4 Framework RTD Programme TORCH Technical, Economical and

Download Report

Transcript 4 Framework RTD Programme TORCH Technical, Economical and

New Technologies
and
Airport Management
Presented by
Università di Piacenza
Cesare Bernabei
&
Politecnico di Milano
22-23 January 2004
Brussels December 5,2002
1
The Air Transport System
Is growing steadily since the last ten years
and it is expected to do so
Despite the 9/11 event
for the next twenty years
Brussels December 5,2002
2
Traffic Density
7.0 Mio Flights
1997
8.0 Mio Flights
2010
11.9 Mio Flights
2000
2020
15.8 Mio Flights
DIVISION DED 4 - 4/11/97
Brussels December 5,2002
3
The Single Sky Initiative
Through its Regulations on
Organisation and Use of the Airspace
Provision of Air Navigation Services
Interoperability of the European Air Traffic
Management Network
will provide the new frame for the
European Airspace
Brussels December 5,2002
4
Although
airports are not directly
part of the Single
European Sky
initiative….
Brussels December 5,2002
5
So….
What can Technology do in order
to reduce the risk that airports
become the bottleneck of the civil
aviation system?
Brussels December 5,2002
6
RESEARCH AREAS
Approach and Landing Operations
Advanced Surface Movement
Guidance and Control System
or A-SMGCS
Airports Air-side and Land-side
Optimisation
Brussels December 5,2002
7
Let’s take a mid-size airport
Brussels December 5,2002
8
Prague
Ruzyne
Airport
Brussels December 5,2002
9
Is the flight ended
when
the aircraft has landed?
Brussels December 5,2002
10
Final Phases of Flight
Gate / Stand
Apron entrance report
(from Surveillance)
Landing report
(from Surveillance)
Runway safety area
Taxi
clearance
Final Approach report
(from Surveillance)
Aircraft sequenced
(from Arrival Manager)
30 minutes
before touch down
11
Brussels December 5,2002
Apron
Twy
Rwy
Final Approach
Exit
proposal
Landing
clearance
Apron
controller
Ground
controller
Tower controller
Approach controller
ACC
Control
Towers
Brussels December 5,2002
12
From the Control Tower
On a bright day
Brussels December 5,2002
13
From the Control Tower
On a foggy day
Brussels December 5,2002
14
What the controller
do in such conditions?
Picks up the R/T and
call the aircraft
However, now the
technology can assist
him/her in the job
Brussels December 5,2002
15
Research & Development Activities at
DG-TREN
Since 1994, the Directorate for Transport
has supported R&D Activities in the field of
A-SMGCS or
Advanced Surface Movement Guidance and
Control Systems
Brussels December 5,2002
16
The Ground Controller
Day,
night, in
fog
or...
Brussels December 5,2002
17
The requirements
“An Advanced Surface Movement Guidance and Control
System (A-SMGCS) is expected to provide adequate
capacity and safety in relation to the specific weather
conditions, traffic density and aerodrome layout by use
of modern technologies and a high level of integration
between the various functionality.”1
1: ICAO - Draft MANUAL OF A-SMGCS, 2001
Brussels December 5,2002
18
The A-SMGCS Environment
Aircraft
Obstacles
Vehicles
Ground
Controller
A-SMGCS
Surveillance
Control
Routing/
Guidance
Planning
External Systems
ATC Systems
Airport Systems
Airline Systems
Brussels December 5,2002
19
Demonstrator’s Functional Architecture
Traffic Objects
Flight plans
ARAMIS
Pilot HMI
Pilot
DAFUSA
DA VINCI
AIRPORT-G
Other planning
Sensors
Guidance means
DAFUSA
Planning/routing
Surveillance
MANTEA
AIRPORT-G
MANTEA
Monitoring/Control
Guidance
MANTEA
ATHOS
Controller HMI
Controller
Brussels
December 5,2002
20
Surveillance
An adequate set of Sensors
provides the controller with a complete
knowledge of all movements including
identification of any object
Brussels December 5,2002
21
Controller
Working
Position
Surveillance Display
Brussels December 5,2002
22
Control
Provides the controller with an alert in
case of events like
• crossing runways
• restricted areas incursion
• separation criteria infringement
Brussels December 5,2002
23
Control
Runway
Incursion
