2-SP6 “Validation”
Download
Report
Transcript 2-SP6 “Validation”
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Milan Malpensa
Validation Activities
Demonstration Day
Malpensa, 2009-02-26
Antonio Nuzzo
Daniele Teotino
Internet: http://www.dlr.de/emma
Integrated Project of the
Sixth Framework Programme,
Priority 1.4:
Aeronautics and Space,
sponsored by EC, DG TREN
Contract FP6-503192
MXP Validation Activity
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
RTS1a: Rome (April 08), SICTA/SELEX Tower Simulator
RTS2: Amsterdam (July 08), NARSIM Tower Simulator (NLR)
RTS1b: Naples (October 08), SICTA/SELEX Tower Simulator
OSTs (SM + ATTAS trials): Malpensa Tower (November 08)
A. Nuzzo, ENAV SpA
STEP-BY-STEP APPROACH
• EFS
RTS1a
• EFS
• SCA
• EFS
• SCA
• RP
RTS2
RTS1b
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
• EFS
• RP
• MLAT
• ADS-B
• TIS-B
• TAXI-CPDLC
OSTs
2
MXP ATCO HMI
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
TSD: Non-cooperative + Cooperative surv.
Automatic identification
Main results:
MSB
A-SMGCS HMI consistent with ministrip
ATCOs’ way of working
Visibility on the Aprons
EFS bay
SCA warning
Overall good opinion on the system usability
A. Nuzzo, ENAV SpA
EFS HMI
TOC and AOC using EFS reliable and easy to use
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
3
Route Planner (RP)
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Main results:
Great interest in RP function
Priority to the standard route presentation, as first step
A. Nuzzo, ENAV SpA
Intensive tuning essential to capture full benefits
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
4
TAXI-CPDLC & TIS-B
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Trial #1
Tested during ATTAS trials
Trial
#1
ATTAS
CPDLC
Message
ATC
CPDLC
message
ATCO
ATTAS is at the self-manoeuvring stand 121 (no
push-back required) and is ready to start-up
REQUEST
START-UP
CLEARANCE
1
2
3
START-UP
APPROVED
CDD
CONTACT
GROUND
121.9
CDD
WILCO
4
5
WILCO
6
REQUEST
TAXI
CLEARANCE
7
A. Nuzzo, ENAV SpA
Trial #2
8
Trial #3
TAXI TO
HOLDING
POINT RWY
35L VIA TWY
B BE
GEC
CONTACT
TOWER
128.350
GEC
WILCO
9
10
WILCO
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
5
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Conclusions (1/2)
ATCOs’ feedback gathered through questionnaires, observation and debriefings
Operational Improvements
Situational awareness
ATCO’s SA not affected by the new HL A-SMGCS functions
Positive opinion in terms of:
• prediction of traffic evolution
• planning and organisation of the work
• usefulness of information provided by the A-SMGCS
system
Safety
2
3
4
5
The safety improvement of MLAT, T-EFS and E-SCA
Measured
visibility conditions
introduction is “not relevant” in normal
mean value
There’s confidence that, with the introduction of new
functionalities, the Target Level of Safety can be met 3.48
Further development should also be supported by Safety
Assessment
A. Nuzzo, ENAV SpA
1
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
6
Conclusions (2/2)
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Workload
The new A-SMGCS functions, with special reference to the EFS HMI,
will not increase workload
10
9
8
Mean values
7
6
5
RTS1b
4
3
2
© EMMA2, EMMA2 Demonstration Day, Malpensa, 200902-26
N
T
TI
O
R
ST
R
A
FO
FR
U
FO
R
PE
R
R
PO
TE
M
EF
M
A
N
C
E
D
A
N
EM
D
A
L
D
L
A
YS
IC
PH
TA
L
D
EM
EM
A
A
N
D
N
D
0
M
EN
A. Nuzzo, ENAV SpA
1
7