CDM based CFL programme
NARAYANAN.A.M.
Head-Energy Efficiency Division
Energy Management Centre -Kerala
energy management centre – kerala
www.keralaenergy.gov.in
1
..
..
Annual Energy Consumption:
Petroleum Fuel~ 6 MT
Electricity ~ 12 BU; ~ 2900MW (Peak)
90
80
70
60
50
40
Consumers
Consumption
30
Revenue
20
10
0
energy management centre – kerala2
www.keralaenergy.gov.in
Load Curve
energy management centre – kerala
www.keralaenergy.gov.in
3
energy management centre - kerala
Reasons for CFLs
Poor monsoon – Low Water Level in HEP
Daily Consumption to 54.9 MU from 49 MU
MD to 3200 MW from 2850 MW
Power availability from Central pool?
Power intensive life style of Domestic Consumers
Exercise equipments , Kitchen Appliances, Water
[AC,
heaters
etc.]
Most cost effective programme
energy management centre – kerala
www.keralaenergy.gov.in
4
Preliminary work
KSEB invited bid for CDM based CFL programme “BLY” in
Nov. 2009
three firms shortlisted, none shown keen interest in
implementing the project.
KSEB cancelled the bid and discussed with BEE to
overcome the situation.
As per this discussion, EMC came into picture and
registered as an investor in the BLY programme.
energy management centre – kerala
www.keralaenergy.gov.in
5
Cost
Government accorded AS (Administrative Sanction) to
EMC for implementing the BLY programme.
Tenders were finalized and EMC issued supply orders
to M/s Philips on 01st Feb 2010.
Total Project Cost
:Rs.95.00 Cr.
Loan from Govt.
:Rs. 40.00 Cr.
Loan from KSEB
:Rs.51.50 Cr.(@13.5% interest)
Total CFLs purchased :1,44,17,466 Nos.
energy management centre – kerala
www.keralaenergy.gov.in
6
Specification
Applicable Standard : IS:15111 (Part-1 & 2)-2002
Wattage : 14 Watt.
Rated Voltage : 230 V
Frequency :50 Hz
Power Factor :>0.85
Lamp Cap : Bayonet cap type
Burning hours :Minimum 6000 hours
Colour :‘Cool Daylight’
Luminous Flux :>760 Lumen ( >55 Lumen per Watt)
Colour temperature :6500K
Harmonics: 3rd <2.4 mA, 5th <1.9mA, 7th <1
energy management centre – kerala
www.keralaenergy.gov.in
7
Inauguration
The Programme inaugurated on 15th March 2010 by
the Hon’ble Chief Minister of Kerala by giving two
14 W CFLs to Hon’ble Opposition Leader.
energy management centre – kerala
www.keralaenergy.gov.in
8
Distribution
Programme Started from the southern to Northern side
Formed Committees in Grama Panchayath level for smooth
implementation
good Media coverage
date and venue CFL distribution centers widely published
The programme closed
South:
Central :
North:
15th July 2010
31st July 2010
30th Aug 2010
energy management centre – kerala
www.keralaenergy.gov.in
9
Implementation
Area and no of
Project Circle
CFL distributed
% coverage
South [6]
35,28,478
82.56%
Central [ 7]
40,71,566
79.55%
North/ [10]
50,13,976
83.19%
Total [23]
1,26,14,020
81.81%
energy management centre – kerala
www.keralaenergy.gov.in
10
Guidelines for CFL distribution
A Ex. E in sub Regional Store of Circle Office receives the CFLs
Testing of samples
Verification of Bills and forward to EMC
Issue of CFLs to various KSEB offices based on the domestic
consumer strength
In the Section Office, AE to maintain a separate register
Give mass publicity through News papers regarding supply of
CFLs
energy management centre – kerala
www.keralaenergy.gov.in
11
Guidelines for CFL distribution
AE to decide on distribution Centers in consultation
with Panchayath, People Representatives, Resident’s
Association/NGO’s etc.
to record distribution of CFLs, recorded in format
containing :
“ Consumer No, name, date of last bill, details of amount
received, Agreement, signature”
A master register of section is made available for any
verification
energy management centre – kerala
www.keralaenergy.gov.in
12
Guidelines for CFL distribution
At distribution center, more than one set of counters, each
with 4 sub-counters, viz.,
First sub-counter: testing the Incandescent Lamp(ICL)
Second sub-counter: indentifying the consumer and affixing
signature (agreement)
Third sub-counter: collecting Rs. 30/- and issuing of receipt
Fourth sub-counter: issue of CFL after testing and affixing seal
(Two CFL issued) in the last bill and issue of notice for making
aware of the benefits in savings and to avoid mercury pollution
energy management centre – kerala
www.keralaenergy.gov.in
13
Guidelines for CFL distribution
ICLs collected: numbered, packed
and transferred to storage space.
energy management centre – kerala
www.keralaenergy.gov.in
14
• All Costs including Purchase,
Distribution and Transaction Cost fully
met by EMC-Kerala
energy management centre – kerala
www.keralaenergy.gov.in
15
Guidelines for CFL distribution
•Arrangements were made to replace the
faulty CFLs from the KSEB offices.
•Second Saturdays are dedicated for
distribution of faulty CFLs during the
warrantee period.
energy management centre – kerala
www.keralaenergy.gov.in
16
CPA (CDM Programme Activity)
Verification of Registration in Progress
energy management centre – kerala
www.keralaenergy.gov.in
17
[email protected]
18