Transcript Document
IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CARLOS CARDOSO MARIA LEONOR NUNES IPIMAR – JANUARY 2005 ETIV - EMAS Technical Implementation and Verification1 1 IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. ETIV - EMAS Technical Implementation and Verification2 2 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY WHAT IS EMAS? EMAS means EcoManagement and Audit Scheme EMAS is an environmental management scheme for organizations operating in the European Union and European Economic Area EMAS aims to promote continuous evaluation and improvement in the environmental performance of participating organizations EMAS brings together environmental protection and economic development + EMAS does not replace Community or national environmental legislation ETIV - EMAS Technical Implementation and Verification3 3 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY DIFFERENCES BETWEEN EMAS AND ISO 14001 EMAS REQUIRES A PRELIMINARY ENVIRONMENTAL REVIEW EMAS REQUIRES A GREATER CONTROL OVER SUPPLIERS AND CONTRACTORS EMAS ESTABLISHES THE AUDITS’ FREQUENCY AND METHODOLOGY EMAS DEMANDS COMPANIES TO PUBLISH AN ENVIRONMENTAL STATEMENT EMAS PROVIDES FOR A CERTIFICATION SYSTEM WITH INDEPENDENT ENVIRONMENTAL VERIFIERS AND REGISTRATION BODIES ETIV - EMAS Technical Implementation and Verification4 4 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY THE MAIN STEPS FOR IMPLEMENTATION OF EMAS ENVIRONMENTAL POLICY ENVIRONMENTAL REVIEW PLANNING ENVIRONMETAL LEGAL REQUIREMENTS ENVIRONMENTAL OBJECTIVES AND TARGETS ENVIRONMENTAL PROGRAMME RESPONSIBILITIES TRAINING ORGANIZATION AND PERSONNEL COMMUNICATION DOCUMENTATION DOCUMENTATION CONTROL OPERATIONAL CONTROL PREVENTION AND EMERGENCY PREPAREDNESS MONITORING AND MEASUREMENT OPERATION NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS ENVIRONMENTAL RECORDS INTERNAL AUDITS ENVIRONMENTAL MANAGEMENT SYSTEM VERIFICATION MANAGEMENT REVIEW PUBLIC COMMUNICATION VALIDATION, VERIFICATION AND RECORDS ETIV - EMAS Technical Implementation and Verification5 5 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PLANNING: CONDITIONS NEEDED FOR EMAS APPLICATION Consists of: FIRST OF ALL: ENVIRONMENTAL POLICY Aims Principles of Action Involves: THE REAL SITUATION: ENVIRONMENTAL REVIEW Thorough examination of all environmental aspects Identification of the aspects with a significant impact ENVIRONMENTAL LEGAL REQUIREMENTS ENABLES Are set considering: ENABLE ENVIRONMENTAL OBJECTIVES AND TARGETS REQUIRE Legal and regulatory requirements Environmental aspects with significant impact All available technological options Financial and operational requirements Consists of: ENVIRONMENTAL PROGRAMME All measures required for achieving the objectives and targets Definition of responsibilities Detailed and scheduled plan for the measures application ETIV - EMAS Technical Implementation and Verification6 6 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ORGANIZATION AND PERSONNEL: COMPONENTS OF EMAS STRUCTURE Involve: RESPONSIBILITIES Definition of section responsibilities Constitution of the EMS team Raising environmental awareness TRAINING Training employees connected with significant environmental impacts Internal EMS courses COMMUNICATION Requires: Procedures for internal and external communication Includes: DOCUMENTATION System manual System and Operational procedures Records, external documents and others DOCUMENTATION CONTROL Encompasses: Localization, periodic analysis and removal Comprises: OPERATIONAL CONTROL Operations and activities Goods and services PREVENTION AND EMERGENCY PREPAREDNESS Entails: Identification of accidents and emergencies Development of plans for emergency response ETIV - EMAS Technical Implementation and Verification7 7 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY OPERATION: CONTROL OF EMAS APPLICATION Enables: MONITORING AND MEASUREMENT To monitor the performance of the relevant operational controls To verify conformance with environmental objectives and goals Detection of non-conformances: NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS From emergencies, audits and monitoring & measurement actions Definition of the required corrective and preventive actions The records prove the application of all EMAS requirements ENVIRONMENTAL RECORDS Therefore, must be: Legible, identified, connected with the respective activity and adequately kept Verify compliance with: INTERNAL AUDITS Regulations Environmental goals ETIV - EMAS Technical Implementation and Verification8 8 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY VALIDATION AND VERIFICATION OF EMAS BY EXTERNAL ENTITIES Involves: MANAGEMENT REVIEW Thorough analysis of the internal audit’s results Guidelines for the improvement of EMS in the company PUBLIC COMMUNICATION EMAS requires: Presentation of an environmental statement Encompasses: Commissioning an independent environmental verifier VALIDATION, VERIFICATION AND RECORDS Validation by the verifier (only if there is full compliance with all EMAS requirements) Application for registration under EMAS After a positive evaluation of the EMAS implementation: Registration is granted ORGANIZATION REGISTERED UNDER EMAS ETIV - EMAS Technical Implementation and Verification9 9 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY APPLICABLE LEGISLATION (PORTUGUESE LAW) Quality of natural resources (air, water, soil, etc.) GENERAL ASPECTS - Law Nº 11/87 WATER - Law Nº 236/98 Pollution prohibition Attribution of responsibilities to the organization that produced the pollutant agent(s) Emission Limits (COD, BOD5, SST, etc.) Requisites for an Emission License Company’s Control Records Infraction Penalties Emission Limits (for SO2, NO2, CO and others) AIR - Law Nº 286/93 - Law Nº 78/2004 Prohibition of the substances that Deplete the Ozone Layer (CFCs, Halons, MBr and Others) Infraction Penalties Rules for prevention and control of atmospheric pollutants ETIV - EMAS Technical Implementation and Verification10 10 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY APPLICABLE LEGISLATION (PORTUGUESE LAW) WASTE - Law Nº 239/97 - Law Nº 335/97 - Law Nº 366-A/97 - Law Nº 209/2004 Rules concerning storage, elimination of waste treatment and Waste Classification and Separation Waste Transport Regulation Special Treatment of the Dangerous Waste Infraction Penalties Temporary and permanent noise NOISE - Law Nº 292/2000 - Law Nº 259/2002 Sensible and mixed zones Establishment of quantified limits for the two zones and distinction between