Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS …

Download Report

Transcript Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS …

Item No.10.0
STRENGTHENING OF
POLLUTION CONTROL BOARDS
AND COMMITTEES
Decisions of the 55th Meeting with PCBs/PCCs
( 17.8.2009)
Consolidated requirements on;
(a) Laboratories
(b) Computerisation
(c) Staffing
(d) Infrastructure
(e) Common Waste Management
(CETPS, TSDF, CBMWTF)
facilities
SUMMARY/ ABSTRACT
TOTAL REQUIREMENT
Rs.1059.3955 crores
COMPONENTS
1 Laboratories
: Rs.384.7327 crores
2 Computerisation
: Rs.46.9957 crores
3 Infrastructure
: Rs.627.6654 crores
Total : Rs.1059.3956 crores
STAFFING NEEDS
(ADDITIONAL REQUIREMENTS)
1 Additional requirement
: 9384
scientific/ Technical /
Computer
4610
2 Existing staff
Scientific/ Technical
: 6055
1315
+
1564
2879
COMMON WASTE MANAGEMENT
FACILITIES
Facilities
Requirements
Existing
CETPs
129
147
TSDF
36
27
CBMWTF
86
177
ANALYSIS OF REQUIREMENTS (Rs. in crores)
{LABORATORY}
<1.0
1-5
5-10
>10
Andaman
Arunachal
Assam
Andhra Pradesh
Lakshadweep
Bihar
Delhi
Chhatisgarh
Chandigarh
Goa
Gujarat
Daman Diu
Karnataka
Haryana
Himachal
Kerala
Jammu & Kashmir
Manipur
Punjab
Jharkhand
Meghalaya
Uttrakhand
Madhya Pradesh
Mizoram
Maharashtra
Nagaland
Orissa
Pudducherry
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttar Pradesh
West Bengal
Groupings of Total Requirement (Rs. in crores)
<1.0
1-10
10-50
>50
Andaman
Arunachal
Andhra
Haryana
Chandigarh
Assam
Jharkhand
Daman Diu
Bihar
Madhya Pradesh
Lakshadweep
Chhattisgarh
Rajasthan
Manipur
Goa
Tamil Nadu
Meghalaya
Delhi
Uttar Pradesh
Mizoram
Gujarat
Nagaland
Himachal
Pudduchery
J&K
Sikkim
Karnataka
Tripura
Kerala
Maharashtra
Orissa
Punjab
Uttrakhand
West Bengal
BLUE PRINTS ON STRENGTHENING
1
Madhya Pradesh
2
Assam
3
Lakshadweep
4
Uttar Pradesh
5
Mizoram
6
Tripura
7
Nagaland
8
Himachal Pradesh
9
Goa
10 Manipur
11 Tamil Nadu
CONTENTS OF BLUE PRINT
1. Introduction
2. Need of the Document
3. Present status of Pollution Control
4. Mandates & Activities
5. Present set-up of Board
6. Goals for Pollution Control
7. Proposal for strengthening
8. Co-ordination with State agencies
9. SPCB and Public involvement
10. Conclusion
BASIS OF ESTIMATES
Laboratories
Compliance
Monitoring
:
Gradation/ Locational needs
:•
•
•
•
•
Special Tasks : •
•
•
•
Central
A
Zonal / Regional
B
Need based
C
Parameters prescribed: source/
Ambient
Performance of ETP, CETP,
APCD, TSDF.
Hazard Assessment
Accident management
Ambient monitoring
State-specific R&D
CAPABILITIES OF LABORATORIES
A – Grade
B –Grade
C -Grade
Physical
15
14
13
Inorganic General & Non metals
21
18
13
Organic
13
9
4
Trace metals
28
18
9
Microbiological
7
5
2
Bio-assay
5
3
2
Bio-monitoring
8
6
1
Hazardous Waste
6
0
0
Soil, Sludge, Sediment
37
31
15
Ambient Air
15
10
5
Source Emission
18
18
6
Noise
+
+
+
Vehicular emission
4
3
3
Parameters
COSTING OF LABs
In Crores
A
B
C
6.45
1.34
0.4590
Instruments
Water waste
water
Hazardous
waste
Air/ Emission
Parameters
55
148
07
30
40
BASIS OF ESTIMATES
Computerisation
1. Linkages RO
HO
CPCB
2. Data Management & Reports
Infrastructure
: • No rented Premises for Lab
•Monitoring vehicles for timely
transportation of samples; and
enhancing
monitoring
frequency.
• Un-interrupted lab
functioning- Power back-up
STAFFING NEEDS
Project Fellows
: Analytical support on job
training (PG/PhD)
Regular Scientist/ : Concentrate on specific
Engineer
jobs, R&D to keep
scientific tempo.
Administration
Finance
& : Optimal requirement
TOTAL REQUIREMENT
Rs.1059.3955 crores
CURTAILING REQUIREMENTS
OPTIONS
OUT-SOURCING
( may be not possible,
Need money again)
DRAFT PROPOSAL
(Funding Formula)
• Central Government
• State Government
• Own Resources of SPCB/PCC
• Bilateral programme
Time Frame
THANKS TO ALL
i.
MEF and MoEF for support &
looking for further Directions
ii. 28 SPCBs and 6 PCCs for
support and co-operation.
iii. Chairman CPCB for hammering