Water/Wastewater System Life Cycle
Raw Water
Wells (12)
Consumptive
Use Permit (CUP)
Water
Treatment Plant
Storage Tanks
Lime Sludge
Water Distribution
System
Reclaimed Water
Irrigation
Homes /
Businesses
Collection System
Reuse
Lift Stations
Injection Wells
(2)
Wastewater Treatment
Plant (East/West)
Biosolids
Sewer Force Mains
CUP Credits
Raw Water Wells
(12)
CUP Allocation: 8.53 MGD
9.54 MGD
SFWMD
Large Users
(3 Golf Courses & 2 HOAs)
Reuse
(1.5 MGD)
CUP Allocation: 1.01 MGD
Why
Timeline of Events
2005:
• Florida Legislature Revised Ch. 373 F.S.; required
Regional Water Supply Plans
LAW / CODE
Section 373.0361(1), Florida Statutes (F.S.) provides:
The governing board of each water management district
shall conduct water supply planning for any water supply
planning region within the district identified in the appropriate
district water supply plan under Section 373.036, where it
determines that existing sources of water are not adequate to
supply water for all existing and future reasonable-beneficial
uses and to sustain the water resources and related natural
systems for the planning period.
2007:
• SFWMD Adopted Lower East Coast (LEC) Water
Supply Plan Update and the Water Availability
Rule
– Allocation limited to 2006 usage (8.53 MGD) - base
allocation
– Shortfall of 1.87 MGD within the planning period
(Year 2025)
– Implement LEC Water Supply Project (RO System @
$17M)
2007 Continued:
– Confirm within one year other Alternative
Water Supply (AWS) projects as substitute
for RO
– Annual Progress Reports
– 10-year Water Supply Facilities Work Plan
with the AWS Project
– Update City’s Comprehensive Plan
3. Your water supply entity must notify the District if it proposes to develop
other water supply development projects {Subsection 373.0361(7)(b), Florida
Statutes).
If your water supply entity does not intend to develop one or more of
the water supply development projects identified in Appendix A for your
water supply entity, it must:
• Propose to the District, within one year after receiving this notification,
other alternative water supply development projects sufficient to
address the projected water supply needs for your water supply
entity, as presented in the 2005-2006 Lower East Coast Water Supply
Plan Update.
• Provide an estimate of the quantity of water to be produced by the
project and the project's expected start and completion dates.
• Describe the status of the project's implementation, including:
o Financial planning.
o Facilities master planning.
o Permitting.
o Activities/efforts in coordinating or participating in
multijurisdictional projects, if applicable.
2007 - 2008:
• Completed AWS Alternatives Evaluation;
alternatives considered:
AWS Alternatives
Floridan RO
Recharge Via Canal Discharge
Recharge Via GW Injection
Reuse Plant @ WWTP/Irrigation
Reuse Plant @ Remote
Location/Irrigation
Cost
$19.0 million
$16.5 million
$17.5 million
$9.3 million
$14.3 million
2007 – 2008 Continued:
• Completed 10-Yr Water Supply Facilities Work
Plan
• Completed Rate Study with 10-Yr Financial
Forecast, as required, and incorporated into the
10-Yr Work Plan
• Adopted and implemented rate increase
(FY 2009-2012)
2007 – 2008 Continued:
• Amended the Comprehensive Plan to
incorporate the Work Plan
• Notified SFWMD of the City’s intent to develop
Reuse Plant
2009 - 2010:
• Project planning/design/negotiations with large
users (golf courses)
Project Status
Design complete for the Reuse Plant
• Received approvals from permitting agencies
• Confirmed (by e-mail) credit towards allocation
from SFWMD….awaiting written confirmation
• Bidding and construction permits….pending
60% Design complete for the piping to golf
courses
Agreements with three (3) golf courses in place
Project funding….budgeted in FY 13 (Source:
Water and Sewer Reserve)
Future Course
Service Area Population Projections
Year 2005
vs.
Year 2012
Population Projections - Comparison
80000
70000
~ 10K
Service Area Population
60000
50000
40000
30000
20000
10000
0
-10000
-20000
2005
2010
2005 Population
2015
Year
2020
2012 Population
2025
Difference
2030
Year 2005 Demand Projections/Shortfall
12
10
9.3
1.97
Demand (MGD)
8
8.53
6
Yr 2008
4
2
0
-2
2005
2010
2015
Permitted
2020
Year
2005 Demand
2025
Shortfall
2030
Year 2012 Demand Projections/Shortfall
12
10
Demand (MGD)
8
Permit
Renewal
Yr 2025
6
4
Yr 2008
Yr 2016
0.55
2
0
-2
2005
2010
Permitted
2015
Year
2005 Demand
2020
2012 Demand
2025
Shortfall
2030
OPTION 1
Continue with the Project
OPTION 2
Short Term Measure:
Piping Modifications in WWTP
Water/Wastewater System Life Cycle
Raw Water
Wells (12)
Water
Treatment Plant
Storage Tanks
Lime Sludge
Water Distribution
System
Homes /
Businesses
0.4 MGD
$150K - $400K
Biosolids
Injection Wells
(2)
Wastewater Treatment
Plant (East/West)
Collection System
Lift Stations
Sewer Force Mains
WWTP Piping Modifications
12
10
Demand (MGD)
8
0.15
6
4
Yr 2008
Yr 2027
2
0
-2
2005
2010
Permitted
2015
Year
2005 Demand
2020
Piping Mod.
2025
2030
Shortfall
OPTION 3
Long Term Measure:
Implement Conservation Program
Conservation Program
12
10
Demand (MGD)
8
6
4
Yr 2030
Yr 2008
2
0
-2
2005
2010
2015
2020
2025
Year
Permitted
2005 Demand
Conservation
Shortfall
2030
Staff Recommendations
• Reuse Project – Put on hold
• Prioritize Option 2 and 3
– Complete WWTP piping modifications +
aggressively implement Conservation Program
• Monitor Population Projections Closely
– Update and implement Reuse Project, if/when
needed
City Commission
• Consensus vote on staff recommendations