Transcript Document

Electricity Conservation & Demand
Management Programs
& Low-income Customers
Role of the Ontario Energy Board
by
Zora Crnojacki, OEB Staff
LIEN Annual Conference, Peterborough
May 26, 2006
OEB Electricity CDM Initiatives to date
May 26, 2006
• 2005 CDM Plans Approved
• Board required Quarterly Reporting
• Board required Annual Reporting
• 2006 Electricity Distribution Rates-Board
approved additional CDM spending (where
applied for)
• Review of 2005 Annual Plans (in progress)
2
CDM 2005 Initiative
• 2005 CDM applications approved:
Final Orders Issued
77
Budget-Approved Plans
$163 million
To be spent by
September 30, 2007
Quarterly and Annual Reporting to the Board
3
2005 CDM Approved Budgets
Conservation and Demand Management Initiatives
$40
$35
$30
$25
$ millions
$20
$15
$10
$5
$Administration
/ Results and
Monitoring
Distributed
Generation
Distribution
Load Control Energy Audits
Loss Reduction and other LDC
and Design
Programs
Advisory
Low Income
HVAC, Lighting
and
Operational
Changes
Education
Meters
4
Review of 2005 Annual Reports
•
•
•
March 31, 2006 “Annual Reports” filed by
the LDCs with the Board.
May 12, 2006 the Board posted a letter on
the web site regarding the review of the
“2005 Annual Reports”:
The Board called for a 2-phase review:
1. Public Review by stakeholders
2. “Audit” Review by Board Staff.
5
How to see the 2005 Annual Reports?
Individual 2005 Annual Reports can be
viewed at:
http://www.oeb.gov.on.ca/html/en/industryrel
ations/ongoingprojects_distconservation_ap
plications.htm
6
Letter re: review of the “2005 Annual
Reports”
7
Public Review of the
2005 Annual Reports
• The deadline for submissions to the Board is
June 9, 2006. Submissions to be sent to the
attention of Board Secretary.
8
Audit Review of selected 2005 CDM Reports
• The “Audit” Review is not envisioned as a
strict audit process. It’s a focused review of
a sample of the reports.
• Board Staff, under the direction of the Chief
Regulatory Auditor, will conduct a review of a
selected sample of the CDM reports.
– The scope of the “audit” review will be:
• The accuracy of the Total Resource Cost calculation.
• Spending the money according to the proposed timing.
• Programs implementation as committed.
9
Preliminary Overview 2005 CDM
Implementation (as reported by LDCs)
Reported 2005 CDM Savings and Spending
Local Distribution
Company
Toronto
Hydro
Hydro
One
Enersource,Hamilton.Ottawa
PowerStream, Veridian
Remaining 70
LDCs
Benefit/Cost Ratio (TRC Test)
1.1
1.9
5.5
4.9 (average)
$ spent per KW saved
$1,052
$1,500
$3,035
$ 1,624 (average)
$ spent per KW hour
2.5 cents
5.0 cents
4.5 cents
2.4 cents (average)
Gross CDM expenditures in
2005
$ 13.5
million
$ 4 million
$ 6.7 million
$ 36.3 million
Net TRC Value
$ 3.2 million
$3.3million
$ 4.6 mllion
$ 28.7 million
Total energy saved in 2005
91.6 million
KWh
8.2 million
KWh
20.8 million KWh
157 million KWh
Total planned to be saved
over the life of the plan
544 million
KWh
80 million
KWh
148 million KWh
1.28 billion KWh
Total peak demand energy
saved
12,800 KW
690 KW
2,200 KW
23,000 KW
10
Utilities with Low Income and Social Housing
Programs Implemented in 2005
(as reported by LDCs)
Low Income Measures
1.
Aurora Hydro Connections Limited
2.
Bluewater Power Distribution Corporation
3.
Brantford Power Inc.
4.
Centre Wellington Hydro Ltd.
5.
Collus Power Corp.
6.
EnWin Powerlines Ltd.
7.
Guelph Hydro Electric Systems Inc.
8.
Haldimand County Hydro Inc.
9.
Hydro One Networks Inc.
10.
Kitchener-Wilmot Hydro Inc.
11.
Niagara Falls Hydro Inc.
12.
Parry Sound Power Corporation
13.
Peninsula West Utilities Limited
14.
Port Colborne Hydro Inc.
15.
St. Catharines Hydro Utility Services Inc.
16.
Tillsonburg Hydro Inc.
17.
Waterloo North Hydro Inc.
18.
Wellington Electric Distribution Company Inc.
19.
Whitby Hydro Electric Corporation
Social Housing Measures
1.
Barrie Hydro Distribution Inc.
