Transcript WAC_Webinar2-27-14
EPA’s Proposed Rule on Waters of the United States
Audio Dial in Number
855-581-6805
February 27, 2014
Don Parrish
• • Senior Director, Regulatory Relations, American Farm Bureau Federation Chair, Waters Advocacy Coalition
Waters Advocacy Coalition Members
• • • • • • • • • • • • • • • • • Agricultural Retailers Association American Farm Bureau Federation® American Forest & Paper Association American Iron and Steel Institute American Petroleum Institute American Road & Transportation Builders Association Associated General Contractors of America CropLife America Edison Electric Institute The Fertilizer Institute Florida Sugar Cane League Foundation for Environmental and Economic Progress Independent Petroleum Association of America Industrial Minerals Association - North America International Council of Shopping Centers Irrigation Association NAIOP, the Commercial Real Estate Development Association • • • • • • • • • • • • • • • • • National Association of Home Builders National Association of Manufacturers National Association of REALTORS® National Association of State Departments of Agriculture National Cattlemen’s Beef Association National Corn Growers Association National Council of Farmer Cooperatives National Milk Producers Federation National Mining Association National Multi Housing Council National Pork Producers Council National Stone, Sand & Gravel Association Public Lands Council RISE - Responsible Industry for a Sound Environment Southern Crop Production Association United Egg Producers Western Business Roundtable
Deidre Duncan
• • Partner, Hunton & Williams LLP Counsel to Waters Advocacy Coalition
Presenter Information DAVID SUNDING
Principal │ San Francisco [email protected] +1.415.217.1000
Prof. Sunding holds the Thomas J. Graff Chair of Natural Resource Economics at the University of California, Berkeley. He is the founding director of the Berkeley Water Center and currently serves as the chair of his department. He has won numerous awards for his research, including grants from the National Science Foundation, the U.S. Environmental Protection Agency, and private foundations.
5 | brattle.com
EPA’s Proposed Rule on Waters of the United States
February 27, 2014
Background
• • • CWA provides federal jurisdiction over “navigable waters,” defined as “the waters of the United States” In 1985, in
Riverside Bayview Homes
, the Supreme Court upheld the regulation of
wetlands adjacent to
or “inseparably bound up with” navigable waters The agencies adopted the current regulations in 1986 7
Background
• • In 2001, the Supreme Court in
SWANCC
rejected regulation of “isolated waters” under the Migratory Bird Rule because the waters lacked a “
significant nexus to navigable waters
” − Emphasized Congress’ use of the term “navigable” After
SWANCC
, the agencies adopted a broad interpretation that “waters of the U.S.” include
any water “connected”
to navigable waters 8
Background
• In 2006, the Court in
Rapanos rejected the agencies’ “any hydrological connection”
theory of jurisdiction as overly broad − Plurality opinion (Scalia): • • Rejected assertion of jurisdiction over ephemeral streams, ditches, and drains Relatively permanent waters − Kennedy concurrence: • • Joined plurality in rejecting the Government’s any connection theory Significant nexus 9
2013 “Proposed” Rule
• − − − − − − − − − − The Proposed Rule replaces the definition of “navigable waters” and “waters of the United States” in the regulations for all CWA programs, and in particular sections 311, 401, 402, and 404: − 33 C.F.R. § 328.3
− 40 C.F.R. § 110.1
40 C.F.R. § 112.2
40 C.F.R. § 116.3
40 C.F.R. § 117.1(i) 40 C.F.R. § 122.2
40 C.F.R. § 230.3(s) and (t) 40 C.F.R. § 232.2
40 C.F.R. § 300.5
40 C.F.R. § 300, Appendix E to Part 300, 1.5
40 C.F.R. § 302.3
40 C.F.R. § 401.11
10
WOTUS Under the “Proposed” Rule
1.
2.
3.
4.
5.
6.
7.
All waters currently, in the past, or may be susceptible to use in interstate or foreign commerce, including tidal waters; All interstate waters, including interstate wetlands; The territorial seas; All impoundments of waters otherwise defined as waters of the U.S.;
All tributaries
of waters identified in 1-3 above;
All waters, including wetlands, adjacent to water
identified in 1-5 of this section; and On a case-specific basis,
other waters
waters in the region have a , including wetlands, that alone or in combination with other similarly situated
significant nexus
to a water identified in paragraphs 1-3 11
New Definitions in “Proposed” Rule
•
Tributary:
− Water body physically characterized by a bed and bank and ordinary high water mark which contributes flow directly or through other water bodies to waters in 1-3. − A water
does not lose its tributary status if there are man-made breaks
(such as bridges, culverts, pipes, dams) so long as bed and bank can be identified up and downstream of the break. − − A wetland can be a tributary.
