Convocation Center Athletic Training Room Redesign

Download Report

Transcript Convocation Center Athletic Training Room Redesign

CONVOCATION CENTER ATHLETIC
TRAINING ROOM RE-DESIGN
Christine Davis Tarryn Hardgrove Becky Kalla
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Taping/
Rehabilitation
NEW Taping
Taping
 Large space for athletic trainers to tape
efficiently
 Very close to door for easy access and good
traffic flow
 Taping bench has storage
Current Rehabilitation
NEW Rehabilitation
Rehabilitation
 Roughly 9.5’ x 41’
 Out of high traffic area
 Wide doors for handicap and cart access, as
well as equipment installation
 Doors open into hallway so no interference
with rehabilitation
 About 20% of athletic training room
Current Treatment
Current Treatment
NEW Treatment
Treatment
 7 treatment tables
 Adequate space to various forms of
treatment
 Easily accessible for injured athletes
 Outlets with GFIs
 Tables contain storage area underneath
 Sinks close to hydrotherapy room to share
plumbing
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Hydrotherapy
Current Hydrotherapy
Current Hydrotherapy
Current Hydrotherapy
Current Hydrotherapy
NEW Hydrotherapy
Hydrotherapy











Room 17’ x 16’
Easy entrance and exit
Door opens inward so no interference with rehabilitation
Clearly visible with large windows
2 Ice machines
High outlets with GFI in case of flooding
Refrigerator
Wall drain
Back wall is plastic and water-proof
Cold Pool 71’ x 81’
Roughly 16% of athletic training room
Current Convocation Athletic
Training Room
Current Convocation Athletic
Training Room
Current Bathrooms
NEW Storage
Storage
 About 14’ x 15’
 Away from hydrotherapy in case of flooding
Current Offices
NEW Offices
Offices
 Roughly 14’ x 16’
 Large windows for clear visibility and
supervision over all areas of facility
 Limited and secure access to medical
documents
Demolition
 Tearing down all walls, doors, and ceiling
 Removing carpet and tile flooring
 Taking out whirlpool/cold tub
 Total Estimated Cost : $17,843
New Construction
 1752 square feet
 Large windows for supervision
 Wheelchair accessible
 Open Rehabilitation Area
 Estimated Costs $139,964
New Construction