Transcript Document

"FINANCIAL AND ECONOMIC ASPECTS OF
ENERGY SAVING WITHIN THE FRAMEWORK OF THE CSRC APPROACH"
Workshop: "TRANSNATIONAL ENERGY SAVING NETWORKS"
14 December 2005 Vilnius, Lithuania
Seppo Silvonen, Motiva Oy
Finland
Energy auditing as an essential part of the investment
process
Finnish national and EU energy auditing procedures
Seppo Silvonen
12.12.2005
A Package of Three Instruments
The Finnish set-up
Reporting
boundaries
4,1 TWh/a
Voluntary
Agreements
1,5 TWh/a
Energy
Audits
Seppo Silvonen
12.12.2005
0,5 TWh/a
Subsidies
The Finnish Energy Auditing Scheme (1)
Energy and Climate Strategy
Energy EfficiencyProgramme
Voluntary
Agreements
RES-Programme
Energy Auditing Scheme
Market
Free
Seppo Silvonen
12.12.2005
Subsidised
The Finnish Energy Auditing Scheme (2)
THE ADMINISTRATOR
THE OPERATING AGENT
Financing
Marketing
THE AUDITOR
Reporting
Guidance
THE CLIENT
Seppo Silvonen
12.12.2005
An Energy Audit
In general
• gives adequate knowledge of the existing energy
consumption profile
• identifies factors affecting the energy consumption
• brings up cost-effective energy saving opportunities
The Core Audit
• makes an evaluation of the present consumption
• identifies and quantifies the feasible energy saving
possibilities
• produces a report
Seppo Silvonen
12.12.2005
Programmes
Environmental programmes
Energy efficiency programmes
Energy
Audit
Programmes
Seppo Silvonen
12.12.2005
Other
Programmes
with EA
Activities with
Energy Audits
TARGETS OF ENERGY AUDITING
 Total picture of the use of energy, its distribution and costs
 Energy saving potential and the possibilities to use renewable
energy sources
 Listing of all economically feasible proposals for energy
saving measures (single pay-back time < 10 a)
Nitrogen factory
260 [kW]
Lighting
Compressed air
80 [kW]
190 [kW]
Ventilation
Air cooling
220 [kW]
Other
200 [kW]
65 [kW]
Electricity
3165 [kW]
TABLE 2
220 [kW]
50 [kW]
530 [kW]
Heat recovery
Savings
EUR
2600 [kW]
30 [kW]
Heat recovery boiler
6900 [kW]
Direct process removals
4000 [kW]
Raw material
preprocessing
Measure 1
1400 [kW]
520 [kW]
Oxygen burner
550 [kW]
1630 [kW]
Measure 2
Lehr
Float bath
1320 [kW]
1110 [kW]
Water cooling
Melting
3600 [kW]
1300 [kW]
1380 [kW]
Natural gas
17730 [kW]
1220 [kW]
10620 [kW]
Seppo Silvonen
12.12.2005
Room
:
:
Total
Costs
EUR
Payback
time (y)
The Finnish Energy Auditing Scheme (3)
Motiva – Key Functions in the Energy Auditing Scheme
Seppo Silvonen
12.12.2005
DEVELOPMENT
AND
TRAINING
MARKETING
MONITORING
QUALITY
CONTROL
The Finnish Energy Auditing Scheme (4)
Functioning in close co-operation
with the Ministry of Trade and Industry
Linking to other
systems
Implementation of the Directives on
• energy performance of buildings
• energy end-use efficiency and
energy services
International
co-operation
Reporting
Information
System
Planning
Development
of Methods&Tools
Seppo Silvonen
12.12.2005
Information
dissemination
Quality control
of auditing reports
Training
Authorisation
of auditors
The Finnish Energy Auditing Scheme (5)
1
The link between the voluntary energy
conservation agreements and
energy audits
Agreement
2
Description of
energy consumption
Follow up,
3
Energy audits
and analyses
4
5
Seppo Silvonen
12.12.2005
Improvement
plans and
implementation
Annual reporting
updates….
