 0 0 0.00 9 Nalgonda 22 22 139 37 37 37 35 94 94 47 10 8 8 0.00 32 190 33 33 31 31 157 157 61 30.5 0 0 0 0.00 20 121 26 26 26 17 67 67 67 0 35 35 35 0.00 9 100 26 26 26 26 73 73 40 16 0 0 0 0.00 752 420 131 81.00 39 7 10 Prakasam Ranga 11 Reddy 12 Srikakulam Total 280 1599 490 435.5 1073 1029 801 241.5 169 142 CMSA Interventions Name of work NADEP Compost pits (@10 per village Kitchen gardens NPM shops Custom hiring centres No of units identified No of units grounded 4856 1791 18951 465 334 6950 390 117 PSI-Animal Husbandry PSI AH: 2009-10: • Chittoor, Kurnool, Prakasam, Nalgonda only started releasing funds to JD AHs under PSI AH. Remaining PDs also shall release the funds immediately to start grounding of activities immediately. PSI AH 2010-11: • Chittoor, Kurnool, only released funds to JDAHs under PSI (AH). All the remaining PDs to release the funds immediately. Batch wise and district wise fund releases particulars are given in Table Action Points under AH interventions • Release of funds to JD AHs as per action plans under EPA and PSI AH to start grounding of activities by AH Department as season is approaching. • Arrange meeting with AHD officials and prepare village wise schedules for grounding of activities and submit the same to SLNA for both batches under EPA and PSI AH. • Monitor the progress every month and obtain UCs quarterly. • Start preparation of action plans under EPA for 2011-12 batch villages and submit to SLNA. • Monthly monitoring formats will be communicated shortly. • Web reports designing is in progress Progress of EPA Works – 2009-10 Sl No 1 2 3 4 5 6 7 8 9 Admin Sanctioned District Target in Rs % of in lakhs Phy (NO) Fin (Lakhs) Phy (NO) Fin (Lakhs) Progress 68.58 125.30 103.56 152.40 24.00 61.71 126.83 66.15 34.57 73.24 72.51 56.74 53.63 50.00 45.92 41.93 39.95 28.47 83.64 27.16 5 27.66 20.48 34 1436 32.82 907.22 10.11 39.92 93.64 172.80 182.52 284.18 48.00 134.40 302.45 165.60 121.44 135 253 740 858 84.77 144.42 177.13 190.56 24 92 261 775 280 33 80 157 111.17 16.33 78.89 67.14 222 13 7 3 307.92 354 161.98 11 Ranga Reddy 135.09 16 28.04 12 324.48 2272.52 64 2970 102.06 1162.48 10 Srikakulam Adilabad Chittoor Anantapur Khammam Kadapa Kurnool Nalgonda Medak Mahabub nagar Grounded Prakasam Grand Total Progress of EPA Works – 2010-11 Sl No District Target in Rs in lakhs 1 Chittoor 370.22 2 Anantapur 512.14 3 Nalgonda 260.63 4 Ranga Reddy 298.09 5 Medak 222.59 6 Adilabad 238.25 7 Kurnool 335.13 8 Kadapa 297.40 9 Srikakulam 101.34 10 Khammam 87.50 Mahabub 11 456.84 nagar 12 Prakasam 392.01 Grand Total 3572.15 Admin Sanctioned Phy Fin (NO) (Lakhs) 654 108.8 1343 231.1 0 0 55 39.78 52 13.6 16 26.97 24 13.63 348 65.25 Grounded Phy Fin (NO) (Lakhs) 134 109.38 1002 143.03 0 51.54 53 32.23 2 17.88 13 16.58 4 10.50 24 7.89 0.00 0 0.00 % of Progress 29.54 27.93 19.78 10.81 8.03 6.96 3.13 2.65 0.00 0.00 0 0 0 0 9 11.07 0 0.00 0.00 5 2506 20.25 530.4 0 1232 0.00 389.03 0.00 10.89 EPA - Focus Areas • Water treatment plants/ RO plants should be taken up in limited number as a pilot basis in the districts