AIM Management Organization

Download Report

Transcript AIM Management Organization

In-Process and Potential
Future Software
Capabilities Status
Danette Likens and Jamie Stewart
AIM Team
4 April 2012
Functional Overview
•
Rel 5.1: completed CPM/LO Module functions
deployed immediately – 30 April 2012
•
Rel 5.x: In-work CPM/LO Module functions –
schedules TBD based on acceptance testing –
summer/fall 2012
•
Rel 6.0: in-work CPM/LO Module functions that
require database changes -> full NMCI testing –
scheduled for December 2012 GAT
•
Rel 7.0: To be determined based on upcoming
software modification task orders
•
Discussion of potential future capabilities
Release 5.1 Functionality
Targeted for 30 Apr 12
•
CPM: Capability to filter Data tab/Resource tab
elements used in JDTA and learning objective
development data on a Center-by-Center basis
•
CPM: Generate a CTTL report product from existing
native CPM data elements
•
CPM: Updated KSATR functionality
•
CPM: Provide CPM Administrators greater control over
and the ability to eliminate data redundancies and
duplications (‘gatekeeper’ functions)
•
LO Module: Copy multiple nested DPs/RIAs from AIM
I/II curricula into LO Module
Summary of Rel 5.1
Tool Impacted
Functionality
Target
Release
LO
Date
AIM I AIM II
CPM
Module
Capability to filter Data tab and Resource tab elements used
in JDTA and learning objective development data on a Centerby-Center basis
X
5.1
Apr-12
Generate a CTTL report product from existing native CPM
data elements
X
5.1
Apr-12
5.1
Apr-12
Copy nested DPs/RIAs from AIM I/II into LO Module
X
Update CPM KSATR functionality
X
5.1
Apr-12
Provide CPM Administrators greater control over and the
ability to eliminate data redundancies and duplications
X
5.1
Apr-12
Release 5.X Functionality
Targeted for 2012
•
AIM I/II/LO Module: Atlas Pro LMS interface – fall 2012
•
AIM II: permit ‘ignoring’ the CMS – permit approval of course
without completed CMS IAW ACR 79 – summer 2012
•
AIM II: allow copying a DP from one topic to another IAW ACR
83 – summer 2012
•
AIM II: utility to list/print RRL items by category IAW ACR 54 –
summer 2012
•
LO Module: Enable the user to replace RRL items IAW ACR 198 –
fall 2012
•
LO Module: Enhance In-use function management in – fall 2012
•
LO Module: Select later IETM IAW ACR 167 – fall 2012
Summary of Rel 5.X
Tool Impacted
Functionality
Atlas Pro LMS interface
AIM II: permit ‘ignoring’ the CMS – permit approval of course
without completed CMS IAW ACR 79
AIM II: allow copying a DP from one topic to another IAW
ACR 83
AIM II: utility to list (and optionally print) all Resource
Requirement List (RRL) items by category IAW ACR 54
Release
LO
AIM I AIM II
CPM
Module
X
X
X
Target
Date
5.x
Fall-12
X
5.x
Summer-12
X
5.x
Summer-12
X
5.x
Summer-12
Select later IETM IAW ACR 167
X
5.x
Fall-12
Enhance In-use function management in LO Module
X
5.x
Fall-12
Enable the user to replace RRL items IAW ACR 198
X
5.x
Fall-12
Release 6.0 Functionality
Targeted for December 2012
•
AIM I/II/LO Module: Portion marking IAW ACRs
66/129 – functional support from NSWCEN and CID
•
AIM II: Modification TPP
•
AIM II: support multi-volume LPs IAW ACR 220
•
CPM: Extend current functionality of CPM Existing
Interventions tab to support linking of elements
from existing traditional AIM I/AIM II curricula
Release 6.0 Functionality
Targeted for December 2012
(contd)
AIM I/II/LO Module: Atlas Pro Assessment Engine
interface
• LO Module: Atlas Pro ROCCE interface
• LO Module: Support generation of FAL and
implementation of other Fault capabilities IAW ACR
191 – faulting portion only
• LO Module: Provide capability equivalent to AIM I to
link to later IETMs during life-cycle surveillance and
maintenance of learning content originally linked to
IETM data during development IAW ACR 167
•
Summary of Rel 6.0
Tool Impacted
Functionality
Release
LO
AIM I AIM II
CPM
Module
Target
Date
Portion marking IAW ACRs 66/129 – functional support from
NSWCEN and CID
X