Agreements and energy audits
Voluntary energy conservation agreement:
• significant carrier for energy audits in all sectors
except the transport sector
• partners to the agreements are “obliged” to carry out
energy audits and to reach a set coverage within a
certain time
Seppo Silvonen
12.12.2005
Seppo Silvonen
12.12.2005
Energy auditing models for different
client groups
• Buildings: public and private services, apartments
• Industrial sites
- SME’s
- Process industry
• Energy sector
- Power plants
- District heating, plants and distribution
networks
• Transportation
Seppo Silvonen
12.12.2005
Other sectors:
Energy sector
Power Plant
Energy Analysis
Industrial plants
high energy
intensity
Process Industry
Energy Analysis
Energy
Audit
Programme
Industrial
Energy
Analysis
Industrial
plants
Updating
with
industrial
models
Industrial
Energy
Audit
SME’s
Energy
Inspection
Small buildings
service sector
Building
Audit
Large buildings
service sector
Blocks of flats
District Heating
Energy Audit
Postacceptance
Energy
Audit
Follow-up
Energy
Audit
THE VOLUNTARY AGREEMENT SCHEME
Audit Models
COMMERCIAL
AUDITS
Air
Audit
Energy Audit
Model being developed
Small
residential buildings
Model subsidised by the Ministry of Trade and Industry
Seppo Silvonen
12.12.2005
Model not subsidised
ENERGY CONSERVATION PROGRAMME
Estimated saving potentials with the proposed
measures by 2010:
Fuels
Electricity
12 %
15 %
Industry
6%
3%
Transportation
9%
Other sectors
3%
Heating of buildings
Seppo Silvonen
12.12.2005
4%
Energy Audits – Results
Savings potential
• service sector (appr. 1200 buildings)
Heat
15 %
Electricity
6%
Water
7%
• small and medium sized industry (appr. 190 buildings)
Heat and fuels
25 %
Electricity
8%
Water
11 %
• the saving potentials in the energy intensive industry
and power and heat sector are considerably smaller
Seppo Silvonen
12.12.2005
Rules for Energy Audits subsidised by the Ministry
of Trade and Industry (MTI)
•
•
•
•
•
•
•
•
Standard contents
Proper scheme to be applied for the case in question
Criteria to be met by the applicant of the subsidy
Authorised auditors for HVAC and electrical
installations
Cost limits
Forms of application and payment of the subsidy
Reporting procedure
Subsidy level
Seppo Silvonen
12.12.2005
Direct government support
• The government finances the costs of the operating agent
(Motiva) of the Finnish energy audit program and gives
40…50 % support for the energy auditing project expenses
• 15…20 % subsidies for conventional energy saving
investments for companies who have joined the voluntary
Energy Conservation Agreements with the Government.
• Higher subsidies (20..25 %) has been granted for ESCO
investment projects at least until the end of the year 2004 by
the government
Seppo Silvonen
12.12.2005
Profitability of the proposed energy saving
measures of 1 265 buildings
3,0
Savings potential(million €)
2,5
2,5
2,5
2,0
1,5
1,0
0,8
0,4
0,5
0,4
0,3
0,3
0,2
0,1
0,2
0,1
0,0
0,0
0
0-1
1-2
2-3
3-4
4-5
5-6
6-7
Pay back time (years)
Seppo Silvonen
12.12.2005
7-8
8-9
9-10
10
Regional Energy Audits
meant for
• mapping the existing use of fuels and the potential for increasing
the use of RES in the production of heat and power in a municipality or other region
• supporting the working out of the plan for RES in implementing
the voluntary energy conservation agreement
done by
• working out a regional energy balance
• estimating the available sources of renewable energy
• identifying facilities where the available sources of renewable
energy could feasibly replace the use of non-renewable energy
sources
Seppo Silvonen
12.12.2005
International review of Energy Auditing
Review of energy audit methods and
practices in some European countries
Establishing an energy audit programme – the 12 basic
elements
Situation in some European countries
More of this: www.
Seppo Silvonen
12.12.2005
International review of energy auditing
Energy audit programmes
in the EU Member States,
Norway and the CEECs
Seppo Silvonen
12.12.2005
International review of energy auditing
Other programmes with
energy audits in the EU
Member States, Norway
and the CEECs
Seppo Silvonen
12.12.2005
International review of energy auditing
Other Activities with
energy audits in the EU
Member States, Norway
and the CEECs
Seppo Silvonen
12.12.2005
International review of energy auditing
Projects in the SAVE II Programme:
Audit I – Country reports
Audit II – Topic reports
• Monitoring and evaluation
• Energy audit models
• Training, authorisation and quality control
• Auditor’s tools
• Implementing instruments
To look at these: www.motiva.fi (English pages)
Seppo Silvonen
12.12.2005
To hear the latest, come to
energyAUDIT06
in Lahti, Finland
September 11-13, 2006
More of this: www.motiva.fi (Enlish pages)
Seppo Silvonen
12.12.2005