Hamina 4.2.2015 • Managing Director Timo Toikka • Hamina Energy Ltd • Mobile +358 400 556 230 • [email protected] • Operating engineer, wind power Heikki Lappalainen • Haminan Energy Ltd • Mobile +358 406316214 • [email protected] HAMINA ENERGY LTD • the company was founded 23.3.1901 • distribution of natural gas was started 3.12.1982 • incorporation: Hamina Energy LTD 1.9.1994 • District heating, own production, internet services etc. 2000=> • owned by the town of Hamina (100%) • Turnover: 38 M€ • Personnel: 55 • Business areas: – electricity – natural gas – district heat – energy production services – data sevices TURNOVER Other Natural gas Electricity STRATEGY IN FUTURE • • • • • • • • Saving material and services Saving energy Reuse of material Energy from waste CO2 free renewal energy CO2 free energy Renewal energy Low emission energy FUTURE INVESTMENTS Renewable / emission-free energy • Wind • Biogas - agriculture/household waste => biogas for traffic and electricity production, fertilizers for agriculture • Geothermal heating • Nuclear power • LNG terminal and power plant FUTURE OF DATA COMMUNICATIONS • • • • • • • • • Expansion of WiMAX for dispersed settlement areas Building of optical fibre network in urban areas Remote control of meters Remote control of units Camera surveillance Wireless network in logistics Backup services TV services web shop CO-OPERATION IN HAMINA CONCERN • • • • • • Common image in Hamina area Cooperation in marketing New industry to the area Competitive advantage in business Stability in costs Euros in our own economic area STRATEGY FOR THE FUTURE • Associating in capital intensive investments; Suomen Voima (16 companies, 500M€ turnover, 800M€ balance sheet and 70M€ investments) • Promotion of interests, development and marketing organization Paikallisvoima (40 companies, 500 000 customers) • Development of local industry and businesses • Investing in self-sufficient, emission-free production INDUSTRIAL ENERGY SOLUTIONS • • • • steam boiler plant (natural gas) hot oil boiler (natural gas) hydrogen plant (electrolysis) emergency power generator, electricity, heat (hot oil), steam, burning of process gas, hydrogen, natural gas, process water and reserve power History of wind power in Hamina • 30% share of Kotkas 2 MW wind park 1999-2005 • 3 MW wind power plant Kemi, Ajos 2006 – the first commercial 3MW WWD-3 wind power plant • 12 MW ( 4x3MW WWD-3) wind park in Hamina, Summa 2010 • Extencion of Hamina wind park, Harbour 2015=> (2x3MW Enercon E101) • New projects (Myllykylä) • Hamina Energy Ltd is involved in many projects, both provencially and nationally. 17.7.2015 Phase I Wind power plant, Ajos • WWD-3 3MW – 88 m / 90 m • 3 MW / 7500 MWh/year • Ready for the production 2006 • Electricity connection: Kemi Energia Oy (20kV) Phase II Wind Power, Summa • 4 x WWD-3 3 MW • 12 MW / 30000 MWh/year – 100 m / 100 m • Ready for the production 2010 • Electricity connection: Haminan Energy Oy, Hillo 110/20 kV substation Phase III Wind Power, Harbour • 2 x Enercon E101 3MW • 6 MW / 18000 MWh/year – 101/133 m • will be completed in the autumn of 2015 • Electricity connection: Haminan Energy Oy 20kV grid Operation • WWD3 Wind power plants 4x3MW – Because WinWind doesn’t exist anymore,we have a partner, Wind Controller Oy, who operates our wind turbines 24/7. • Enercon E101 2x3MW – We have a long operation and maintenance agreement with Enercon. Maintenance • WWD3 wind turbines – We have a team that consists of four persons. • Operating and maintenance engineer • Three special wind turbine mechanics. – Technical support from our partner. • Enercon E101 – Enercon takes care of the maintenance and is responsible for it to us. 17.7.2015 HAMINA LNG Thank you for your attention! Any questions?