day and night time Infraction Penalties Attribution of special noise licenses ETIV - EMAS Technical Implementation and Verification11 11 INTRODUCTION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ADVANTAGES OF AN ENVIRONMENTAL MANAGEMENT SYSTEM COST REDUCTION: Improved operational efficiency (lower consumption of energy and raw materials) RISK REDUCTION: Reduced likelihood of serious and costly accidents COMPETITIVE BENEFITS: Improvement of the company’s image with consumers, regulatory authorities and general public ACTIVE ORGANIZATIONAL STRUCTURE: Advantageous for other purposes (for instance, implementation of quality management systems) ETIV - EMAS Technical Implementation and Verification12 12 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY GENERAL ASPECTS LARGE NUMBER OF SPECIES CONSUMED IN MANY DIFFERENT FORMS (FRESH, FROZEN, SMOKED, CANNED, ETC.) 120 MILLION TONNES WORLD PRODUCTION OF FISH IN YEAR 1998 OVER 80 % OF THE FISH PRODUCTION IS FOR HUMAN FOOD ABOUT 60 MILLION TONNES ARE INDUSTRIALLY PROCESSED (FREEZING/THAWING, CUTTING, FILLETING, COOKING, ETC.) A THIRD OF THE PROCESSED QUANTITY ENDS UP AS INDUSTRIAL WASTE FISH PRODUCTION - 120 M.T. HUMAN CONSUMPTION FRESH Non-food OTHER USES uses 17% 33% INDUSTRIAL WASTE 20 M.T. HUMAN CONSUMPTION PROCESSED 50% ETIV - EMAS Technical Implementation and Verification13 13 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL BALANCE OF THE FROZEN FISH INDUSTRY WATER FRESH OR FROZEN FISH WASTEWATER SOLID WASTE ENERGY FROZEN FISH INDUSTRY REFRIGERANT LOSSES ODOUR CHEMICALS FROZEN FILLETS NOISE ETIV - EMAS Technical Implementation and Verification14 14 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL BALANCE OF THE CANNING INDUSTRY WATER FRESH FISH WASTEWATER SOLID WASTE ENERGY REFRIGERANT LOSSES CHEMICALS CANNING INDUSTRY ODOUR PACKING MEDIA CANS NOISE CANNED FISH DAMAGED CANS ETIV - EMAS Technical Implementation and Verification15 15 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY DESCRIPTION OF THE FROZEN FISH FACTORY (XPTO) PORTUGUESE FACTORY, LOCATED NEAR LISBON XPTO LISBON PRODUCES FROZEN FILLETS FROM FROZEN FISH PROCESSES 10 TO 12 TONS OF FISH PER DAY AND OPERATES 5 DAYS PER WEEK ALL YEAR ROUND PROCESSED SPECIES: HAKE TUNA MACKEREL AND MANY MORE CHOSEN PRODUCTION LINE: PRODUCTION OF HAKE FILLETS (850 TONS OF HAKE PROCESSED PER YEAR) ETIV - EMAS Technical Implementation and Verification16 16 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PROCESS DIAGRAM OF THE FROZEN FISH FACTORY (XPTO) RAW FISH RECEPTION AND SELECTION RAW FISH STORAGE FINAL PRODUCT STORAGE DESAGGREGATION OF FROZEN BLOCKS PACKAGING CUTTING AND TRIMMING FREEZING TUNNEL CALIBRATION AND WEIGHING GLAZING DISTRIBUTION FINAL PRODUCT IN RETAILER ETIV - EMAS Technical Implementation and Verification17 17 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY XPTO’S PROCESS DIAGRAM & ASSOCIATED ENVIRONMENTAL ASPECTS RAW FISH RECEPTION AND SELECTION RAW FISH STORAGE REFRIGERANT LOSSES (AMMONIA) FINAL PRODUCT STORAGE DESAGGREGATION OF FROZEN BLOCKS SOLID WASTE (FISH) GASEOUS NITROGEN CUTTING AND TRIMMING FREEZING TUNNEL LIQUID NITROGEN GLAZING WATER ELECTRICAL ENERGY PACKAGING CALIBRATION AND WEIGHING DISTRIBUTION SOLID WASTE FINAL PRODUCT IN RETAILER WASTEWATER (CARDBOARD, PLASTIC) ETIV - EMAS Technical Implementation and Verification18 18 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY DESCRIPTION OF THE CANNED FISH FACTORY (CCC) PORTUGUESE FACTORY, LOCATED IN NORTH PORTUGAL CCC PROCESSES 20 TONS OF FISH PER DAY AND OPERATES 220 DAYS A YEAR PROCESSED SPECIES: SARDINE, TUNA, MACKEREL, OCTOPUS AND SQUID PACKING MEDIA USED: TOMATO SAUCE, VEGETABLE OIL, OLIVE OIL, BRINE AND HOT PEPPER SAUCE CHOSEN PRODUCTION LINE: PRODUCTION OF CANNED SARDINES (1500 TONS OF SARDINE PROCESSED PER YEAR) ETIV - EMAS Technical Implementation and Verification19 19 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PROCESS DIAGRAM OF THE CANNED FISH FACTORY (CCC) FRESH SARDINE FREEZING WASHING GLAZING BRINE PRODUCTION BRINING STORAGE THAWING HEADING, EVISCERATING, WASHING AND CANNING TOMATO SAUCE PREPARATION WASHING STEAM PRODUCTION COOKING STERILIZATION FINAL PRODUCT STORAGE DISTRIBUTION TOMATO SAUCE ADDITION AND CAN SEAMING COOLING CAN WASHING COOLING CHLORINATED WATER PREPARATION CANNED SARDINE IN RETAILER ETIV - EMAS Technical Implementation and Verification20 20 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CCC’S PROCESS DIAGRAM & ASSOCIATED ENVIRONMENTAL ASPECTS FRESH SARDINE FREEZING GLAZING WASHING STORAGE PACKING MEDIA THAWING TOMATO SAUCE PREPARATION TOMATO SAUCE ADDITION AND CAN SEAMING ELECTRICAL ENERGY COOLING WATER BRINE PRODUCTION COOKING BRINING HEADING, EVISCERATING, WASHING AND CANNING WASHING CANS CAN WASHING WASTEWATER SOLID WASTE STEAM PRODUCTION STERILIZATION FUEL OIL COOLING CHLORINATED WATER PREPARATION FINAL PRODUCT STORAGE REFRIGERANT LOSSES (AMMONIA) DAMAGED CANS DISTRIBUTION CANNED SARDINE IN RETAILER ETIV - EMAS Technical Implementation and Verification21 21 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF CLEANER PRODUCTION (CP) THERE ARE IMPORTANT CLEANER PRODUCTION OPPORTUNITIES FOR THE FISH PROCESSING INDUSTRY THAT ONLY REQUIRE MINOR CHANGES IN THE PROCESS: TRAIN STAFF IN GOOD CLEANING PRACTICES REGULAR MAINTENANCE TO AVOID INEFFICIENCIES KEEP WORK AREAS TIDY AND UNCLUTTERED TO AVOID ACCIDENTS INSTALL DRIP PANS OR TRAYS TO COLLECT DRIPS AND SPILLS SEGREGATE WASTE FOR REUSE AND RECYCLING IDENTIFY AND MARK ALL VALVES TO PREVENT ANY INCORRECT SETTING ETIV - EMAS Technical Implementation and Verification22 22 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF CLEANER PRODUCTION (CP) SIMPLE WAYS TO SAVE WATER: USE OFFAL TRANSPORT SYSTEMS THAT AVOID OR MINIMISE THE USE OF WATER INSTALL DEVICES THAT CONTROL WATER FLOW FOR MANUAL CLEANING USE HIGH PRESSURE WATER TO CLEAN SURFACES PRE-SOAK FLOORS AND EQUIPMENT TO LOOSEN DIRT BEFORE THE FINAL CLEANING REUSE WASTEWATERS (EX.: THAWING WASTEWATERS FOR INITIAL CLEANING STEPS) ETIV - EMAS Technical Implementation and Verification23 23 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF CLEANER PRODUCTION (CP) AFTER CP PRACTICES BEFORE CP PRACTICES WATER DIRTY SURFACE DETERGENTS WATER DIRTY SURFACE DETERGENTS PRE-SOAKAGE MULTIPLE WASHING OPERATIONS SCRAPING FINAL WASHING CLEAN SURFACE CLEAN SURFACE WATER SAVING ETIV - EMAS Technical Implementation and Verification24 24 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF CLEANER PRODUCTION (CP) THERE ARE ALSO SIMPLE AND EFFECTIVE WAYS TO REDUCE THE