A tributary can be natural, man-altered, or man made and includes rivers, streams, lakes, impoundments, canals, and ditches (unless excluded).
12
Tributary Definition
• • • The rule, for the first time ever, specifically defines ditches as jurisdictional tributaries under all CWA programs − Roadside ditches − − Irrigation ditches Stormwater ditches Other man-made conveyances that drain or connect would also likely qualify as tributaries Huge practical consequences that have yet to be evaluated 13
Farm Ditch
14
Potomac, Maryland
15
• Roadside ditch constructed and maintained by Wicomico County, Maryland roads department 16
• •
Other New Definitions in “Proposed” Rule
Adjacent:
Bordering, contiguous, or waters separated from other WOTUS by dikes, or barriers are adjacent waters
neighboring Neighboring:
Waters located within a
riparian area
or
floodplain
subsurface connection − or waters with a surface or shallow
Riparian area:
Transitional areas between water and land where surface or subsurface hydrology influences the ecological process and plant community of the area … −
Floodplain:
An area bordering inland or coastal areas that … is inundated during periods of moderate to high water flows 17
Industrial Ponds Along the Colorado River
18
Washington, DC Floodplain
19
•
Significant Nexus Definition in “Proposed” Rule
Significant Nexus:
− Means a more than speculative or insubstantial effect that a water or wetland has either or alone or in combination with other waters in the region on waters 1-3. − Other waters, including wetlands, are similarly situated when they perform similar functions and are located sufficiently close together so that they can be evaluated as a single landscape unit.
20
Exclusions in “Proposed” Rule
• • • • Waste treatment systems designed to meet the requirements of the Clean Water Act; Prior converted cropland; Ditches excavated in uplands and that drain only uplands and have no more than ephemeral flow; and Ditches that do not contribute flow either directly or through other water bodies to a water in 1-3 above 21
Exclusions in “Proposed” Rule
• • • • • • • Artificially irrigated areas that would revert to uplands should irrigation cease Artificial lakes or ponds created in dry land and used exclusively for stock watering, irrigation, settling basins, or rice growing Artificial reflecting pools or swimming pools created by excavating and/or diking dry land Small ornamental waters created by excavating and/or diking dry land for primarily aesthetic reasons Water-filled depressions from construction Groundwater drained through subsurface drainage systems Gullies, rills, non-wetland swales, and puddles 22
Why Does CWA Jurisdiction Matter?
• The amount of jurisdictional waters influences: −
Enforcement/likelihood for potential illegal discharges
−
Permitting/reporting requirements
•
Type of permit:
Nationwide or individual −
“Federal action” triggers:
NEPA, ESA, NHPA, 401 water quality certification, etc.
−
Mitigation
−
Third-party challenge
23
Enforcement
24
Enforcement
25
Spill Prevention and Countermeasure Plan
26
Industrial Facility Implications
• • • Industrial ponds − Refineries − Process waters Industrial storm water systems − Closing or modifying facilities Ditches and other conveyances 27
Deidre G. Duncan
Hunton & Williams LLP 2200 Pennsylvania Avenue, NW Washington, DC 20037 (202) 955-1919 [email protected]
Review of 2013 EPA Economic Analysis of Proposed Revised Definition of Waters of the United States David Sunding, Ph.D.
F e b r ua r y 2 0 , 2 0 1 4 Copyright © 2014 The Brattle Group, Inc.
Agenda Incremental Jurisdictional Determinations Incremental Acreage Calculations Incremental Cost Calculations Incremental Benefit Calculations
30 | brattle.com
Incremental Jurisdictional Determinations
31 | brattle.com
Calculation of Incremental JDs
Streams Wetlands Other Waters Total No. ORM Records 95,476 38,280 8,209 141,965 No. Positive Juris. 93,538 37,709 0 131,247 Proj. Positive Juris.
95,476 38,280 1,396 135,152 % Total ORM2 Records 67% 27% 6% 100% % Positive Juris.
98.0% 98.5% 0.0% 92.5% Proj. Positive Juris.
