July 2008
CPS2 Waiver SDT
Overview of this presentation
● Background of SAR-003 and BAL-001-TRE-01
● Process Overview
● The Team
● The Road Taken to this Draft
● The work product (draft standard)
2
ERCOT Waiver for CPS2
ERCOT requested a Waiver for CPS2.
Stating that it “does not believe that frequency
control within its new single control area
interconnection is less reliable as a result of noncompliance with the CPS2 Standard following its
conversion.”
NERC granted the request November 21, 2002.
3
FERC NOPR on Mandatory Reliability Standards
● Docket No. RM06-16-000, October 20, 2006
● Paragraphs 137-143
● Paragraph 141
• ERCOT’s Protocols concerning frequency control identify that the
existing ERCOT approach to Interconnection frequency control is
necessary to assure reliability in that interconnection. However,
the existing waiver was filed prior to the formation of these
procedures. ERCOT is both a single balancing authority and the
smallest of the three Interconnections, approximately one tenth of
the size of the Eastern Interconnection. As such, frequency control
is more critical to its system reliability.
4
FERC Order 693
● March 16, 2007
●Paragraphs 309 to 315
5
Regional Standard Development
● Between March 16, 2007 and April 15, 2008, Texas RE
was getting organized and getting the processes and
procedures, as well as staff, ready for development of
standards.
● Texas RE launched its Reliability Standards Tracking
system in April 2008.
● Standard Authorization Request written by TRE April
15, 2008.
● SAR-003-TRE-01: FERC-Ordered Modification to
ERCOT Waiver to R2 of BAL-001-0 CPS2
6
Regional Standards Process Overview
SAR
Submitted
RSC/ROS
forms SDT
RSC
Evaluation and
disposition of
SAR
SDT
7
Regional Standards Process Overview ( Cont.)
Posting for Comments
(where we are now with
BAL-001-TRE-01)
SDT drafts
standard
RSC
Evaluation
More work
needed
SDT responds to comments and considers
modification to the draft standard
8
Regional Standards Process Overview ( Cont.)
RSC recommends
posting for vote
Reject
Forward the
package for
TRE BOD
approval
Remand
Evaluation by NERC
and approval by
NERC BOT
NERC filing to seek
FERC approval
RBB/BP
9
Standard Drafting Team
A team of technical
experts assigned
by RSC and
approved by ROS
Collectively have the
necessary technical
expertise and work
process skills pertaining
to the particular SAR
subject
Typically includes a
member of the Texas
RE staff and the
originator in addition to
the field Subject Matter
Experts (SME)
assigned by RSC/ROS
Standard Drafting Team
Work on the
technical
aspect of
the standard
Report to RSC on
the work progress
and make
appropriate
recommendations
as needed
10
Review stakeholders
comments and
consider modification
to the draft standard
Standard Drafting Team
● Team of Subject Matter Experts.
● Use their specific expertise to lead the
development and refinement of the technical and
detailed standards.
● Encourage and coordinate inter-industry
examination and consensus.
● Ensure that Regional Standards are technically
accurate, clear, enforceable, and provide an
adequate level of reliability for the ERCOT Bulk
Power System.
● Meetings of SDTs shall be open to all interested
parties.
11
SAR-003 Standard Drafting Team
Sydney Niemeyer*
Ananth Palani**
Vann Weldon
Ken McIntyre
Howard Illian
Pam Zdenek
NRG
Optim
ERCOT
ERCOT
Energy Mark
BP Alternative Energy
*Chair
**Vice-Chair
12
Ind. Generator
IOU
ISO
ISO
Consultant
Ind. Generator
SAR-003-TRE-01: FERC-Ordered Modification to
ERCOT Waiver to R2 of BAL-001-0 CPS2
SAR written by TRE April 15, 2008.
Accepted by RSC on May 27, 2008.
SDT slate was nominated and accepted by ROS on June
12, 2008.
First team meeting July 10, 2008.
Team has met 14 times (full day meetings) in nine months.
Team has updated RSC about every other month.
Posted initial work product (rough draft) in December for
RSC.
RSC approved final draft for public comment on March 4,
2009.
Draft posted for public comment March 16-April 14.
13
Meetings of SAR-003 SDT to Date
●
●
●
●
●
●
●
●
●
●
2008
July 10
August 14
September 2
September 9-10 (PDCWG)
September 16
October 3
October 23
November 21
December 5
14
●
●
●
●
●
2009
February 5
February 27
March 10
March 31 (Workshop)
SDT Work Product
● A draft Regional Standard consistent with the
SAR on which it was based.
● An assessment of the impact of the SAR on
neighboring regions and appropriate input from
the neighboring regions if the SAR is determined
to impact any neighboring region.
● Identification of any existing Regional Standard
(or Protocols) that will be deleted, in part or whole,
or otherwise impacted by the implementation of
the draft Standard.
15
SDT Work Product (Cont.)
● Technical reports and/or work papers that provide
technical support for the draft Regional Standard
under consideration.
● Document the perceived reliability impact should
the Regional Standard be approved.
● SDT is also responsible for developing all
required compliance and performance elements
and associated questions for a Comment Form.
● An implementation plan, including the nature,
extent and duration of field-testing, if any.
16
Draft BAL-001-TRE-01
● The SAR-003 Standard Drafting Team will now
present the technical background and need for
this standard.
● Your questions are appreciated, and the team
will make every effort to answer them today.
● But don’t forget to formally comment using
the Reliability Standards Tracking Site.
17