EFFLUENT LOADS: SWEEP UP SOLID WASTE FOR USE AS A BY-PRODUCT COLLECT OFFAL AND BLOOD IN A SPECIAL BIN CLEAN FISH WITH VACUUM HOSES USE DRY CLEANING TECHNIQUES (EX.: SCRAPING FLOOR BEFORE CLEANING) FIT DRAINS WITH SCREENS TO REDUCE THE AMOUNT OF SOLID WASTE IN THE EFFLUENT ETIV - EMAS Technical Implementation and Verification25 25 FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF CLEANER PRODUCTION (CP) SOME EASY WAYS TO SAVE ENERGY: REGULAR MAINTENANCE TO AVOID ENERGY INEFFICIENCIES IMPROVE INSULATION ON COOLING/HEATING SYSTEMS ELIMINATE STEAM LEAKS TRAIN STAFF TO SWITCH OFF EQUIPMENT WHEN NOT IN USE OTHERWISE USE SENSORS TO TURN OFF LIGHTS AND EQUIPMENT ETIV - EMAS Technical Implementation and Verification26 26 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTATION OF EMAS PLANNING Conditions needed for a successful accomplishment of EMAS ORGANIZATION AND PERSONNEL OPERATION ENVIRONMENTAL MANAGEMENT SYSTEM VERIFICATION Components essential to build up all EMAS structure Control & guarantees of an effective EMAS application Validation & verification of the implemented system by external entities ETIV - EMAS Technical Implementation and Verification27 27 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PLANNING: CONDITIONS NEEDED FOR EMAS APPLICATION ENVIRONMENTAL POLICY DIFFICULTIES: ENVIRONMENTAL REVIEW Identification of the aspects with an environmental impact Quantification and selection of the aspects with a significant impact ENVIRONMENTAL LEGAL REQUIREMENTS ENVIRONMENTAL OBJECTIVES AND TARGETS DIFFICULTIES: ENVIRONMENTAL PROGRAMME Discussion for the assignment of responsibilities Much intense work in order to construct a detailed plan ETIV - EMAS Technical Implementation and Verification28 28 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL POLICY (CCC AND XPTO) ENVIRONMENTAL PROTECTION IS THE MAIN KEY TO THE COMPANY’S DEVELOPMENT THE COMPANY’S PREMISES MUST ADOPT WASTE MANAGEMENT POLICIES ALL WORKING STAFF MUST ACCOMPLISH THE FOLLOWING: RESPECT THE ENVIRONMENT FOLLOW ALL APPLICABLE LEGISLATION SEARCH PERMANENTLY FOR INDUSTRIAL OPTIMIZATION REDUCE RAW MATERIALS AND ENERGY CONSUMPTION REGISTER AND INVESTIGATE ALL ACCIDENTS AND COMPLAINTS ADEQUATE TRAINING FOR ALL WORKERS AND PEOPLE INVOLVED GOOD RELATIONSHIP WITH ALL NEIGHBOURS COOPERATE WITH ORGANIZATIONS COMMITED TO A HIGHER ENVIRONMENTAL PROTECTION ETIV - EMAS Technical Implementation and Verification29 29 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL REVIEW: ASSESSMENT METHODOLOGY WATER SOLID WASTE • Fish offcuts TOTAL AND DETAILED CONSUMPTION • Cardboard 500 l • Plastic WASTEWATER • SST • COD • BOD5 • Oil content Factory • pH • N/P content ELECTRICAL ENERGY • TOTAL CONSUMPTION 999 • EQUIPMENT CONSUMPTION ETIV - EMAS Technical Implementation and Verification30 30 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL REVIEW (XPTO) QUANTIFIED ENVIRONMENTAL IMPACTS Environmental aspect Value per year Value per ton of processed hake Water consumption (m3) Energy consumption (kWh) Detergents consumption (l) Ammonia release (l) Nitrogen release (l) Fish waste production (ton) Common garbage production (m3) Plastic production (ton) Cardboard production (ton) Wastewater discharge (m3) 3240 709000 1670 60 170000 25.4 257 11.6 23.6 3240 3.8 834 2 0.07 200 0.030 0.30 0.014 0.028 3.8 MAXIMUM VALUES THE GLAZING WASTEWATER PROBLEM Glazing wastewater parameters Volume (m3/year) Volume (m3/ton of processed hake) COD (mg O2/l) BOD5 (mg O2/l) Nitrogen (mg N/l) Value 120 0.14 752 200 8.78 (Portuguese Legislation) COD 150 mg O2/l BOD5 40 mg O2/l ETIV - EMAS Technical Implementation and Verification31 31 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL ASPECTS WITH A SIGNIFICANT IMPACT (XPTO) 1 TON FROZEN HAKE 3.8 m3 TOTAL WASTEWATER 3.8 m3 WATER GLAZING WASTEWATER (4 % OF TOTAL) COD: 752 mg O2/l XPTO 834 kWh ENERGY 0.97 TON FROZEN HAKE FILLETS BOD5: 200 mg O2/l 0.3 m3 COMMON GARBAGE ETIV - EMAS Technical Implementation and Verification32 32 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL REVIEW (CCC) QUANTIFIED ENVIRONMENTAL IMPACTS Environmental aspect Value per year Water consumption (m3) Electricity consumption (kWh) Fuel oil consumption (ton) Fish waste production (ton) Wastewater discharge (m3) 6300 110000 75 600 6300 Value per ton of processed sardine 4.2 74 0.05 0.4 4.2 MAXIMUM VALUES THE WASTEWATER IMPACT Parameter Volume (m3/year) Volume (m3/ton of processed sardine) COD (mg O2/l) BOD5 (mg O2/l) Nitrogen (mg N/l) Phosphorous (mg P/l) (Portuguese Legislation) Value 6300 4.2 7700 3500 200 27 COD 150 mg O2/l BOD5 40 mg O2/l Nitrogen 15 mg N/l Phosphorous 10 mg P/l ETIV - EMAS Technical Implementation and Verification33 33 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL ASPECTS WITH A SIGNIFICANT IMPACT (CCC) 4.2 m3 WATER 74 kWh ELECTRICITY 1 TON FRESH SARDINE 4.2 m3 WASTEWATER COD: 32 kg BOD5: 15 kg Nitrogen: 1 kg Phosphorous: 0.1 kg CCC 0.4 TON FISH WASTE 0.05 TON FUEL 0.5 TON CANNED FISH ETIV - EMAS Technical Implementation and Verification34 34 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL LEGAL REQUIREMENTS (CCC AND XPTO) THE COMPANY HAS TO ESTABLISH AND MAINTAIN A PROCEDURE ENABLING: http://dre.pt/ ACCESS TO ALL LEGAL REQUIREMENTS AND OTHERS SELECTION OF APPLICABLE LEGAL REQUIREMENTS AMONG LEGISLATION AN UPDATED KNOWLEDGE OF THE WHOLE LEGAL FRAME NEW LAWS OLD LAWS ETIV - EMAS Technical Implementation and Verification35 35 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL OBJECTIVES AND TARGETS (XPTO) OBJECTIVES: REDUCTION OF WATER CONSUMPTION REDUCTION OF ELECTRICAL ENERGY CONSUMPTION REGULAR MONITORING OF WATER AND ENERGY CONSUMPTIONS REDUCTION OF COD AND BOD5 LEVELS IN THE GLAZING WASTEWATER REDUCTION OF COMMON GARBAGE PRODUCTION BUT, HOW MUCH? AND WHEN? TARGETS: 1 3 m3 OF WATER CONSUMPTION PER TON OF PROCESSED HAKE (END 2005) 2 3 750 kWh OF ELECTRICAL ENERGY CONSUMPTION PER TON OF PROCESSED HAKE (END 2005) 4 COD < 380 mg O2/l AND BOD5 < 100 mg O2/l IN THE GLAZING WASTEWATER (END 2005) 5 0.20 m3 OF COMMON GARBAGE PRODUCTION PER TON OF PROCESSED HAKE (END 2005) REGULAR REGISTER OF WATER AND ELECTRICAL ENERGY CONSUMPTIONS (END 2005) ETIV - EMAS Technical Implementation and Verification36 36 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL OBJECTIVES AND TARGETS (CCC) OBJECTIVES: REDUCTION OF WATER CONSUMPTION REDUCTION OF ELECTRICAL ENERGY CONSUMPTION REGULAR MONITORING OF WATER AND ENERGY CONSUMPTIONS UTILIZATION OF NATURAL GAS INSTEAD OF FUEL OIL REDUCTION OF COD, BOD5, N AND P LEVELS IN THE