Transcript Document
Presentation at the Vicksburg District SAME/Little Rock/Tulsa U.S. Army COE Future Work & Partnering Symposium by Shirley H. Reed Deputy for Small Business Vicksburg District Corps of Engineers April 27-29, 2009 Vicksburg District VICKSBURG DISTRICT Civil Works Construction Advertising Schedule 1 May 2009 to 30 September 2009 Vicksburg District Civil Works Divisions & Districts Alaska Seattle Portland Great Lakes & Ohio River Walla Walla North Atlantic New England Northwestern St. Paul Buffalo Detroit New York Rock Island Omaha Chicago Sacramento San Francisco Cincinnati South Pacific Kansas City Tulsa Los Angeles Albuquerque St. Louis Little Rock Norfolk Louisville Wilmington Nashville Memphis Charleston Atlanta Vicksburg - Savannah Ft. Worth Mobile Jacksonville Dallas Galveston New Orleans Mississippi Valley LEGEND: LEGEND: Division HQ location Division HQ location District DistrictHQ HQlocation location Division boundary Division boundary District Districtboundary boundary State Stateboundary boundary Hunting ton Southwestern Honolulu Pacific Ocean Division Pittsburgh Philadelphia Baltmore South Atlantic Vicksburg District 41% of U.S. Flows ThroughBasin the Mississippi River Drainage “Body of the Nation” Platte Ohio Arkansas Canadian Red 4 Vicksburg District The Vicksburg District Vicksburg District Major Missions Vicksburg District Vicksburg District by the Numbers • • • • • • • • • • • • • • • 68,000 square miles 300 miles of Mississippi River 8 ports 12 locks with 9 dams 10 flood control reservoirs 3 hydraulic power generation plants 478 flood control structure 10 flood control reservoirs 21 pumping plants 1,960 miles of levees 1,252 miles of navigable channel 1,709 miles of shoreline 135 recreation areas 3,215 camp sites 2,028 picnic sites Vicksburg District FY 09 Small Business Accomplishments Program Execution (as of April 2009) (as of APR 2009) Target Small Business Small Disadvantaged Business HUBZone Small Business Woman-Owned Small Business Service-Disabled Veteran Owned HBCU/MI 32.0 18.0 10.0 5.8 3.0 13.4 Accomp. 50.9 8.1 36.9 6.6 3.5 0.0 Vicksburg District Vicksburg District Projects for FY 2009 Project and Item Description of Work Advertising Date * Estimated Value Channel Improvement FY 09 Stone Repairs Riprap - Various Locations May 09 $500K - $1.0M Item 468-L Levee Enlargement and Berm Aug 09 Over $10.0M River Museum and Interpretive Center Exhibit Building Sep 09 Over $10.0M Mississippi River Levees * Schedules may change based on availability of funding and other factors. Vicksburg District Vicksburg District Projects for FY 2009 Project and Item Description of Work Advertising Date * Estimated Value Mississippi Delta Headwaters Project RP-05-03, Hickahala Creek Riser Pipe Apr 09 $500K - $1.0M RP-04-04, Yalobusha River RP-05-02, Yalobusha River RP-05-03, Hickahala Creek BS-05-01, Black Creek Riser Pipe Riser Pipe Riser Pipe Bank Stabilization Apr 09 Apr 09 Apr 09 Apr 09 $500K - $1.0M $500K - $1.0M $500K - $1.0M $100K - $500K Low Drop Grade Control Structure Apr 09 BS-05-03, Yalobusha River Bank Stabilization Apr 09 RP-04-05, Hichahala/Senatobia Creek Riser Pipe May 09 LD-04-05, Hickahala/Senatobia Creek Low Drop Grade Control Structure Jun 09 Riser Pipe RP-04-03, Yalobusha River Jun 09 CI-03-01, Toby Tubby Channel Improvement Jul 09 BC-04-01, Hickahala/Senatobia Creek Box Culvert Jul 09 $500K - $1.0M LD-04-02, Yalobusha River * Schedules may change based on availability of funding and other factors. $1.0M - $5.0M $500K - $1.0M $500K - $1.0M $500K - $1.0M $5.0M - $10.0M $500K - $1.0M Vicksburg District Vicksburg District Projects for FY 2009 Project and Item Advertising Date * Estimated Value Revetment May 09 $1.0M - $5.0M Gravel Surfacing May 09 $1.0M - $5.0M Description of Work J. Bennett Johnston Waterway Lake St. Agnes Red River Below Denison Dam Roads on Levee Crown Phase III * Schedules may change based on availability of funding and other factors. Vicksburg District Vicksburg District Projects for FY 2009 Project and Item Description of Work Advertising Date * Estimated Value May 09 $1.0M - $5.0M Red River Emergency Bois D'Arc Revetment Phase III Revetment Ouachita River Levees Monroe to Sandy Bayou Phase III Gravel Surfacing May 09 $500,000 to $1.0M DeGray Lake Oil Containment Jun 09 $100K - $500K Sardis Lake Field Office Building Jun 09 $1.0M - $5.0M Operation and Maintenance * Schedules may change based on availability of funding and other factors. Vicksburg District Search for contracting opportunities with the Vicksburg District at: http://www.mvk.usace.army.mil/offices/contract/ 7261