Barksdale Alternative Water Supply Project Proposal

Download Report

Transcript Barksdale Alternative Water Supply Project Proposal

Former DuPont Barksdale Works
Project Update
August 3, 2005
DuPont Corporate Remediation Group
Great Lakes Visitors Center
Purpose of Presentation


Provide an update on alternative water supply
project.
Present a summary of other site work
conducted and planned in 2005.
August 3, 2005
Former DuPont Barksdale Works Project Update
2
DuPont Company Representatives

Brad Nave
–

Project Director, DuPont Corporate Remediation
Group (CRG)
Cary Pooler
–
August 3, 2005
Project Manager, URS Corporation
Former DuPont Barksdale Works Project Update
3
Alternative Water Supply Project
Brad Nave
Pipeline Construction Update
Alternative Water Supply

On June 17, 2005, the construction was
completed.
–
–
–
–
–
All pipeline mains have been completed (6.25
miles).
Last lateral was connected on June 17, 2005.
Forty-eight properties are anticipated to use water
in 2005.
Remaining eight properties may use water at a
future date.
Feedback from residents regarding water quality
and pressure has been very positive.
August 3, 2005
Former DuPont Barksdale Works Project Update
5
Pipeline Construction Update
Alternative Water Supply

Remaining restoration work for 2005:
–
–
–

Address engineering inspection items.
Minor property restoration (reseeding, driveway
patching, and grading).
Road repairs.
Well abandonment to commence in early
September.
–
Anticipate limited or no impact to currently
restored properties.
August 3, 2005
Former DuPont Barksdale Works Project Update
6
Pipeline Construction Update
Alternative Water Supply

Road repairs to be completed:
–
–
–
–
Minor shoulder work on HWY13 (address WIDOT inspection
items).
Nolander road restoration (to be managed by Barksdale
Township and paid by DuPont):
 Nolander from west of Bjork to pipeline end:
– Pulverization of existing roadway and rough grade.
– 4-in. thick supplemental crushed aggregate base.
– 3-in. thick Hot-mix asphalt pavement.
– Shoulder gravel.
 Nolander east of Bjork to HWY 13:
– 1 1/2-in. asphalt surface to be applied.
Bjork Road (reimburse Barksdale Township for gravel
added).
Birch Grove (additional shoulder work and minor paving).
August 3, 2005
Former DuPont Barksdale Works Project Update
7
Other Barksdale Site Work
Cary Pooler
2005 Residential Monitoring



Working with WDNR to develop a new
residential well monitoring program for homes
that lie directly south and east of the site that
are not connected to municipal water.
Sampling anticipated to begin in late August
or September, pending WDNR approval.
Proposed sampling frequency is biennial for a
5 year period.
August 3, 2005
Former DuPont Barksdale Works Project Update
9
August 3, 2005
Former DuPont Barksdale Works Project Update
10
Pipeline O&M




Project provides for management of
municipal supply for eligible properties.
To date, DuPont has paid over $83,000 in
bills and currently owes $1,100.
Several homeowners have exceeded the
allotted daily volume of 300 gallons. DuPont
will contact these homeowners to discuss
usage.
Average daily use for the 38 homes
connected to the system in 2Q05 was 100
gallons per household per day.
August 3, 2005
Former DuPont Barksdale Works Project Update
11
2005 Site Investigation Work

Conducted sediment and surface water sampling in
April 2005. September 2005 targeted as transmittal
date of the findings.
–

Preliminary results are consistent with previous sampling.
Field work for the southern area of the site is
complete, per WDNR approved work plan:
–
–
–
August 3, 2005
Samples were collected on a “grid” covering the entire
southern area, which was supplemented by biased samples
in former product storage areas and rail beds.
Approximately 680 locations were drilled to comprise
approximately 410 samples that were submitted for analysis.
Preliminary laboratory results will be reported to DuPont in
about 45 days.
Former DuPont Barksdale Works Project Update
12
Drainages sampled in April 2005
Acid Area
TNT/TNX
Area
TNT/DNT
Area
NG/
Dynamite
Area
Burning
Ground
NItramex /
Nitramon
August 3, 2005
Former DuPont Barksdale Works Project Update
13
Southern Area Sampling Grid
August 3, 2005
Former DuPont Barksdale Works Project Update
14
August 3, 2005
Former DuPont Barksdale Works Project Update
15
August 3, 2005
Former DuPont Barksdale Works Project Update
16
August 3, 2005
Former DuPont Barksdale Works Project Update
17
August 3, 2005
Former DuPont Barksdale Works Project Update
18
August 3, 2005
Former DuPont Barksdale Works Project Update
19
2005 Site Investigation Work (continued)


Continue to investigate former manufacturing
areas (via trenching and soil sampling).
Continue to monitor on-site groundwater
conditions.
August 3, 2005
Former DuPont Barksdale Works Project Update
20
GA Tech Research
Brad Nave
Site-related Research Work

Continuing Georgia Institute of Technology research
on destruction of DNT and TNT.
–
–
–
–
Study being conducted by Dr. Joe Hughes (Professor and
Chair of the Civil Engineering Dept. at Ga. Tech) and Dr. Jim
Spain.
Study initiated in early 2004 and is ongoing.
A portion of their research on TNT destruction is expected to
be published in the journal Environmental Science &
Technology within the next year.
Scaled-up DNT bioremediation project will be undertaken at
Georgia Tech facility.
August 3, 2005
Former DuPont Barksdale Works Project Update
22
Proposed Barksdale Soil Biodegradation
Pilot

Proposed pilot project is a simple set up with low
operation and maintenance requirements.
Methanol
(wood alcohol)
Water &
Nutrients
(phosphate,
magnesium, calcium,
iron)
DNT Biodegradation Reactor
Site Soils
Contaminated w/ DNT
(source of bacteria and DNT)
Denitrification Reactor
to Remove Nitrite
(bacteria from soils)
2 NO2-
N2 + CO2 + H2O
1 DNT
Buffer
(pH control)
August 3, 2005
Methanol
+
NO2Former DuPont Barksdale Works Project Update
23
August 3, 2005
Former DuPont Barksdale Works Project Update
24
August 3, 2005
Former DuPont Barksdale Works Project Update
25
August 3, 2005
Former DuPont Barksdale Works Project Update
26
August 3, 2005
Former DuPont Barksdale Works Project Update
27
Home Value Protection Program
Brad Nave
Home Value Protection Program



Four properties purchased to date. Two have
been resold. One home removed, but
property retained.
One additional property is being processed.
Home Value Protection Program will remain
in effect until six months after alternative
water is available.
–
–
August 3, 2005
Availability of the program will be the last calendar
day of August 2005 for most residents.
Written notification was made in February 2005 to
appropriate property owners.
Former DuPont Barksdale Works Project Update
29
Questions or comments?
August 3, 2005
Former DuPont Barksdale Works Project Update
30