WASTEWATER UTILIZATION OF FISH WASTE FOR FISH MEAL PRODUCTION ONCE MORE, HOW MUCH? AND WHEN? TARGETS: 1 3.4 m3 OF WATER CONSUMPTION PER TON OF PROCESSED SARDINE (END 2005) 2 65 kWh OF ELECTRICAL ENERGY CONSUMPTION PER TON OF PROCESSED SARDINE (END 2005) 3 REGULAR REGISTER OF WATER AND ELECTRICAL ENERGY CONSUMPTIONS (END 2005) 4 EXCLUSIVE UTILIZATION OF NATURAL GAS IN THE BOILER (2006) 5 WASTEWATER (END 2005): COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, 100 mg N/l AND 15 mg P/l 6 SELLING ALL SARDINE WASTE TO A FISH MEAL PLANT (END 2005) ETIV - EMAS Technical Implementation and Verification37 37 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL PROGRAMME FOR XPTO - EP XPTO-AA EP XPTO-AA ESTABLISHES WHICH MEASURES MUST BE TAKEN IN ORDER TO MEET XPTO’S TARGETS: 1 3 2 m3 Water/ton 750 kWh/ton HIGH PRESSURE CLEANING SYSTEMS EFFICIENT CLEANING PRACTICES PRE-SOAK FLOORS AND EQUIPMENT VACUUM HOSES FOR FISH CLEANING REPORT AND FIX LEAKS PROMPTLY INSULATION IMPROVEMENT REGULAR EQUIPMENT MAINTENANCE ELECTRICITY-SAVING SENSORS 3 4 Regular Register WATER METERS INSTALLATION REGISTER ELECTRICITY CONSUMPTION FOR MAIN EQUIPMENTS 380 mg O2/l & 100 mg O2/l DRAINS WITH SCREENS AND TRAPS 5 0.2 m3 Garbage/ton SCREENING OF ALL COMMON GARBAGE ETIV - EMAS Technical Implementation and Verification38 38 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CHRONOGRAM FOR THE IMPLEMENTATION OF EP XPTO-AA PERFORMANCE PERIOD (MONTHS) TASK RESPONS. Set Oct Nov Dec Jan Feb Mar Apr May Jun Target 1: 3 m3 of water consumption per ton of processed hake until the end of 2005 Acquisition of high pressure cleaning systems EMS coordinator Training workers in efficient cleaning practices EMS coordinator Preparation of work instruction for pre-soakage cleaning EMS coordinator Installation of vacuum hoses for fish cleaning EMS coordinator Preparation of operational procedure for finding and fixing leaks EMS coordinator Day 15 Day 15 Day 31 Day 15 Day 30 Target 2: Electricity consumption lower than 750 kWh per ton of processed hake until the end of 2005 Commission better insulation of freezing rooms Assuring regular equipment maintenance Installation of energy saving sensors EMS coordinator Day 28 Production & Maintenance Day 15 EMS coordinator Day 15 Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005 Installation of meters on high water consumption equipment EMS coordinator Day 31 Preparation of operational procedure for registration of electricity consumption EMS coordinator Day 31 Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively Installation of screens and traps in the glazing tank drain EMS coordinator Day 31 ETIV - EMAS Technical Implementation and Verification39 39 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CHRONOGRAM FOR THE IMPLEMENTATION OF EP XPTO-AA PERFORMANCE PERIOD (MONTHS) TASK RESPONS. Set Oct Nov Dec Jan Feb Mar Apr May Jun Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively Preparation of work instruction for removal of the solid waste retained in the glazing tank drain EMS coordinator Day 31 Target 5: Common garbage production lower than 0.20 m3 per ton of processed hake until the end of 2005 Preparation of operational procedure for screening all common garbage produced EMS coordinator Training workers in separating all garbage produced EMS coordinator Raising workers awareness for environmental issues Day 30 Day 31 All EMS team ETIV - EMAS Technical Implementation and Verification40 40 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ENVIRONMENTAL PROGRAMME FOR CCC - EP CCC-AA EP CCC-AA ESTABLISHES WHICH MEASURES MUST BE TAKEN IN ORDER TO MEET CCC’S TARGETS: HIGH PRESSURE CLEANING SYSTEMS 1 3.4 m3 Water/ton EFFICIENT CLEANING PRACTICES 2 65 kWh/ton PRE-SOAK FLOORS AND EQUIPMENT FIXTURES FOR WATER CONTROL VACUUM HOSES FOR FISH CLEANING REPORT AND FIX LEAKS PROMPTLY REUSE THAWING WASTEWATERS INSULATION IMPROVEMENT REGULAR EQUIPMENT MAINTENANCE ELECTRICITY-SAVING SENSORS 3 Regular Register 4 Natural gas WATER METERS INSTALLATION REGISTER ELECTRICITY CONSUMPTION FOR MAIN EQUIPMENTS INSTALLATION OF A NATURAL GAS BOILER 5 3800 mg O2/l & 1700 mg O2/l 6 Sell sardine waste DRAINS WITH SCREENS AND TRAPS OFFAL COLLECTION IN SEPARATE CONTAINERS SOLID WASTE SEPARATION ON THE FISH PREPARATION TABLES ETIV - EMAS Technical Implementation and Verification41 41 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CHRONOGRAM FOR THE IMPLEMENTATION OF EP CCC-AA PERFORMANCE PERIOD (MONTHS) TASK RESPONS. Set Oct Nov Dec Jan Feb Mar Apr May Jun Target 1: 3.4 m3 of water consumption per ton of processed sardine until the end of 2005 Acquisition of high pressure cleaning systems EMS coordinator Training workers in efficient cleaning practices EMS coordinator Preparation of work instruction for pre-soakage cleaning EMS coordinator Installation of fixtures for water flow control EMS coordinator Installation of vacuum hoses for fish cleaning EMS coordinator Preparation of operational procedure for finding and fixing leaks EMS coordinator Preparation of work instruction for collecting thawing wastewaters and use them in cleaning EMS coordinator Day 15 Day 31 Day 31 Day 15 Day 30 Day 30 Day 31 Target 2: Electricity consumption of about 65 kWh per ton of processed sardine until the end of 2005 Commission better insulation of freezing rooms Assuring regular equipment maintenance Installation of energy saving sensors EMS coordinator Day 28 Production & Maintenance Day 15 EMS coordinator Day 15 Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005 Installation of meters on high water consumption equipment EMS coordinator Day 31 Preparation of operational procedure for registration of electricity consumption EMS coordinator Day 31 ETIV - EMAS Technical Implementation and Verification42 42 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CHRONOGRAM FOR THE IMPLEMENTATION OF EP CCC-AA PERFORMANCE PERIOD (MONTHS) TASK RESPONS. Set Oct Nov Dec Jan Feb Mar Apr May Jun Target 4: Exclusive utilization of natural gas in the boiler from 2006 onwards Acquisition of a natural gas boiler Production & Maintenance Installation of a natural gas line Production & Maintenance Day 31 Day 30 Target 5: Until the end of 2005, achieving: COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, Nit. - 100 mg N/l and Phosp. - 15 mg P/l Installation of screens and traps in the drains EMS coordinator Day 31 Preparation of work instruction for removal of the solid waste retained in the drains EMS coordinator Day 31 Acquisition of specific