Alert
Brussels December 5,2002
24
Guidance
On-board guidance tested through:
•Guidance aid response time
•clearance from CWP displayed at the onboard HMI
•taxi route given by CWP displayed at the onboard HMI
External guidance tested through:
•External panels
Brussels December 5,2002
25
On-board Guidance
External Guidance
Brussels December 5,2002
26
Planning
• Electronic Flight Strips
• Routing
• Co-ordination Arrival / Ground Movement /
Departure
Brussels December 5,2002
27
The A-SMGCS Concept has been
proven and tested within the
•DEFAMM project in the 4th FP
•BETA project in the 5th FP
Brussels December 5,2002
28
DEFAMM Project
Demonstrated the validity of the A-SMGCS Concept
testing various equipment at the airports of
•Köln/ Bonn
•Orly Paris
•Braunschweig
•Bergamo
Brussels December 5,2002
29
BETA Project
in the 5th Framework Programme
Tested three configurations at the airports of
•Prague
•Hamburg
•Braunschweig
Brussels December 5,2002
30
Non Co-operative Sensors
Guidance
Function
Planning
Function
Surveillance and Alerting
Functions
SMR
NRN
Surveillance Data
Server
Surface Movement
Planning System
Alert
Process
GDPS
Datalink
GP&C
TRP
Co-operative Sensors
MODE-S /
ADS-B
Guidance
Systems
Fusion
Process
AGL
AMS
D-MAN
DGPS
GP&C
ASR
E2000
The BETA system at Prague
Local Area Network
Airport/ATM
Information Systems
FDPS
ESUP
MET
IDP
Reference
Clock
Technical
Control and
Monitoring
System
Recording
and
Playback
System
System Management
Brussels December 5,2002
Tower
Controller
Working
Position
Ground
Controller
Working
Position
Apron
Controller
Working
Position
Controller HMI
31
Results from the Research Activities
The implementation of these systems on real
airports has permitted to assess
Objective data:
Surveillance parameters (e.g. position accuracy, report
update, report latency, probability of false detection,
coverage area)
System functionality (e.g. warnings, hand-over
procedures, electronic flight strips)
Subjective data:
Use of the system (e.g. warnings, hand-over
procedures, electronic flight strips)
Workload of controller
Brussels December 5,2002
32
Surveillance Results at Prague Airport
Item
Parameter Name
Expected
Measured
Value
Value
PR
Horizontal Position Resolution
1m
HR
Height Resolution
 2 m (6.56 ft)
VR
Velocity Resolution
Speed
Direction
 1 m/s
 10
1 m*
6.25 ft*
0.25 m/s*
10*
TR
Time Resolution
 0.01 s
0.01 s*
RPA
Reported Position Accuracy
 7.5 m
<8m
RVA
Reported Velocity Accuracy
 5 m/s
NA
 100
NA
Speed
Direction
TRUR
Target Report Update Rate
1s
1s
TRL
Target Report Latency
Unspecified
NA
Overall results of objective indicator measurements for surveillance in Prague.
In the table above, symbols have the following meanings:
*
Obtainable resolution limited by ASTERIX data format
NA Not Analysed, insufficient suitable data available or problems aligning data
reports with time
Brussels December 5,2002
33
In Conclusion
How all this can support Policy?
What has been done? and
What can be done?
Brussels December 5,2002
34
Research support to Policy
These results have already been used to fill the ICAO ASMGCS European Manual
It provides a common baseline for Airport Authorities as
well as producers for the procurement of appropriate
system for any airport
Through this yardstick, it is possible to compare the
actual capacity at an airport as well as to assess the
implemented level of safety
Brussels December 5,2002
35
Further more...
Assessment of actual capacity, makes it possible to
evaluate future expansions and their impact on the
environment
Precise allocation of responsibilities, permit to assess
causes of an accident or of delays
Realistic slot allocation can be implemented
Ultimately a better Quality of Service
can be offered to passengers
Brussels December 5,2002
36
The ICAO A-SMGCS Manual
•has been circulated to States
•the 11th ICAO Air Navigation
Conference, held in Montreal, has
recommended its use
Brussels December 5,2002
37
Any
Question
?
Brussels December 5,2002
38