with minimum of 20% contribution from the community. • The sanction of EPA activities in IWMP 2009-10 & 201011 projects should be completed before 31st July 2012. It will not be allowed after 1st August 2012. • The EPA activities in IWMP 2011-12 projects shall be taken up simultaneously along with DPR preparation without waiting for finalization of DPRs by submitting the finalized micro watershed villages to SLNA. • If EPA activities are not grounded in any of the projects, the EPA amount shall be diverted into NRM component Entry Point Activity – AH EPA 2009-10 Batch: • Except Srikakulam and Prakasam districts remaining 10 districts identified activities of AH sector and released Rs 552.58 Lakhs to respective JD AH under EPA. District wise releases are given in table. EPA 2010-11 batch: • Ananthapur, Chittoor, Medak, Nalgonda and Ranga Reddy districts identified activities in Animal Husbandry sector and released Rs 283.86 Lakhs to respective JD AHs. Remaining PDs are also to release the funds immediately. Institution & Capacity Building WCC Establishment: Ananthapur and Chittoor have to get internet connectivity to newly established WCCs. Mahaboobnagar – pending procurement of computers and furniture in 2 WCCs. Ranga Reddy & Khammam districts have to submit reportmapping of WCCs for tagging on 2012-13 projects. Maintenance of registers especially cash book is not being done in most of the WCCs. Display material & Name boards have to be arranged in all the WCCs. Regular review meetings at WCCs and attendance of the field staff to WCC and field have to be seriously monitored from district level. Head Quarters stay of all field staff has to be ensured. WS Committee formation Problematic villages of IWMP-Batch I for sending proposals to SLNA for exclusion of villages/ Projects: Sno 1 2 3 4 5 Micro Watershed Name Varadayapalli Chikkepalli Ananthapur Tadipatri Peddapappur Namanakkapalli Talakondapalle Veljala Talakondapalle Amangal(WOTR) Veldanda Kuppagandla Kuppagandla Mahabubnagar Jadcherla Koilkonda Parpally Manikonda Kollapur Kodair Mailaram Nagulapalle Fathepoor Kadpal KALHER Mardi Kalher Mahadev Pally Narayankhed Masan Pally Medak Banswada Thurkawadagao Bheemra KANGTI Damaragidda [Panch) n Kangti Sadashivapet KONDAPUR Mallepally Gollapally Suryapet Thunga Thurthi Pasunur Pasnur Bandakotha Palle Nalgonda Gundala T.Shapur Valigonda Pedda Padishala Ramannapeta Kakkireni Iskilla Darsi Addanki Chinakothapalli Govada Prakasam Kanigiri Hanumanthunipadu Ummanapalli Ummanapalli District WCC Name Mandal Project Name Remarks Court Case Court Case Court Case Court Case WS Committee formation Status of formation of Watershed Committees for IWMP 2010-11 & 2011-12 2010-11 S. No District 2011-12 Total No. of WSCs to be No. of formed for WSCs 2011-12 formed WSs Total No. of WSCs to be formed for 2010-11 WSs No. of WSCs forme d No. of WSCs yet to be formed 59 56 3 62 15 1 Adilabad 2 Ananthapur 119 70 49 124 25 3 Chittoor 4 Kadapa_YSR 113 98 105 85 8 13 96 36 43 17 5 Khammam 21 21 0 6 3 6 Kurnool 7 Mahaboobnagar 8 Medak 9 