Introduction & Up-date
20th August 2012
Contents
• The Background
• The Teams
• The Facilities
• Location & Layout
• The Planning
• Communications
• Your Input
The Background
• Current Campus Designed for Max Capacity of 1200 students
We are now c.1150 & growing
• Campus Master Plan - completed 2008
Find it on InsideASH>Search “Campus Master Plan”
Historically 5 small locations in & around The Hague
New Campus 20 years ago
MS “temporary” wing added 15 years ago
New ES Wing in 2003
• Purchased Land from Municiapality of Wassenaar for ECC
Boerderij (farm) Ter Weer (area name)
Located on small Deijlerweg, 5/7 minutes walk
Construction commenced early 2102
3
The Background
The key parties in the negotiations:
• Municapality of Wassenaar – owned the land
&
farmhouse “Boerderij Ter Weer”
• SJW Youth Club had clubhouse in the
Farmhouse - were already being re-located by
Gemeente
• Olympia ‘72 Handball Club will share sports
facilities
• ASH – now own land & buildings
4
Location & Layout
5
Location & Layout
6
The Planning
• Ground cleared & prepared late 2011/ early 2012
• Groundbreaking Ceremony took place 16th February
2012
• Handball fields complete (for new handball season)
• Construction drawings & foundation work completed
over the summer - passed a key risk phase
• Sport complex and Gym due for completion
end of December 2012
• Main ECC instructional areas doe for
completion July 2013.
• Currently on schedule – weather permitting
• Now: Fixtures & Fittings & Landcaping
7
The Teams
ASH
ECC Project Team
Tim Messick, Ton Ravensbergen, Rick Spradling, Hans
Carmiggelt, Lesley Murphy, Project Managers
(External)
ECC Design Team
Tim Messick, Fereshteh Dastani, Matthew Steuer, Ann Pleij
Carla Bruzual, Hans Carmiggelt, Project Managers
External
Project Manager – Themelion
Arjen Brandon, Marije Bierenbroodspot
Architect – Kraaijvanger Urbis
Hans Goverde
Landscape Architect – recently selected
8
Communications
Stakeholders
•
•
•
•
Staff
Parents
Students
Board of
Trustees
• Client
Companies
• Neighbors
• Municipality
• Media
How
Frequency
• Staff meetings
• Display units
• Flash & PTO
Bulletin articles
• InsideASH
• Website
• Newsletters
• Internal &
external
events
• Groundbreakin
g Ceremony
• Vist site
• Completion of
gymnasium
building
• landscaping
• Official
opening
• Project
meetings
• on-site
meetings
• design team
meetings
• PTO Bulletin
• Website updates
• 5 Newsletters
(2 more to be
completed)
• Information
evenings at
ASH & Ter
Weer
• Communicate
at all new
phases of the
project
• www.ash.nl/ec
c
9
Your Input
Thank you for you valuable input to date. We welcome your ideas
about any aspect of the project:
Contact a member of The Design Team or The Project Team
Watch out for up-dates on the website, InsideASH & PTO Bulletin
Check out the model in the main entrance
Get students involved
Direct non-staff members with inquiries to email: [email protected]
Let us know in advance when you would like to visit – we’ll pick
time slots per week - hard hats must be worn at all times on the
construction site.
10