100.0% 100.0% 17.0% 95.2%
USACE review of 262 project files from FY 2009/10
▀ 67% streams, 27% wetlands, 6% other waters − Old JD: − 98% of streams, 98.5% of wetlands, 0% of other waters USACE Review: 100% of streams, 100% of wetlands, 17% of other waters ▀ 2.7% incremental JDs 32 | brattle.com
Calculation of Incremental JDs Key Limitations
▀ ▀ ▀ No discussion of impacts of new jurisdictional terminology (“neighboring”) and revised definitions (“adjacent”, “tributary”, “riparian areas”, “floodplain”) on number of permit applications ORM2 database (USACE) categories of jurisdictional waters not compatible with EPA draft rule categories Universe of jurisdictional waters underrepresented in ORM2 database − Preliminary JDs not included − Majority of individuals not seeking permits likely for isolated waters category − Only impacted areas currently included (omitting non-impacted portion of site) 33 | brattle.com
Section 404 Permitting Process
Jurisdiction Seeks JD Proposed Project Omitted from EPA Analysis No Action No Jurisdiction • • Statistically invalid procedure that likely underrepresents impacts PJDs are improperly aggregated with JDs 34 | brattle.com
Incremental Acreage
35 | brattle.com
Calculation of Incremental Acreage
Permit Type Permits issued FY2010 Added Permits (2.7% increase) Average Impact Per Added Permit (Acres) Total Added Impacts (Acres) Individual 2,766 75 12.81
960 General Total 49,151 51,917 1,327 1,402
Calculations A B = A*0.027
0.28
C
372 1,332
D = B*C
36 | brattle.com
Calculation of Incremental Acreage Underestimation of impacted acreage
▀ FY 2009/10 baseline not representative − Period of reduced development and economic contraction (impacting both number of projects and average size of projects) ▀ ▀ USACE review does not address potential new permit seekers − Only concerns applicants already in system Section 404 impacts unreasonably extended to all CWA programs ▀ Heterogeneity in project files ignored − State-level and project size differences not addressed 37 | brattle.com
FY 2009/10 Baseline Not Representative
Source: US Census Bureau 38 | brattle.com
Incremental Costs
39 | brattle.com
Calculation of Incremental Costs Section 404
▀ ▀ ▀ ▀ Permit Application Costs Compensatory Mitigation Costs Permitting Time Costs (omitted from EPA analysis) Impact Avoidance and Minimization Costs (omitted from EPA analysis) 40 | brattle.com
Section 404 Permit Application Costs
Permit Type Permits issued FY2010 Added Permits (2.7% increase) Individual General Total 2,766 49,151 51,917 75 1,327 1,402 Average Impact Per Added Permit (Acres) Total Added Impacts (Acres) Costs from Corps’ Analysis (2010$) Costs from Sunding and Zilberman Study (2010$) Additional Annual Cost (2010$ millions) 12.81
960 $31,400 / permit $57,180 / permit + $15,441 / acre $2.4 - $19.1
0.28
372 $13,100 / permit $22,079 / permit + $12,153 / acre $17.4 - $33.8
1,332 $19.8 - $52.9
Calculations A B = A*0.027
C D = B*C E F 1,2 Lower: E*B Upper: (F 1 *B)+(F 2 *D)
41 | brattle.com
Section 404 Permit Application Costs Key Limitations
▀ Changes in distribution of individual/general permits not addressed ▀ ▀ ▀ Average project sizes ignore heterogeneity across projects Values from Sunding & Zilberman study nearly 20 years old and unadjusted for programmatic changes and inflation Permitting time costs and impact avoidance/minimization costs not addressed 42 | brattle.com
Section 404 Compensatory Mitigation Costs
Water Body Type Streams Wetlands Total
Calculations
Units of Mitigation 49,075 feet 2,042 acres Unit Costs ($2010) $177 - $265 Annual Cost (2010$ millions) $8.7 - $13.0
$24,989 - $49,207 $51.0 - $100.5
A B
$59.7 - $113.5
C = A*B
Key Limitations
▀ Discrepancy between EPA 2011 and 2013 analyses − Unit costs and amount of mitigation lower in 2013 analysis 43 | brattle.com
Calculation of Incremental Costs Other (Non-404) Sections
▀ ▀ ▀ Adopt old estimates Adjust for 2.7% incremental increase in jurisdictional waters Adjust for changes in program size
Key Limitations