Nalgonda 10 Prakasam 63 142 67 88 98 63 118 47 70 79 0 24 20 18 19 77 181 84 81 77 10 14 0 0 10 11 Ranga Reddy 67 60 7 62 10 12 Srikakulam 51 51 0 21 0 986 825 161 907 147 TOTAL Strengthening of User Groups 2009-10 S. No District 2010-11 No of UGs formed No. of UGs conducting meetings No. of UGs opened Bank A/c No. of UGs started savings No. of UGs formed 1 Adilabad 440 274 14 14 1464 2 Ananthapur 895 580 98 82 2785 3 Chittoor 4 Kadapa_YSR 626 747 526 238 162 11 162 2 2823 1026 5 Khammam 167 48 5 5 235 6 Kurnool 7 Mahaboobnagar 8 Medak 9 Nalgonda 10 Prakasam 516 558 234 230 1364 344 325 31 230 543 89 27 26 110 25 70 0 0 110 0 2374 1455 1293 1286 2458 11 Ranga Reddy 749 749 5 0 963 12 Srikakulam 341 61 17 17 542 6867 3949 589 462 18704 TOTAL •Ananthapur, Chittoor & Nalgonda are showing better performance of User groups in terms of meetings & promotion of savings. All other districts have to give serious follow up on strengthening the User Groups. Positioning of Watershed Assistants S. No. District 1 2 3 4 5 6 7 8 9 10 TOTAL Adilabad Ananthapur Chittoor Kadapa_YSR Kurnool Mahaboobnagar Medak Nalgonda Prakasam Ranga Reddy WAs for 2009-10 &2010-11 Total No. to be Positioned positioned 100 96 141 126 122 111 136 126 115 104 226 219 107 98 142 137 185 166 103 99 1377 1282 Yet to be positioned 4 15 11 10 11 7 9 5 19 4 95 •Filling up the vacancies of WSAs of IWMP batch I & II & positioning of the Watershed Assistants for IWMP batch III (2011-12) has to be immediately done by all the districts. Progress of Trainings during 2011-12 114 120 110 93 100 91 82 82 76 80 66 78 74 91 79 78 66 63 57 60 Physical Achievement 46 47 43 Fianancial Achivement 40 28 23 17 23 18 20 0 • • • • Progress of Adilabad, Kurnool, Nalgonda, Ranga Reddy & Srikakulam is below average AAPs for 2012-13 are prepared & are under admin. sanctions. Funds are to be immediately released for initiating trainings under IWMP. Ensure that all IWMP staff (GO & NGO PIAs) attend MANA TV Programmes mandatorily. Funds to Resource Organizations who have conducted trainings to Watershed Assistants have to be released immediately. Progress of Trainings during 2012-13 Annual Action Plan for 2012-13 S.No District 1 Adilabad 2 3 Anantapur 4 5 6 YSR District Kurnool Khammam Mahabubna gar Medak Nalgonda Prakasam Ranga Reddy Srikakulam TOTAL 7 8 9 10 11 12 Chittoor Estimates generation for April & May, 2012 Admin. Sanctions Progress during April & May,12 If yes, No. of Amoun No. of Amount Amount Amount No. of Received/Not trainings t spent trainings (Rs. In (Rs. In released trainings received conducte (Rs. In planned Lakhs) Lakhs) (Rs. In d lakhs) lakhs) Under 678 267.78 20 6.00 27 2.27 process 773 327.87 127 13.27 Received 1.80 59 1.80 39 2.42 671 115.75 9 2.60 Received 1.50 6 1.53 826 208.93 8 3.18 Received 1.9 608 2.41 96 31.53 Received 15.26 35 8.76 57 52.65 19 3.83 0 0 2 0.32 166 216.90 39 762 1104 160 1173 74 7052 110.77 205.66 386.00 120.00 35.00 2049.72 12 47 93 10 2 482 7.95 No NO 7.80 Received 1.82 9.79 Received 3.06 57.96 Not Received Nil 4.72 Received Not yet 0.99 