NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO 2017-18 For The Quarter Ending Dec.2012 PLANNING POWER January, 2013 NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP 1 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects Where Financing Has Been Lined Up Sr. No. Name of the Projects 1- *Replacement of depleted material at existing grid stations of NTDC system Replacement of obsolete/depleted equipment at 24 No. 500 & 220 kV grid stations. Extension of 1x250 MVA T/F 2- Extension/Augmentation of 500/220kV Rewat substation 3- 2nd Source of supply to 220 kV GIS Islamabad University. In/out of 220 kV MansheraSangjani S/C at Islamabad University (40 km) Scope of work Augmentation of 2x160 MVA 220/132kV T/F to 2x250MVA T/F Estimated Cost 1US$=98PKR (MRS) MUS ($) 1897 20 220 kV Mirpur Khas In/Out of 220kV Hala RoadT.M.Khan Road D/C T/L at Mirpur Khas New (70km) ADB Tranche- III Proposed in ADB Tranche- III Expected Completion 2014-15 940 9 1274 13 Proposed in ADB Tranche- IV 2015-16 5000 51 Proposed in ADB Tranche- IV 2015-16 220kV sub station with 2x250 MVA T/Fs and allied equipment 4- Financing 2014-15 *PC-I was submitted to BOD NTDC on 26-12-12 for approval PLANNING POWER 2 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects Where Financing Has Been Lined Up Sr. No. Name of the Projects Scope of work Estimated Cost 1US$=98PKR Financing Expected Completion (MRS) MUS ($) 300 3 Proposed in ADB Tranche- IV 2015-16 3423 35 Proposed in ADB Tranche- IV 2015-16 2955 30 Proposed in ADB Tranche- IV 2015-16 980 10 Proposed in ADB Tranche- IV 2015-16 nd 5- 2 Source of supply to 220 kV Hala Road Grid Station 220 kV D/C T/L from T.M Khan Road to Hala Road (10 km) 220 kV sub station with 2x250 MVA T/Fs and allied equipment. 6- 220 kV Gharo 7- 220 kV Jhimpir 8- Replacement of old lines for 220 kV Burhan 220 kV D/C T/L from Jhimpir to Gharo (70km) 220kV substation with 2x250 MVA T/Fs and allied equipment 220kV D/C T/L from Jhimpir to T.M Khan Road (60 km) 220 kV D/C T/L from Tarbela to Burhan on Rail conductor (35 km) PLANNING POWER 3 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects Where Financing Has Been Lined Up Sr. No. Name of the Projects 9- Reconductoring of 220kV Tarbela-ISPR Transmission Line Scope of work Reconductoring of 220 kV TarbelaISPR D/C T/L on Rail conductor (62.5 km) Estimated Cost 1US$=98PKR 11- 220 kV Chakwal MUS ($) 1372 14 Proposed in ADB Tranche- IV 2015-16 3332 34 Proposed in ADB Tranche- IV 2016-17 4704 48 Proposed in ADB Tranche- IV 2016-17 In/out of 220 kV Mangla-Rewat S/C at Chakwal (60 km) 220 kV Mastung 220kV sub station with 2x250MVA T/Fs and allied equipment Expected Completion (MRS) 220kV sub station with 2x160MVA T/Fs and allied equipment 10- Financing 220kV D/C T/L from Mastung to Sibbi (120 km) PLANNING POWER 4 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects Where Financing Has Been Lined Up Sr. No. Name of the Projects Estimated Cost 1US$=98PKR Scope of work (MRS) MUS ($) 3724 38 29901 305 220kV sub station with 2x250MVA T/Fs and allied equipment 12- 220 kV Chakdara In/Out of 220kV Shahi BaghMardan S/C at Chakdara (85km) Total PLANNING POWER Financing Expected Completion Proposed in ADB Tranche- IV 2016-17 5 NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED 6 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. 1- Name Of New Substations 220kV GIS Shadman T/F Cap. (MVA) 2x250 2x750 Associated Transmission Lines 220 kV D/C cable from Shadman to Bund Road (30km) Estimated Cost 1US$=98PKR Expected Completion (MRS) MUS ($) 4900 50 2015-16 12401 127 2016-17 In/Out of 500 kV Tarbela – Rewat S/C at Islamabad West (40+40km) In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad West (50+50 km) 2- 500 kV Islamabad West In/Out of 220 kV Burhan–ISPR S/C at Islamabad West (15km) 2x250 In/Out of 220 kV Mansehra/Islamabad University– ISPR D/C at Islamabad West (10km) PLANNING POWER 7 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. Name Of New Substations T/F Cap. (MVA) 2x750 3- 500 kV Faisalabad West 2x250 Associated Transmission Lines Estimated Cost 1US$=98PKR Expected Completion (MRS) MUS ($) 12156 124 2015-16 4000 41 2016-17 500kV D/C T/L for In/Out of 500 kV M.Garh – Gatti S/C at Faisalabad West (2km) 500kV D/C T/L for In/Out of 500 kV Multan-Gatti S/C at Faisalabad West (45 km) 220kV D/C T/L from Faisalabad West to T.T.Singh (70km) 220kV D/C T/L from Faisalabad West to Lalian New (80km) 4- 220 kV M-3 Industrial Estate Faisalabad 220 kV M3 Industrial Estate– Faisalabad New (70 km) 2x250 In/Out of 220 kV Faisalabad West-M3 Industrial Estate at 220 kV Chinot Industrial (30 km) PLANNING POWER 8 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. 5- 6- 7- Name Of New Substations 220 kV Jamrud 500 kV Peshawar New 220 kV Kohat T/F Cap. (MVA) 2x250 2x750 2x250 Associated Transmission Lines 220 kV D/C T/L from Peshawar to Jamrud (10 km) In/out of 500kV Tarbela – Peshawar at Peshawar New (2+2km) In/Out of 220kV PeshawarShahibagh S/C at Peshawar New (5km) 220 kV D/C T/L from Kohat to Peshawar New (50 km) 220 kV D/C T/L from Kohat to Bannu (150 km) Total PLANNING POWER Estimated Cost 1US$=98PKR Expected Commissioning (MRS) MUS ($) 1600 16 2017-18 4300 44 2017-18 6580 67 2017-18 45937 469 9 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Report Prepared by: Designation Maqsood Ahmad Qureshi Additional Manager Projects Planning 0347-4447720 042-99202609 Dy. Manager Projects Planning 042- 99202609 Fahmeeda Shafi PLANNING POWER Contact No. 10