containers for blood and offal collection EMS coordinator Day 15 Preparation of work instruction for collecting blood and offal EMS coordinator Day 15 Target 6: Selling all sardine waste to a fish meal plant from 2005 onwards Preparation of operational procedure for separating waste on the fish preparation tables EMS coordinator Day 28 Making a deal with a company that produces fish meal from fish waste EMS coordinator Day 28 Raising workers awareness for environmental issues All EMS team ETIV - EMAS Technical Implementation and Verification43 43 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ORGANIZATION AND PERSONNEL: ESSENTIAL COMPONENTS OF EMAS RESPONSIBILITIES DIFFICULTIES: Discussion for the assignment of responsibilities DIFFICULTIES: TRAINING Changing old practices that are deleterious for the environment Raising environmental awareness COMMUNICATION DIFFICULTIES: DOCUMENTATION Organization of the documentation structure Writing down every detail of the operational procedures DOCUMENTATION CONTROL DIFFICULTIES: OPERATIONAL CONTROL Identification of operational controls for every target Convincing suppliers and contractors to comply with all environmental requirements PREVENTION AND EMERGENCY PREPAREDNESS DIFFICULTIES: Testing the plans for emergency response ETIV - EMAS Technical Implementation and Verification44 44 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY RESPONSIBILITIES - ORGANIZATIONAL STRUCTURE CONCERNING EMS ADMINISTRATION Mr. A QUALITY CONTROL Mr. B ADMINISTRATIVE SERVICES FINANCIAL DEPARTMENT Mr. C WAREHOUSE Mr. D PRODUCTION AND MAINTENANCE Mr. E ETIV - EMAS Technical Implementation and Verification45 45 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY SECTION RESPONSIBILITIES IN THE EMAS IMPLEMENTATION EMS Requirements 1- Policy 2- Environmental aspects 3- Environmental legislation 4- Objectives and targets 5- Environmental programme 6- Responsibilities 7- Training 8- Communication 9- EMS documentation 10- Document control 11- Operational control 12- Emergency plan 13- Monitoring 14- Non-conformances 15- Registers 16- EMS audits 17- EMS review Sections Adm. Adm./Fin. P&M Warehouse QC R C C C S S S R S R C C C C C C C C C C C C R R R C C C C C C C C C S R R R R S R C R R S S S R R R C C S S R TABLE KEY: Adm. – Administration Fin. – Finance P & M – Production and Maintenance QC – Quality Control R - Responsible C - Cooperation S - Supervision ETIV - EMAS Technical Implementation and Verification46 46 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY RESPONSIBILITIES - COMPOSITION OF THE EMS TEAM QUALITY CONTROL Mr. B ADMINISTRATIVE SERVICES WAREHOUSE Mr. C Mr. D PRODUCTION AND MAINTENANCE Mr. E ETIV - EMAS Technical Implementation and Verification47 47 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY TRAINING ALL EMPLOYEES RAISING ENVIRONMENTAL AWARENESS SPECIALIST ENVIRONMENTAL TRAINING EMPLOYEES RESPONSIBLE FOR A SIGNIFICANT ENVIRONMENTAL IMPACT EMS COURSE EMPLOYEES RESPONSIBLE FOR SOME PART OF THE EMS ETIV - EMAS Technical Implementation and Verification48 48 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY COMMUNICATION EXTERNAL COMMUNICATION DIRECT CONTACTS WRITTEN REPLY INTERNAL COMMUNICATION MANAGEMENT SPECIFIC FORM RNW# - Non-Written Communication FEEDBACK PHONE CALLS ENVIRONMENTAL POLICY, OBJECTIVES AND TARGETS INFORMS VISITS WRITTEN REPLY SPECIAL RECORD RCOMP# - Complaints COMPLAINTS ALL EMPLOYEES WRITTEN ANSWER ANALYSIS OF THE COMPLAINTS ETIV - EMAS Technical Implementation and Verification49 49 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY HIERARCHICAL DOCUMENTATION STRUCTURE OF EMS THE MOST IMPORTANT DOCUMENT FOR EMS: EMS AND ALL PROCEDURES ARE PRESENTED SYSTEM MANUAL ACTIVITIES THAT MUST BE CARRIED OUT FOR A THOROUGH IMPLEMENTATION OF EMS SYSTEM PROCEDURES SET OPERATIONAL CRITERIA THAT ENABLE AN EFFICIENT CONTROL FOR INSTANCE: RTRAIN#, RNW# or RCOMP# OPERATIONAL PROCEDURES EFFECTIVE EMS IMPLEMENTATION RECORDS OTHER DOCUMENTS EXTERNAL DOCUMENTS ETIV - EMAS Technical Implementation and Verification50 50 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY DOCUMENTATION – SYSTEM PROCEDURES (XPTO AND CCC) THE SYSTEM PROCEDURES ANSWER TO VARIOUS PROBLEMS: Operational control of the most meaningful aspects Requirements concerning measurement and monitoring of all operational controls Evaluation of conformance with legislation and relevant norms Procedure SP 00 – Procedures Preparation SP 01 – Environmental Aspects SP 02 – Legislation and other Requirements SP 03 – Training and Knowledge SP 04 – Internal and External Communication SP 05 – Documentation Control SP 06 – Operational Control – Operations and Activities SP 07 – Operational Control – Goods and Services SP 08 – Emergency Preparedness and Response SP 09 – Monitoring and Measurement SP 10 – Non-Conformances and Corrective and Preventive Actions SP 11 - Records SP 12 – EMS Audits Objective Preparation of procedures Identification and evaluation of environmental aspects Identification and access to legislation and other requirements Identification and execution of training and knowledge actions Internal and external documentation Control of documents Identification and control of all operations and activities with environmental impact Identification and control of goods and services with environmental impact Identification and preparation of response procedures for accidents and emergencies Identification and control of monitoring and measurement operations Non-conformances record and response Control of records Execution and calendar of internal audits ETIV - EMAS Technical Implementation and Verification51 51 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY DOCUMENTATION CONTROL OBJECTIVES ANALYSIS, REVIEW LOCALIZATION IF NECESSARY, APPROVAL BY AUTHORIZED PERSONNEL Opera AVAILABILITY OF ALL RELEVANT DOCUMENTS IN THE CRITICAL POINTS IMMEDIATE REMOVAL OF THE OBSOLETE DOCUMENTS FROM ALL UTILIZATION POINTS LATEST VERSION IDENTIFICATION OF ALL OBSOLETE DOCUMENTS OBSOLETE OBSOLETE ETIV - EMAS Technical Implementation and Verification52 52 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY OPERATIONAL CONTROL OPERATIONAL CONTROL ENCOMPASSES THE WAY XPTO (CCC) CONTROLS ITS OPERATIONS IN ORDER TO ASSURE: THE SYSTEMATIC ACCOMPLISHMENT OF THE ENVIRONMENTAL OBJECTIVES AND TARGETS THE ADEQUATE MONITORING OF ALL ENVIRONMENTAL ASPECTS ADDITIONALLY, OPERATIONAL CONTROL MUST FOLLOW SOME RULES: IDENTIFY, AT LEAST, ONE OPERATIONAL CONTROL FOR EACH OBJECTIVE AND TARGET CONTROL ALL OPERATIONS