Not received 0 149.62 25.33767 35 7.25 5 17 59 4 1 289 1.70 2.95 26.88 0.42 0.40 56.70 DPR Preparation – 2010-11 S.No. 1 2 3 4 5 6 7 District Anantapur Kurnool Medak Mahbubnag ar Nalgonda Prakasam Ranga Reddy No.of No. of No. of DPRs to MW Cluster be DPRs yet DPRs yet submitted to be to be in soft to prepared prepared SLNA No.of DPRs submitted in soft to SLNA No.of Telugu DPRs prepared 0 0 0 0 0 1 145 81 77 141(Tadiptri project proposed for cancelled) 81 59 18 0 2 6 0 2 166 101 117 86 88 91 107 52 48 0 0 99 99 22 0 44 26 DPR Preparation – 2011-12 Status of completion of Participatory Net Planning No.of No of No. of No.of MW No of No of No of No. of No. of farmer Projects GPs villag HHs farmers HHs to HHs farmers s PNP es SES to be be done complet complet Data data done SES ed SES ed PNP Entere Entered PNP d Status of completion of Socio Economic Survey S.No. District 1 2 3 4 5 6 Adilabad Anantapur Chittoor Kadapa Khammam Kurnool Mahabubn agar Medak Nalgonda Prakasam Ranga Reddy Srikakulam 7 8 9 10 11 12 12 29 20 9 2 22 56 92 71 21 5 36 60 101 69 18 6 24 28807 71433 38817 13433 4650 66021 20991 46750 31146 9926 3400 18336 4947 14039 25744 434 328 1546 27 56 52 77505 8820 10 13 20 45 60 40 44 62 28 16390 28377 61764 7 16 11 2 6 8 No. of No. of MWS Cluster DPRs DPR prepa prepare red d (8800) 2600 2 (3404) 1288 1513 31273 22572 11139 (8600) 2008 0 3600 400 0 49928 3418 11 0 0 0 0 0 0 0 0 0 0 0 0 954 90980 1445 0 0 0 8440 17527 25062 1712 4912 1151 34042 (0) 49996 75 0 9324 0 0 0 0 0 0 0 0 0 26910 2830 300 (0) 0 0 0 0 5400 3750 0 6580 200 0 0 0 Status of Fund release to NGO-PIAs of IWMP Batch I&II for Fin. Yr Jan,2010-March,2012: S. No 1 District Adilabad NGO-PIA Project Name Mandal & District Batch Total funds to be released under Admin, I&CB & DPR APMAS Jatharla Bazarhatnoor, Adilabad 2009-10 7.26 5.48 1.78 APMAS Ichoda Echoda, Adilabad 2010-11 11.76 3.61 8.15 CPF Knondow 2009-10 11.88 8.94 2.94 DHAN Foundation Umri 2009-10 13.25 44.15 3.38 21.41 9.87 22.74 APMAS Nallamada 2009-10 10.37 5.30 5.07 APMAS Reddypalli 2010-11 10.41 5.92 4.49 BAIF-AP Itikalapalli 2010-11 11.35 5.77 5.58 Accion Fraterna Muttala 2009-10 6.70 3.42 3.28 Accion Fraterna Bandameedipalli Raptadu, Ananthapur 2010-11 13.92 7.08 6.84 MYRADA Tavalam 2009-10 10.76 5.50 5.26 MYRADA Gorantla 2009-10 13.17 16.53 -3.36 APPS Ratnagiri 2009-10 13.5927 13.09 0.50 APPS Puttaparthi 2009-10 11.4296 11.85 -0.42 APPS Gugudu 2010-11 12.9927 14.96 -1.97 APPS Kanaganipalli Tanakal, Ananthapur Gorantla, Ananthapur Rolla, Ananthapur Puttaparthi, Ananthapur Narpala, Ananthapur Kanaganapally, Ananthapur 2010-11 7.6996 8.95 -1.25 122.39 98.37 24.02 Narnoor (M) of Adilabad Utnoor, Adilabad Total 2 Ananthapur Total Nallamada, Ananthapur Nallamada, Ananthapur Ananthapur (M), Ananthapur Atmakur (M), Ananthapur Funds released under Admin, I&CB & DPR Balance Funds to be released under Admin, I&CB & DPR Submission of UC to DWMA (Date & Amount) 26/03/12 Rs.1.86 26/03/12 Rs.2.36 31.01.12, Rs.3.08 lakhs 19.03.2012 4.75 Date 15.09.11 5.84 Date 15.09.11 3.40 (30-092011) Nov, 2011, 