▀ ▀ ▀ Impacts to some programs omitted due to lack of data Other programs assumed to be cost neutral without explanation − Example: Section 303 (state water quality standards and implementation plans) and Section 402 (NPDES permits) Estimates of Section 404 impacts (+2.7%) not applicable to non 404 programs 44 | brattle.com
Incremental Benefits
45 | brattle.com
Calculation of Incremental Benefits Section 404
▀ Increased clarity in CWA jurisdictional determination (omitted from EPA analysis) ▀ Ecosystem benefits from increased compensatory mitigation 46 | brattle.com
Section 404 Mitigation Benefits
Region Central Plains Delta and Gulf Mountain Midwest Northeast Pacific Prairie Potholes Southeast Other National
Calculations
Incremental Impact Estimate (Acres) 30 85 145 322 240 79 241 187 3 1,332
A
Number of Households 3,201,336 14,521,178 7,390,812 23,909,088 23,839,690 16,163,714 2,176,626 20,485,107 234,779 111,922,330
B
Present Value of Benefits per Year- 7% Discount (2010$ millions) $1.20 $14.80 $12.90 $92.30 $68.70 $15.30 $6.30 $46.10 $0.00 $257.60
C = A*B*0.012
Present Value of Benefits per Year- 3% Discount (2010$ millions) $1.50 $19.80 $17.30 $123.70 $92.10 $20.50 $8.40 $61.70 $0.00 $345.10
D = A*B*0.016
Benefit Transfer Analysis
▀ Synthesized 10 contingent valuation studies providing willingness to pay (WTP) estimates of wetland preservation ▀ WTP estimates multiplied by acres and households for each wetland region 47 | brattle.com
Section 404 Mitigation Benefits Key Limitations
▀ Selection of WTP studies arbitrary and not representative − 9 of 10 studies more than a decade old (oldest ~30 years old) ▀ − Several studies not published in peer-reviewed journals Unreasonable presumption of transferability of results − Localized benefits assumed to accrue to all members of wetland region − No adjustment for changes in economic trends, recreational patterns, stated preferences over time 48 | brattle.com
Calculation of Incremental Benefits Other (Non-404) Sections
▀ ▀ ▀ Adopt old estimates Adjust for 2.7% incremental increase in jurisdictional waters Adjust for changes in program size
Key Limitations
▀ Assumption that negative impacts would occur without increase in federal jurisdiction is unreasonable − State programs well-suited to protect local resources 49 | brattle.com
Summary of Incremental Costs/Benefits
Program §404 Mitigation- Streams 2 §404 Mitigation- Wetlands §404 Permit Application 3 §404 Administration §401 Administration 4 §402 Construction Stormwater §402 Stormwater Administration §402 CAFO Implementation 5 §402 CAFO Administration §402 Pesticide General Permit 6 §311 Implementation Total Costs ($millions) low high $8.7
$51.0
$13.0
$100.5
$19.7
$7.4
$52.9
$11.2
$0.7
$25.6
$0.2
$5.5
$0.2
$2.9
$133.7
$11.7
$31.9
$3.2
$231.0
Benefits ($millions) low $257.6
$25.4
$3.4
high $345.1
$32.3
$5.9
$300.7
$14.3
$397.6
Notes (from EPA documents): 1 §303 impacts are assumed to be cost-neutral; §402 impacts are components of costs and benefits previously identified for past actions, not new costs and benefits associated with this proposed rule 2 3 4 Benefits of stream mitigation are not quantified Costs of potential delayed permit issuance and costs and benefits of avoidance/minimization are not quantified, nor are any benefits from reduced uncertainty Costs to permittees and benefits of any additional requirements as a result of §401 certification are reflected in the mitigation estimates to the extent additional mitigation is the result, yet not calculated to the extent avoidance/minimization is the result.
5 Benefits apply to large CAFOs only, which account for 85% of implementation costs and 66% of administrative costs 6 PGP benefits and government administrative costs are not available 50 | brattle.com
Conclusion Underestimation of Incremental Acreage Flawed calculation of Incremental Costs
▀ ▀ Focus on Section 404 costs, other sections ignored No consideration of permitting time costs and impact avoidance/minimization costs
Flawed calculation of Incremental Benefits
▀ Benefit transfer analysis not consistent with best practices in environmental economics
Analysis poorly documented and contains multiple inconsistencies with previous analyses
51 | brattle.com