CONNECTED WITH THE ENVIRONMENTAL ASPECTS ESTABLISH PROCEDURES FOR ALL CRITICAL POINTS COMMUNICATE THE RELEVANT PROCEDURES TO SUPPLIERS AND CONTRACTORS ETIV - EMAS Technical Implementation and Verification53 53 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTED OPERATIONAL CONTROLS FOR EACH TARGET (XPTO) VERIFY MONTHLY WATER CONSUMPTION 1 3 m3 AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH Water/ton VERIFY MONTHLY ELECTRICITY CONSUMPTION 2 750 kWh/ton 3 AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH Regular Register MANAGEMENT REVIEW EACH TRIMESTER PERFORM MONTHLY CHEMICAL 4 380 mg O2/l & 100 mg O2/l 5 0.2 m3 ANALYSIS OF THE GLAZING WASTEWATER ESTIMATE MONTHLY PRODUCTION OF Garbage/ton COMMON GARBAGE AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH ETIV - EMAS Technical Implementation and Verification54 54 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY OPERATIONAL CONTROL CONCERNING XPTO’S TARGET 5 Number of dumpsters filled each month Garbage production per ton of processed hake Amount of hake processed each month ETIV - EMAS Technical Implementation and Verification55 55 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY IMPLEMENTED OPERATIONAL CONTROLS FOR EACH TARGET (CCC) 1 3.4 m3 Water/ton VERIFY MONTHLY WATER CONSUMPTION AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH VERIFY MONTHLY ELECTRICITY CONSUMPTION 2 65 kWh/ton 3 Regular Register 4 Natural gas AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH MANAGEMENT REVIEW EACH TRIMESTER MANAGEMENT REVIEW EACH TRIMESTER MONTHLY CHEMICAL ANALYSIS 5 3800 mg O2/l & 1700 mg O2/l OF THE WASTEWATER GENERATED IN THE PLANT ESTIMATE MONTHLY AMOUNT OF SEPARATED FISH 6 Sell sardine waste WASTE AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH MANAGEMENT REVIEW EACH TRIMESTER ETIV - EMAS Technical Implementation and Verification56 56 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY OPERATIONAL CONTROL CONCERNING CCC’S TARGET 6 Quantity of fish waste separated on the heading and eviscerating tables Separated sardine waste per ton of processed sardine Amount of sardine processed each month X ton/ton of processed sardine COMPARISON Total sardine waste per ton of processed sardine 0.4 ton/ton of processed sardine ETIV - EMAS Technical Implementation and Verification57 57 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PREVENTION AND EMERGENCY PREPAREDNESS THE COMPANY MUST: ESTABLISH AND KEEP PROCEDURES ENABLING THE IDENTIFICATION OF POSSIBLE ACCIDENTS AND EMERGENCY SITUATIONS EX.: FIRES, ACCIDENTAL RELEASES, SPILLS, ETC. •BE PREPARED TO PREVENT AND REDUCE ALL CONNECTED ENVIRONMENTAL IMPACTS FOR EACH IDENTIFIED SITUATION MUST BE DEVELOPED A PLAN FOR EMERGENCY RESPONSE (PER# - TYPE OF SITUATION) REFERRING: IMMEDIATE RESPONSE ACTIONS WHO TO CALL WHICH AUTHORITIES MUST BE INFORMED ETIV - EMAS Technical Implementation and Verification58 58 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY OPERATION: CONTROL AND GUARANTEES OF EMAS APPLICATION MONITORING AND MEASUREMENT DIFFICULTIES: Identification of monitoring and measurement actions Training employees to carry out these actions NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS DIFFICULTIES: Detection of non-conformances Discussion of the corrective and preventive actions ENVIRONMENTAL RECORDS DIFFICULTIES: INTERNAL AUDITS Finding external professional consultants to perform the audits Collecting meaningful data Preparation of the audit’s report ETIV - EMAS Technical Implementation and Verification59 59 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY MONITORING AND MEASUREMENT (M&M) MONITORING AND MEASUREMENT ACTIONS ARE ESSENTIAL FOR AN ADEQUATE CONTROL OF ALL CRITICAL POINTS ADEQUATE DOCUMENTATION IS CRUCIAL: SYSTEM PROCEDURE, SP 09 – Monitoring and Measurement LISTS OF OPERATIONS AND MEASUREMENT EQUIPMENTS DOCUMENTS RECORDING ALL MAINTENANCE AND CALIBRATION OPERATIONS PERFORMED IN THE EQUIPMENTS MONITORING AND MEASUREMENT ACTIONS TYPICALLY INVOLVE: CALIBRATION OF THE MEASUREMENT DEVICES RECORDING THE VALUES ATTAINED IN EVERY OPERATIONAL CONTROL COMPARISON WITH ESTABLISHED TARGETS ETIV - EMAS Technical Implementation and Verification60 60 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY M&M ACTIONS FOR EACH OPERATIONAL CONTROL (XPTO) Operational control M & M action - Verify monthly water consumption and calculate the amount of hake processed each month (Target 1) - Calibration of w ater meters and scales - Record monthly value of w ater consumption per ton of processed hake - Comparison w ith estab lished target - Verify monthly electricity consumption and calculate the amount of hake processed each month (Target 2) - Calibration of electricity meters and scales - Record monthly value of electrical energy consumption per ton of processed hake - Comparison w ith established target - Management review each trimester (Target 3) - Record phase of the project - Record delays to the schedule (chronogram) - Report to the management board - Perform chemical analysis of the glazing wastewater every month (Target 4) - Record monthly values of COD and BOD 5 in the glazing w astew ater - Comparison w ith established targets - Estimate monthly production of common garbage and calculate the amount of hake processed each month (Target 5) - Monitoring common garbage di sposal and calibrating scales - Record monthly value of common garbage production per ton of processed hake - Comparison w ith established target ETIV - EMAS Technical Implementation and Verification61 61 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY MONITORING AND MEASUREMENT ACTIONS (XPTO’S TARGET 5) MONITORING COMMON GARBAGE DISPOSAL CALIBRATION OF THE SCALES Measurement of the volumetric capacity Work instruction for determining the number of dumpsters filled each month 2 kg ENABLES 1 kg 0.5 kg ENABLES RECORD MONTHLY VALUE OF COMMON GARBAGE PRODUCTION PER TON OF PROCESSED HAKE ENABLES COMPARISON WITH ESTABLISHED TARGET ETIV - EMAS Technical Implementation and Verification62 62 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY M&M ACTIONS FOR EACH OPERATIONAL CONTROL (CCC) Operational control M & M action - Verify monthly water consumption and calculate the amount of sardine processed each month (Target 1) - Calibration of w ater meters and scales - Record monthly value of w ater consumption per ton of processed sardine - Comparison w ith established target - Verify monthly electricity consumption and calculate the amount of sardine processed each month (Target 2) - Calibration