PCI Introductions - Power Costs, Inc.

Download Report

Transcript PCI Introductions - Power Costs, Inc.

Analyze Optimize Enterprise

Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission

PCI Outage-Management & GADS Modules

August 11, 2011

Power Costs, Inc. Confidential and Proprietary 2010

PCI GSMS Bid-to-Bill Solution for SPP Market

   

PCI GenManager

    

Bid Formulator Bid Evaluator LMP Manager ISO Communication Wind Module Pre-Settlement Shadow Settlement Settlement Allocation P&L Analyzer

 

PCI GenPortal & GenBase

Datamart

Deal Capture Gas Management Outage Management & GADS PCI GenTrader

Unit Commitment www.PowerCosts.com

Page 1

Who currently Uses PCI Software Solutions?

PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.

ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%)

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Who currently Uses PCI Software Solutions?

PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.

ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%) Customer American Electric Power City Public Service – San Antonio NV Energy PCI GT X X X Consumers Energy CDWR Alliant Energy Ameren Energy (UE & AEM) Dominion Kansas City Power & Light Empire District Florida Power & Light Madison Gas & Electric X X X X Calpine Energy Topaz Power Lower Colorado River Authority City of Ames Southern California Edison Oklahoma Gas & Electric X X X X X

Power Costs, Inc. Confidential and Proprietary 2010

PCI GP X X X X X X X X X X X X X X X X X PCI GM ERCOT CAISO MISO CAISO MISO MISO PJM SPP SPP MISO ERCOT ERCOT ERCOT MISO CAISO SPP Customer Duke Energy Direct Energy Xcel Energy Optim Energy Sempra Energy Pacific Gas & Electric NRG (Texas) Bryan Texas Utilities GDF Suez North America MidAmerican Energy Progress Energy Westar Energy Orlando Utilities Commission NIPSCO FirstEnergy San Diego Gas & Electric GenOn www.PowerCosts.com

X X X X X X X X X X X X X X PCI GT X X X PCI GP X X

X X

X X X X

X X X

X X PCI GM MISO SPP ERCOT

CAISO

CAISO ERCOT MISO PA SPP MISO PJM CAISO

Objectives for PCI Outage-Management Module

Automate workflow to:

Capture all Plant Outage information required by ISO

Submit outage & deratings to the new SPP Outage Scheduler system

Manage all Communications and approval process with ISO schedulers

Manage Communications and approval process with Plant Managers

Submit outage data to NERC GADS and produce plant performance reports

Use outage & derating data to formulate DA & RT offers and forecast DA awards for generators

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 4 1/1/2007

SPP Outage Management

SPP is replacing their “OPS1” Outage Scheduler Solution

SPP Go-Live is 9/13 using SPP Web page.

API becomes available on 9/20.

Option to keep existing business process or migrate to direct submit by Generators.

SPP Outage Scheduler will be integrated into Current Market now and pushed over to future market.

 

PCI Outage Management can implement with SPP API so clients can manage outages from PCI instead of from SPP Web page.

PCI Outage Management functionality can be delivered for use with new SPP Outage Scheduler.

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 5 1/1/2007

Major changes from OPS1

Important Differences between OPS1 and CROW

 No longer limited to submission at a Balancing Authority level, may submit at the GOC level.

 SPP’s CROW will use complete names. PCI automatically translates from your in house names to the SPP names.

 Generation derates will be handled differently from what is currently in OPS1. Generation derates reflect the unit’s Net Available Capacity.

– Ex: 100 MW unit is derated to 75 MW. Unit is available to produce 75 MW. (In OPS2 you would enter a 25 MW curtailment.) 

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 6 1/1/2007

Capabilities of PCI Outage-Management Module

 

Enter, edit, and submit outage requests:

Planned (>= 48 hours Lead Time)

Urgent (>= 24 hours to 7 days Lead Time)

Emergency (<= 24 hours Lead Time)

Forced (<= 1 hours Lead Time) Manage 3-way communication between plant managers, portfolio managers, and ISO operators:

Submit requests internally for approval and manage approval process

Submit outage requests to ISO Outage Schedule for ISO approval

– – –

Track ISO approvals Manage pending requests Track submissions and alarms

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 7

Main Outage-Management Screen

  

Provide Web-Based GUI to enter & update outages Provide XML data links to communicate with ISO Provide filters & validation rules to speed up and automate outage management workflow

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 8 1/1/2007

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

  

Sections divide up read-only, required, and optional fields Access to historic reviews Create recurring outages on new Page 9

Sample Workflow Process

Power Costs, Inc. Confidential and Proprietary 2010

Single, coordinated stream of data.

www.PowerCosts.com

Provide Gantt Chart to Easily Track Ouatges

  

View outages using a Gant chart.

Filter units and types of outage.

Select / Edit outage details.

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 11 1/1/2007

Using PCI Outage-Management Module to Automate NERC GADS Reporting

Capture all outage & derating data required to support NERC GADS reporting:

Assign unique GADS Id for each outage

Provide combo box to allow user to select GADS cause code

Allow user to specify unit code and utility code required for NERC reporting

Assign a 2-character event type to describe outage

Specify an equipment type associated with outage event

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 12

Using PCI Outage-Management Module to Create GADS Performance Reports

     

Capture EMS Breaker Status. Can automatically Generate Outage Tickets based on the breaker status Compute GADS Performance Statistics Generate GADS Performance Reports by Plant/Unit Generate NERC compliant files Option to ETL GADS Data to PCI Data Warehouse for BI Reporting

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 13

Business Intelligence / Data Warehouse Analytics

Example 1

– –

GADS Reporting Event Reporting and Analysis

Example 2

– –

“In the Money” Analysis Compare GADS Performance Records to Performance History in the ISO

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 14

Sample PCI Report to Summarize Turbine Service Hours

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 15

PCI Outage Manager is fully integrated with other PCI Modules

Outages can be entered in the PCI Outage-Management Module. After outage is approved:

PCI Bid Formulator can automatically adjust offer parameters to reflect the current outage status

PCI Bid Evaluator can be run to Forecast DA Awards

PCI GenTrader can use outage information for unit commitment and production costing runs

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Fully Integrated with PCI GSMS Modules

Page 16

Summary of PCI Extended Outage-Management Module

Manage outage lifecycle:

– – –

Submit new outage requests Update existing requests Download status of existing outages

Fully integrated with:

– –

ISO Outage Scheduler Other PCI GSMS modules (GenTrader, Bid Evaluator, Bid Formulator)

Automate NERC GADS Reports

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com

Page 17

For More Information

Ali Merchant 630-770-1055 [email protected]

Bryan Kelly 916-799-2006 [email protected]

Stuart Wright 303-940-1444 [email protected]

Jason Hebert 713-231-7454 [email protected]

  

PCI GENERATION SUPPLY MANAGEMENT SYSTEM™ Operations & Trading

Optimal unit commitment and economic dispatch

– –

Fuel scheduling Ancillary services optimization Post Analysis

P&L Analyzer

Bid-To-Bill Automation

Forecast LMPs

Automate XML Communications with ISO

– –

Create Unit & Demand Bids Evaluate Bidding Strategies

– –

Perform Shadow Settlement Manage Outages & Deratings Gas Management

Forecast Gas Burn

Optimize Pipeline Uses

Nominate Gas & Pipeline Volumes

Transaction Management

Deal Capture

– –

Create MISO Financial Contracts Settlement of Bilateral Transactions

Power Costs, Inc. Confidential and Proprietary 2010

www.PowerCosts.com