X
X
6.0
Dec-12
Atlas Pro Assessment Engine interface
X
X
X
6.0
Dec-12
AIM II: Modification TPP
X
6.0
Dec-12
AIM II: support multi-volume LPs IAW ACR 220
X
6.0
Dec-12
LO Module: Extend current functionality of CPM Existing
Interventions tab to support linking of elements from existing
traditional AIM I/AIM II curricula
X
6.0
Dec-12
LO Module: Atlas Pro ROCCE interface
X
6.0
Dec-12
X
6.0
Dec-12
X
6.0
Dec-12
LO Module: Support generation of FAL and implementation
of other Fault capabilities IAW ACR 191 (faulting portion
only)
LO Module: Provide a capability equivalent to that in AIM I to
link to later IETMs during life-cycle surveillance and
maintenance of learning content originally linked to IETM data
during development IAW ACR 167
Release 7.0
Functionality and
Schedule TBD
Future Capabilities
•
•
CPM/JDTA and LO Module versioning
‒
Discussed in NAVEDTRA 136 business process agenda
item
‒
White papers posted on AIM Web site for FRB review
FEA support in CPM
‒
Discussed in NAVEDTRA 136 business process agenda
item
•
BCA support in CPM
•
Master Course File/HPRR tracking application
Future Capabilities
(contd)
Support for additional test item types in AIM I/II
and LO Module
• Correct current misalignment of numbering
between LO Module screens and LP print-out – to
be discussed in ACR/FRM topic
• Resource, IMI, and IETM Versioning – to be
discussed in ACR/FRM topic
•
Future Capabilities
(contd)
CPM data retention/revision tracking – to be
discussed in ACR/FRM topic
• Add Jobs Server implementation to AIM I/II Central
Sites to support off-line execution of timeconsuming processes like TG preview – discussed
in NETPDTC hosting topic and to be revisited in
ACR/FRM topic
• Allow mapping multiple JDTA items to single
learning objective – to be discussed in ACR/FRM
topic
•
Future Capabilities
(contd)
Enhance RRL category to support PC simulation
scenarios – to be discussed in ACR/FRM topic
• LO Module glossary consolidation at Lesson level
– to be discussed in ACR/FRM topic
• Add capability for bulk Submit and bulk Accept of
JDTA items as well as omitting Accept step for
small Centers – to be discussed in ACR/FRM topic
•
OCCSTDS Support in CPM
•
How did we get here?:
– Started with NETC N74/NAVMAC discussions
– AIM Team Provided a CPM “sandbox” for NAVMAC familiarization
– NAVMAC developed an OCCSTDS Storybook PPT to describe highlevel functionality
– Initial OCCSTDS tab implementation in Rel 5.0 for
creation/management of OCCSTDS data by NAVMAC – crawl
functionality
– Initial design for automated import of approved OCCSTDs
– Discussing more advanced automation of support
•
Working toward business rule definition of:
– How OCCSTDS data pulls forward into JDTA tab
– Life-cycle impacts of OCCSTDS revisions on JDTA-based learning
content
– Discussing coding to support above items
Demonstrations
Questions?
Backup Slides
Assessment Engine and AIM Test Item
Types
ROCCE/Assessment Engine Test Item Types Support for ETMDS
Multiple choice with option for "All of the Above" and "None
of the Above"
Multiple Select Select one or more correct answers
Match list of text strings in one column to another list of text
Matching
strings in a second text column
One or more blanks in a question and each blank can contain
Fill in the Blanks
one or more correct text answers ( case sensitive)
Fill in the Drop
One or more dropdowns in a question and each dropdown can
Down
contain two or more items in the dropdown
True/False
Ranking - Sorting Sort two or more of text strings
Create a background image providing the hot spot coordinates
Hot Spot
to select to provide your answer
Ability to create a question and provide a answer that falls in a
Numeric
numeric decimal range
Match list of text strings in one column to another list of text
Drag and Drop
strings in a second text column
Narrative description of instructor-administered performance
Performance
assessment (not support by ROCCE AE)
Multiple Choice
AIM Test
Module
X
X
X
X
X