of electricity meters and scales - Record monthly value of electrical energy consumption per ton of processed sardine - Comparison w ith established target - Management review each trimester (Target 3) - Record phase of the project - Record delays to the schedule (chronogram) - Report to the management board - Management review each trimester (Target 4) - Record phase of the project - Record delays to the schedule (chronogra m) - Report to the management board - Monthly chemical analysis of the wastewater generated in the plant (Target 5) - Record monthly values of COD, BOD 5 , Nitrogen and Phosphorous in the w astew ater - Comparison w ith established targets - Estimate monthly amount of fish waste separated on the fish preparation tables and calculate the quantity of sardine processed each month (Target 6) - Calibration of scales - Record monthly value of separated fish w aste per ton of processed sardine - Comparison w ith establ ished target - Management review each trimester (Target 6) - Record phase of the project - Record delays to the schedule (chronogram) - Report to the management board ETIV - EMAS Technical Implementation and Verification63 63 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY MONITORING AND MEASUREMENT ACTIONS (CCC’S TARGET 6) CALIBRATION OF THE SCALES 2 kg 1 kg RECORD PHASE OF THE PROJECT For instance, the second task of target 6 0.5 kg Negotiations ENABLES RECORD MONTHLY VALUE OF SEPARATED FISH WASTE PER TON OF PROCESSED SARDINE Fish Waste FISH MEAL PLANT CCC ENABLES € COMPARISON WITH ESTABLISHED TARGET € € RECORD DELAYS TO THE SCHEDULE REPORT TO THE MANAGEMENT BOARD ETIV - EMAS Technical Implementation and Verification64 64 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS WHAT IS A NON-CONFORMANCE? ASPECT OF EMAS IMPLEMENTATION STANDING BEYOND THE ACCEPTANCE CRITERIA WHAT IS A CORRECTIVE ACTION? ACTION THAT AIMS AT REESTABLISHING THE CONCERNED ASPECT WITHIN LIMITS WHAT IS A PREVENTIVE ACTION? ACTION THAT AIMS TO AVOID ANY SERIOUS DEVIATION IN SOME ASPECT OF EMAS IMPLEMENTATION IN XPTO AND CCC, THE DETECTION OF NON-CONFORMANCES RESULTED FROM COMPLAINTS, EMERGENCY SITUATIONS, AUDITS AND ALL M&M ACTIONS FOR EVERY DETECTED NON-CONFORMANCE A SPECIFIC DOCUMENT MUST BE FILLED OUT RNC# - NON-CONFORMANCES AND MUST CONTAIN THE FOLLOWING INFORMATION: SECTION WHERE THE NON-CONFORMANCE OCCURRED REQUIREMENT OF THE NORM THAT WAS DISRESPECTED DESCRIPTION OF THE NON-CONFORMANCE CORRECTIVE AND PREVENTIVE ACTIONS PERFORMED ALTERED DOCUMENTS ETIV - EMAS Technical Implementation and Verification65 65 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY NON-CONFORMANCES/CORRECTIVE & PREVENTIVE ACTIONS (XPTO) PREVENTIVE ACTION Put a specific person in charge of all training actions Explain to workers the documents importance NON-CONFORMANCES NO SPECIALIST ENVIRONMENTAL TRAINING PROVIDED FOR THOSE WORKERS WHOSE ACTIVITY HAD A SIGNIFICANT ENVIRONMENTAL IMPACT TWO LISTS (LINTC AND LEXTC) WERE NOT FILLED OUT CORRECTIVE ACTION Commission external environmental experts Fill out the lists with the missing information Report any serious problem in the installation of new equipments to EMS team DELAY IN THE INSTALLATION OF VACUUM HOSES Ask advice from other experts Teach workers to remove the solid waste retained in the drain of the glazing tank COD AND BOD5 LEVELS DID NOT DECREASE Reinstall the drain’s screen Improve workers training for common garbage separation INCREASE IN THE PRODUCTION OF COMMON GARBAGE PER TON OF PROCESSED HAKE Appointment of a person for workers supervision in screening the garbage ETIV - EMAS Technical Implementation and Verification66 66 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY NON-CONFORMANCES/CORRECTIVE & PREVENTIVE ACTIONS (CCC) PREVENTIVE ACTION Put a specific person in charge of all training actions NON-CONFORMANCES NO SPECIALIST ENVIRONMENTAL TRAINING PROVIDED FOR THOSE WORKERS WHOSE ACTIVITY HAD A SIGNIFICANT ENVIRONMENTAL IMPACT Reinforce workers training for collecting offal THE ORGANIC LOAD IN THE WASTEWATER DID NOT DECREASE Regular EMAS meetings for analysis of all operational procedures ABSENCE OF THE OPERATIONAL PROCEDURE FOR SEPARATING SOLID WASTE CORRECTIVE ACTION Commission external environmental experts Appointment of a person for supervising workers when they collect offal Special EMAS meeting for preparing the procedure ETIV - EMAS Technical Implementation and Verification67 67 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY SYSTEM OF ENVIRONMENTAL RECORDS APPLIED TO XPTO AND CCC RECORDS: ESTABLISHED FOLDERS: ELIMINATION: AFTER: ENVIRONMENTAL REVIEW TO BE DEFINED OBJECTIVES AND TARGETS TO BE DEFINED ENVIRONMENTAL PROGRAMME TO BE DEFINED RESPONSIBILITIES TO BE DEFINED TRAINING 2 YEARS COMMUNICATION 3 YEARS DOCUMENTATION CONTROL 5 YEARS TO BE DEFINED AUDITS RESULTS OPERATIONAL CONTROL PREVENTION AND EMERGENCY PREPAREDNESS MONITORING AND MEASUREMENT NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS INTERNAL AUDITS REVIEW RESULTS MANAGEMENT REVIEWS 3 YEARS ENVIRONMENTAL STATEMENTS 3 YEARS REVIEW RESULTS DEFINITION OF OBJECTIVES & TARGETS ENVIRONMENTAL PLAN (chronograms) DEFINITION OF RESPONSIBILITIES TRAINING RECORDS COMMUNICATION LISTS AND RECORDS LISTS OF DOC. REMOVED, MODIFIED, etc. LISTS OF WORK INSTRUCTIONS EMERGENCY PLANS AND RECORDS LISTS, MAINT. & CALIB. RECORDS NON-CONFORMANCES RECORDS ENVIRONMENTAL STATEMENTS ETIV - EMAS Technical Implementation and Verification68 5 YEARS 5 YEARS 5 YEARS 3 YEARS 68 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY INTERNAL AUDITS (IA) WHY INTERNAL AUDITS HAVE TO BE PERFORMED? TO OBSERVE WHETHER EMS AGREES WITH THE ENVIRONMENTAL PROGRAMME TO VERIFY A CORRECT IMPLEMENTATION OF THE SYSTEM TO PROVIDE INFORMATION FOR THE MANAGEMENT REVIEW THE EXECUTION OF AN INTERNAL AUDIT REQUIRES: PROGRAMME – SPECIFIES WHICH ACTIVITIES MUST BE AUDITED PROCEDURES – SPECIFY THE AUDITS SCOPE AND FREQUENCY, THE MANAGEMENT RESPONSIBILITIES AND ALSO THE METHODOLOGICAL ISSUES IA INTERNAL AUDIT EACH INTERNAL AUDIT SIMULTANEOUSLY ENCOMPASSES ALL RELEVANT ACTIVITIES XPTO (CCC) IA AUDIT CYCLE TIME 1 YEAR ETIV - EMAS Technical Implementation and Verification69 69 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY INTERNAL AUDITS THE PREPARATION OF THE INTERNAL AUDITS REQUIRED AN AUDIT’S PLAN: Issue Content Objectives Verification of compliance with EMAS norm and the environmental objectives and targets Criteria EMAS requirements Application areas Production & Quality Control, Warehouse & Offices, Auxiliary