2.
Enersource Hydro Mississauga Inc
3.
Erie Thames Powerlines Corporation
4.
Fort Frances Power Corporation
5.
Hamilton Hydro Inc.
6.
Hydro Ottawa Limited
7.
London Hydro Inc.
8.
Newmarket Hydro Limited
9.
Oshawa PUC Networks Inc.
10.
Powerstream Inc.
11.
Toronto Hydro-Electric System Limited
12.
Hydro One Networks Inc.
13.
Kitchener-Wilmot Hydro Inc.
11
2005 Reported Spending and Energy Savings
Social Housing CDM Programs
Social Housing CDM
Measures
$ Budget
Barrie Hydro Distribution Inc.
$
350,000
$
37,000
109,832
Enersource Hydro Mississauga Inc.
$
265,000
$
50,000
0
Erie Thames Powerlines Corporation
$
5,000
$
-
0
Fort Frances Power Corporation
$
20,216
$
-
0
Hamilton Hydro Inc.
$
225,000
$
104,000
4,093,230
Hydro Ottawa Limited
$
156,000
$
21,000
0
London Hydro Inc.
$
50,000
$
3,500
0
Newmarket Hydro Limited
$
300,000
$
6,000
0
Oshawa PUC Networks Inc.
$
100,000
$
-
0
Powerstream Inc.
$
268,000
$
34,969
437,500
Toronto Hydro
$
1,215,000
$
147,371
0
Hydro One Networks Inc.
$
1,500,000
$
38,000
0
Kitchener-Wilmot Hydro Inc.
$
100,000
$
4,550
343,161
$
4,554,216
$ Spent
$
425,390
Savings KWh
4,983,723
12
2005 Reported Spending and Energy Savings
Low Income CDM Programs
Low Income
$ Budget
Aurora Hydro Connections Limited
$
40,000
Bluewater Power Distribution Corporation
$
60,000
Brantford Power Inc.
$
100,000
Centre Wellington Hydro Ltd.
$
5,000
Collus Power Corp.
$
EnWin Powerlines Ltd.
2005 Savings
kWh/yar
$ Spent
-
0
$
23,000
931
$
120,000
122,573
$
-
0
10,000
$
-
0
$
50,000
$
2,513
0
Guelph Hydro Electric Systems Inc.
$
150,000
$
21,486
336,901
Haldimand County Hydro Inc.
$
20,000
$
-
0
$
3,500,000
$
9,000
0
Kitchener-Wilmot Hydro Inc.
$
100,000
$
18,400
1,328,800
Niagara Falls Hydro Inc.
$
25,106
$
-
0
Parry Sound Power Corporation
$
14,000
$
-
0
Peninsula West Utilities Limited
$
12,627
$
-
0
Port Colborne Hydro Inc.
$
7,500
$
-
0
St. Catharines Hydro Utility Services Inc.
$
99,000
$
3,000
0
Tillsonburg Hydro Inc.
$
19,887
$
-
0
Waterloo North Hydro Inc.
$
30,000
$
3,000
4,320
Wellington Electric Distribution Company Inc.
$
10,000
$
104
9,814
Whitby Hydro Electric Corporation
$
40,000
$
-
0
Hydro One Networks Inc.
$
13
$
4,293,120
$
200,503
1,803,339
2006 Electricity Distribution Ratesadditional CDM spending approved
•
The following LDCs had the CDM budget approved as part of their
distribution rates 2006 approval by the OEB:
– Bluewater Power ($ 90 K rate base incremental CDM + $ 160 K)
expense CDM)
– Brantford Power ($ 313 K CDM expense)
– Burlington Hydro ($ 400 K CDM expense)
– Enersource (about $ 1.5 million CDM expense)
– Festival Hydro ($ 9,000 expense on CDM)
– Halton Hills Hydro ($ 90 K rate base incremental CDM + $ 88 K
expense on CDM)
14
2006 Electricity Distribution Rates
additional CDM budget approved
• As part of approval of 2006 electricity
distribution rates the Board approved
additional $ 2.8 million for CDM spending by
local distribution utilities.
• How to see Board Orders approving CDM in
2006 EDR?
http://www.oeb.gov.on.ca/html/en/consumers
/understanding/2006edr_decisions.htm
15
Closing Remarks
• Year 2005 was spent by utilities setting up
their programs.
• In 2006 focus will be on implementation and
results.
• Still huge budget “out there” for Social
Housing and Low Income programs.
16
Board’s CDM web site
• Where to find the information on the OEB
related CDM initiatives:
– http://www.oeb.gov.on.ca/html/en/industryrelations/o
ngoingprojects_distconservation.htm
17