CHANGES THAT AFFECT US
Traffic Changes in the Mine
File No: LU001
Date Issued: 21st December 2012
Before
Description:
• Road changes are currently being undertaken
at PODs/Luce Basin short cut intersection
affecting traffic flows.
•The changes include widening of the
intersection, and installation of a dividing berm
in the middle of the road for the addition of a
third cable standard
Reason for Change:
•This area is congested with cables crossing the
road from the sub 23 area.
•The cable standard set up “squeezed” the road
creating a hazard for hauling traffic
Justification:
•Provide loaded haul traffic with a wider running
surface to ensure empty traffic from PODs/Luce
East is not forced to stop
Please proceed with caution in this area