Operations, Canteen, Env. Records and EMS documents Calendar Preparation – two months Inspection – six months Report preparation and presentation – four months Functions and responsibilities Specific tasks assigned to the members of the audit’s team Resources localization Where to find the main documents and devices required for measurements and other inspection activities in the critical areas Company’s representatives EMS team members Report’s issues Audit’s objectives; application areas; company's name; audited processes; client’s identification; audit’s team identification; dates and places of the audits activities; criteria; audit’s results and conclusions Logistics The planning of all visits and inspection tasks Confidential issues List of the company’s areas that must receive special care regarding divulgation Future audit’s actions Issues that raised some doubts or problems must be followed in the future ETIV - EMAS Technical Implementation and Verification70 70 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY SUMMARY OF THE AUDIT’S RESULTS FOR XPTO THE PRODUCTION OF COMMON GARBAGE PER TON OF PROCESSED HAKE DID NOT DECREASE BESIDES THE GLAZING WASTEWATER, THERE ARE OTHER OPERATIONS THAT GENERATE WASTEWATER WHICH MUST BE ANALYZED THE MAINTENANCE AND CALIBRATION ACTIVITIES ARE NOT CORRECTLY REGISTERED Error THE RESPONSIBILITIES STRUCTURE IS UNBALANCED (EXCESSIVE NUMBER OF TASKS ASSIGNED TO EMS COORDINATOR) ? ABSENCE OF ADEQUATE ENVIRONMENTAL TRAINING FOR ALL WORKERS ETIV - EMAS Technical Implementation and Verification71 71 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY SUMMARY OF THE AUDIT’S RESULTS FOR CCC THE ORGANIC LOAD IN THE WASTEWATER DID NOT DECREASE COD BOD5 !!!!! THE MONITORING OF THE FISH WASTE SEPARATION DOES NOT COMPRISE OTHER PROCESS OPERATIONS BESIDES HEADING AND EVISCERATING LMD? THE LIST OF MODIFIED DOCUMENTS IS MISSING THE RESPONSIBILITIES STRUCTURE IS UNBALANCED (EXCESSIVE NUMBER OF TASKS ASSIGNED TO EMS COORDINATOR) ? ABSENCE OF ADEQUATE ENVIRONMENTAL TRAINING FOR ALL WORKERS ETIV - EMAS Technical Implementation and Verification72 72 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY VALIDATION AND VERIFICATION OF EMAS BY EXTERNAL ENTITIES DIFFICULTIES: MANAGEMENT REVIEW Time availability Reaching conclusions PUBLIC COMMUNICATION DIFFICULTIES: Preparation of an accurate and clear environmental statement DIFFICULTIES: VALIDATION, VERIFICATION AND RECORDS Finding an independent environmental verifier Financial costs Application for registration under EMAS ORGANIZATION REGISTERED UNDER EMAS ETIV - EMAS Technical Implementation and Verification73 73 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY MANAGEMENT REVIEW WHAT IS IT? THE MANAGEMENT MUST REVIEW THE IMPLEMENTED EMS, THUS, ENSURING THAT IT REMAINS ADEQUATE, SUFFICIENT AND EFFECTIVE FURTHERMORE, THE MANAGEMENT REVIEW HAS TO CONSIDER: POSSIBLE ALTERATIONS OF ENVIRONMENTAL POLICY, OBJECTIVES AND TARGETS (AS A RESULT OF MODIFIED CIRCUMSTANCES) A THOROUGH ANALYSIS OF THE INTERNAL AUDIT’S RESULTS FOR XPTO AND CCC, THE REVIEW IS PERFORMED IN A MEETING THAT IS HELD EVERY YEAR ALL DISCUSSED ISSUES ARE RECORDED IN THE REVIEW MINUTES ETIV - EMAS Technical Implementation and Verification74 74 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CONCLUSIONS OF THE FIRST MANAGEMENT REVIEW MADE BY XPTO ALL GENERATED WASTEWATERS SHOULD BE REGULARLY ANALYZED Jan Apr Jul Oct Feb May Aug Nov Mar Jun Sep Dec COD BOD5 THE COMPANY SHOULD SEARCH FOR NEW CLEAN TECHNOLOGIES (FOR INSTANCE FIXTURES THAT RESTRICT WATER FLOW FOR CLEANING) A COMPLETE AND DETAILED TRAINING PROGRAMME SHOULD BE DEVELOPED EMS TEAM MEMBERS SHOULD ENTER EMS COURSES RESPONSIBILITIES FOR EMS SHOULD BE SPLIT MORE EVENLY AMONG EMS TEAM MEMBERS ETIV - EMAS Technical Implementation and Verification75 75 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY CONCLUSIONS OF THE FIRST MANAGEMENT REVIEW MADE BY CCC GAS EMISSIONS FROM BOILER SHOULD BE MONITORED ON REGULAR BASIS 753 THE COMPANY SHOULD SEARCH FOR NEW CLEAN TECHNOLOGIES (FOR INSTANCE FIXTURES THAT RESTRICT WATER FLOW FOR CLEANING) A COMPLETE AND DETAILED TRAINING PROGRAMME SHOULD BE DEVELOPED EMS TEAM MEMBERS SHOULD ENTER EMS COURSES RESPONSIBILITIES FOR EMS SHOULD BE SPLIT MORE EVENLY AMONG EMS TEAM MEMBERS ETIV - EMAS Technical Implementation and Verification76 76 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY PUBLIC COMMUNICATION EMAS REQUIRES THE PRESENTATION OF AN ENVIRONMENTAL STATEMENT SUMMARY OF THE ENVIRONMENTAL STATEMENTS PREPARED BY XPTO AND CCC: XPTO CCC Company’s description Environmental policy Environmental aspects Objectives and targets Env. Performance indicators (October 2004): Water consumption – 3.5 m3/ton§ § Electricity consumption - 790 kWh/ton Company’s description Environmental policy Environmental aspects Objectives and targets Env. Performance indicators (October 2004): Water consumption – 4.0 m3/ton¶ ¶ Electricity consumption – 73 kWh/ton Common garbage production – 0.3 m3/ton§ 3 § Wastewater discharge – 3.5 m /ton COD (glazing wastewater) – 400 mg O2/l BOD5 (glazing wastewater) – 100 mg O2/l Environmental verifier: Name - VVV Accreditation number - ##### Validation date - ##/##/## Fuel oil consumption – 0.05 ton/ton¶ ¶ Fish waste production – 0.4 ton/ton 3 ¶ Wastewater discharge – 4.0 m /ton COD (wastewater) – 7700 mg O2/l BOD5 (wastewater) – 3500 mg O2/l Nitrogen (wastewater) – 200 mg N/l Phosphorous (wastewater) - 27 mg P/l Environmental verifier: Name - VVV Accreditation number - ##### Validation date - ##/##/## § Ton of processed hake ¶ Ton of processed sardine ETIV - EMAS Technical Implementation and Verification77 77 EMAS APPLICATION IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY VALIDATION, VERIFICATION AND RECORDS HOW TO ATTAIN REGISTRATION UNDER EMAS? SEVERAL STEPS HAD TO BE TAKEN BY XPTO AND CCC: COMMISSION AN INDEPENDENT ENVIRONMENTAL VERIFIER (WHICH MUST UNDERTAKE A CAREFUL EXAMINATION OF THE EMAS IMPLEMENTATION) AS XPTO AND CCC FULLY COMPLIED WITH ALL EMAS REQUIREMENTS: VALIDATION WAS CONFERRED BY THE ENVIRONMENTAL VERIFIER XPTO AND CCC REQUESTED REGISTRATION UNDER EMAS SUBMISSION TO THE COMPETENT ORGANISM (INSTITUTO DO AMBIENTE) OF THE VALIDATED ENVIRONMENTAL STATEMENT AND A SPECIFIC FORM DULY FILLED IN PAYMENT OF A REGISTRATION FEE AFTER EVALUATION OF REQUEST, THE INSTITUTO DE AMBIENTE GRANTED REGISTRATION AS A RESULT OF THE REGISTRATION, XPTO AND CCC WERE ALLOWED TO USE THE EMAS LOGOTYPE (VERSION 1) ETIV - EMAS Technical Implementation and Verification78 78