EU Procurement
• Procurement
– Identifying and understanding a demand for goods, services, works
– Strategy for meeting this requirement via a contract
– Evaluation of information received by the purchasing organisation to
identify competent suppliers
– Ensuring the demand is being fulfilled as expected
• The regulations
– Legal framework for procurement
– All organisations tasked with spending public funds are covered
– formalise the approach to and process of procurement, reducing the
opportunity for fraudulent activity and improve competition across the
EU
– Created in 1970, current version is EU directive 2004/18/EC
– Written into UK law in 2006
– For goods & Services the threshold for enactment is £113,057
EU Procurement
• A summary of the regulations are available on the Cabinet Office
website
• Benefits
– By following organisations ensure they are being:
• Open and transparent – allowing tenderers to understand what you
are going to do and how you are going to do it
• Be objective and ensure equal treatment of tenderers – allow all
tenderers a fair and equal chance of winning the contract
• Be consistent – do what you said you were going to do
– competition between suppliers of all sizes, by ensuring that
opportunities are advertised clearly and openly across the EU
– Suppliers are given complete information on the purchasing authority’s
requirements, and how that authority is to establish who the preferred
bidder is
– Auditability
EU procurement
• A robust procurement process that ensures Fairness, transparency
and equality. It affords a level playing field to all.
• Pharmaceuticals: any consortia or CMU-hosted projects will deliver
benefits to the NHS and suppliers from aggregated demand, and
support for once-only principles which lowers administrative costs
for all parties.
• In practice
– Procurement timescales set by the regulations
• Dependant on type of procurement process being run, but are
based on the priciple of fair time available for suppliers to review
and reply
– Example of CMU contracting processes for Pharma
• Restricted
• Open
Procurement processes
• Restricted procedure – More complex tenders
– Used where it is necessary to shortlist interested parties before invitation to
tender is issued
– Advertising, required where the threshold is reached: OJEU adverts
created and published
• Available from http://ted.europa.eu/TED, search companies and the
Bravo eTendering system
• Advert details
– Who the procuring authority is
– A description of the type of goods / services
– Where the contract is to operate
– The estimated funds to be spent
– The conditions of responding to the advert, for example any
criteria that the interested supplier must comply with, to be
considered for the invitation to offer stage
– The time limits for responding to the advert
– Duration of the contract
– And sometimes, the awarding criteria will be provided as well
Procurement processes
– CPV codes
•
•
•
•
•
Identification of products or services being sought
Details of the codes can be found here
33690000 – Primary for pharmaceuticals, many sub codes available
All CMU adverts include appropriate codes
Adverts / tender opportunities can be found by searching for the
CPV codes
• Pre qualification (PQQ)
– Registering interest – via Bravo, available for 37 days typically
– Eligibility to tender, criteria for responding and participation
• E.g. Technical, Competency, Financial
– Evaluation of information – shortlisting companies to be invited to tender
– SID4Health – central database of standard company information
• Reducing the need to supply for each tender
Procurement processes
• Invitation to tender (ITT)
•
•
•
•
Under restricted, only supplier passing the stated criteria will be invited
Main area of work for suppliers
40 days availability, complaint offers must be returned in this time
Tender document pack
• Specification: what’s needed and how it is to be delivered,
• Terms and conditions: how the contract is to operate and function
throughout it’s lifetime;
• Offer schedule: what the suppliers are being asked to offer for, plus
any supporting market information or clarification that will enable the
organisation to construct the most beneficial bid.
• Award criteria: details exactly how the bid is to be assessed.
– Under the EU regs, awarding criteria will fall in to two types: Firstly, lowest price
wins. Secondly, the most economically advantageous offer, which is a balance of
factors, such as quality, security of supply, price, delivery. The latter is typically
the only one used by CMU.
Procurement processes
• Open procedure
– No PQQ stage
– Used where no shortlisting of interested companies is needed
– Typical for most contracts CMU work on
– Immediate access to tender documents and the offer schedule openly
available
– Decision on it’s use is a balance of sensitivities, risk, benefit and
opportunity
– Reduction in timescales, no 37 day PQQ process, only 52 day ITT
• Timescales can be lengthened if needed or shortened to a degree if certain
criteria are met and it does not disadvantage suppliers.
• Negotiation following return of offers – not permitted under Open or
Restricted procedures
• Other procedures – more complex contracting requirements
– Negotiated, competitive dialogue
The final stage
• The procurement process, final stages
– Awarding a contract
• Opening and reviewing offers
• Assessment in line with stated award / evaluation criteria to identify
the winning supplier or suppliers who meet the requirements
– Notification of awards
• Successful and unsuccessful suppliers notified of the contracting
authorities decision
• Successful suppliers informed of the awarded items and detail
behind the decisions
• Unsuccessful suppliers provided with transparent information on the
awarding decision, detailing why the outcomes were reached
– Alcatel / Mandatory Standstill Period (MSP)
• All awards reserved for 10 days to allow any supplier to challenge if
they believe they have been treated unfairly
• Following the MSP, if no objections have been raised, the authority
is able to confirm all awards and enter into contract with suppliers
eProcurement
• eTendering / eProcurement systems.
–
–
–
–
–
–
–
–
Web based, Bravo is used by CMU
Most eTendering systems broadly similar, communication portal
Secure, registered user only access
No barriers to suppliers
Process set up to follow EU directives and timescales
Online storage of tender and offer documents with messaging systems
Fully auditable, on both sides
Email alerts to prompt for required actions to be performed or to confirm
completion of tender stages by suppliers
– Contract opportunities (OJEU adverts), list is available on the site’s
homepage
– PQQ’s and ITT set up within specific project folders
– Reduction in paper trail and process time
Bravo run through
•
•
•
•
•
•
•
www.cmu.bravosolution.nhs.uk
Registration
Finding opportunities
Responding to a PQQ
Accessing an ITT
Messaging functions
Responding to an ITT / submitting a bid
– Example
To finish
• Training
–
–
–
–
Specific training events possible if demand is there
CMU instructional documentation within ITT document packs
One 2 one assistance and walk throughs
Bravo training documents hosted on Bravo website
• Contact – If needed, please let me know and I can put you in touch
with:
– Specialised pharmaceuticals team, likely to be the most appropriate
CMU team for NHS manufacturing unit enquiries
– Sourcing specialists, assistance with the tender process and Bravo
– [email protected]
• Questions