2.25 lakhs Nov, 2011, 3.6 lakhs 30/9/2011 of Rs 6.48 Status of Fund release to NGO-PIAs of IWMP Batch I&II for Fin. Yr Jan,2010-March,2012: S. No 3 District Chittoor NGO-PIA Project Name FES Musalikunta FES Tettu FES Thamballapalli DHAN Foundation DHAN Foundation M C Palle Chandramakulapall OUTREACH Katiperi OUTREACH Cherlopalle Mandal & District Peddamndyam, Chittoor Kurabalakota Tambalapally, Chittoor Batch 2009-10 8.08 3.52 4.56 2.74 2010-11 10.08 1.50 8.58 1.50 2010-11 11.16 5.67 5.49 4.59 Punganur, Chittoor 2009-10 11.63 5.94 5.69 19.03.2012 2010-11 10.74 5.46 5.28 2009-10 5.54 9.87 -4.33 2009-10 6.54 11.39 -4.85 2010-11 63.77 12.48 43.34 6.35 20.43 6.13 LakkiReddypalli, YSR 2010-11 12.12 6.16 5.96 24.60 12.51 12.09 Punganur (M), Chittoor Chowdepalli, Chittoor Gurramkonda, Chittoor Total 4 YSR -Kadapa MYRADA Nooliveedu MYRADA Kurnoothala Galiveedu, YSR Total 5 Kurnool Total Total funds to Funds be released Balance Funds Submission of released under to be released UC to DWMA under Admin, under Admin, (Date & Admin, I&CB & I&CB & DPR Amount) I&CB & DPR DPR 3,55,760.00; 19.03.2012 30.09.11/ 7,20,050/30.09.11/ 7,34,665/31/12/2011 of Rs 11.62 MYRADA Chennampalli Tuggali, Kurnool 2009-10 13.50 10.19 3.31 31/12/2011 of Rs 6.90 WOTR Indireswaram Atmakur, Kurnool 2009-10 14.16 2.32 11.84 Not prepared WOTR Tangadancha Jupadu Bunglow, Kurnool 2009-10 13.61 2.24 11.37 Not prepared 41.27 14.75 26.52 Status of Fund release to NGO-PIAs of IWMP Batch I&II for Fin. Yr Jan,2010-March,2012: S. No 6 District NGO-PIA Project Name BAIF-AP Bhoothpur BAIF-AP Kankurthy WOTR Kuppagandla WOTR Veljal Mahaboobnagar Mandal & District Bhoothpur (M), Mahaboobnagar Damaragidda, Mahabbobnagar Veldana, Mahaboobnagar Talakondapally, Mahaboobnagar Batch 7 Nalgonda Surveil Utukur 12.05 6.13 5.92 2009-10 9.53 4.87 4.66 2009-10 9.90 6.04 3.86 2009-10 10.30 6.81 3.49 41.78 23.85 17.93 7.93 4.04 3.89 08.03.2012 13.42 6.83 6.59 08.03.2012 21.35 10.87 10.48 2010-11 13.36 10.82 2.54 12.83 2010-11 13.72 11.12 2.60 13.37 2009-10 10.70 2.73 7.97 2010-11 11.93 6.06 5.87 49.71 409.03 30.73 255.83 Narayanpur, Nalgonda 2009-10 Shaligouraram (M), Nalgonda 2010-11 Total WASSAN WASSAN 8 Ranga Reddy BAIF-AP BAIF-AP Total GRAND TOTAL Parigi (M), Ranga Narayanapur Reddy Doma (M), Ranga Mothukur Reddy Gandid, Ranga Mukarlabad Reddy Basheerbad (M), Manthatti Ranga Reddy 2.41 (30-092011) 3.04 (30-092011) 21st Dec.2012 Rs.2.83 21st.Dec.2012 Rs. 2.96 2010-11 Total DHAN Foundation DHAN Foundation Total funds to Funds be released Balance Funds Submission of released under to be released UC to DWMA under Admin, under Admin, (Date & Admin, I&CB & I&CB & DPR Amount) I&CB & DPR DPR 18.98 153.20 3.94 (30-092011) 3.59 (30-092011) IWMP 2012 -13 Projects identification, delineation on integrated mandal base map & subsequent PPRs Preparation Status by District wise as on 11-05-2012 Field re-conformation of the proposed project area by utilizing the A3 size index maps prepared by SLNA. Obtaining the SLNA PPRs data. Completion of PPRs in all respects as per DoLR proforma. Thank You