SEABEE COMBAT
WARFARE
PHIBCB SPECIFIC
102
Supply/Logistics Fundamentals
Reference
• OPNAVINST 5450.46K, Doctrine and Policy
Governing U.S. Naval Mobile Construction Battalions
(NMCBs) and Construction Battalion Units (CBUs)
• NAVFAC P-2010, Naval Construction Force and
Maritime Pre-positioning Force
• NAVFAC P-25, NMCB Table of Allowance(TOA)
Overview
• NAVFAC P-25, NMCB Table of Allowance
• NAVFAC TA67, PHIBCB Table of Allowance
• NAVFAC P-35, UCT Table of Allowance (TOA)
• NAVFAC P-31, NCFSU Table of Allowance
• NAVFAC P-05, CBMU Table of Allowance
Administration
Command and Control
• PQS QUESTION 103.1 Describe the Prepositioned War Reserve Management System
(PWRMS) and how it is utilized within the Naval
Construction Force (NCF)
• Reference: OPNAVINST 5450.46K, Doctrine
and Policy Governing U.S. Naval Mobile
Construction Battalions and Construction
Battalion Units
PWRMS
• Pre-positioned War Reserve Material
Stocks.
• Active NMCB units have a complete TOA
assigned to the custody of the NCBs and their
Fleet CINCs. TOA for reserve NCF units are
managed under the PWRMS program.
PWRMS
• Managed and controlled by
COMNAVFACENGCOM’S SLC for the
program sponsor CNO (N41).
• SLC is the technical advisor on all matters
relating to NCF TOA and equipment
assets.
PWRMS
• Additional responsibilities include the following.
– Developing and maintaining the TOA standard
– Ensuring equipment in the TOA is air-certifiable
– Procuring, storing, and maintaining PWRMS for
NCF reserve units
– Providing and coordinating the planning,
programming and budgeting of all TOA and
PWRMS
PWRMS
– Serving as Logistics Agent for NCF participation in
the MPF Program. NCF MPF TOAs are PWRMS.
– Implementing centralized CESE and PWRMS
management with the specific objectives of.
– Ensuring aforementioned material readiness
requirements for NCF Units are adequately
supported.
PWRMS
– Minimizing CESE inventories to reduce overall program
cost.
– Using PWRMS to support peacetime reserve unit training
and CBU shore activity projects
– Maximizing program cost effectiveness while satisfying
mission requirements.
– Active and Reserve NCF unit TOA requirements are
primarily met through structured Advanced Base
Functional Components.
Administration
Command and control
PQS Question 103.2: Describe the Maritime
Pre-position Force (MPF) principles of strategy
and their relationship in support of the Marine
Air-Ground Task Force (MAGTF)
Reference: NAVFAC P-2010, Naval
Construction Force and Maritime Pre-positioning
Force
MPF / MAGTF
• Principles of strategy
• An MPF operation is a strategic deployment
option that uses equipment and supplies prepositioned aboard forward-deployed ships. These
ships are grouped together as a MPSRON of
which there are three stationed around the globe
MPF / MAGTF
• During a MPF operation, an appropriate sized
MAGTF and NSE are airlifted by air mobility
command into a host nation’s secure airfield and
taken to the arrival and assembly area to join up
with their equipment and supplies in preparation
for combat operations.
MPF / MAGTF
• Support of MAGTF
• The combination of maritime pre-positioned
equipment/supplies, and airlifted elements
associated with a MPSRON provides the MAGTF
of 17,300 marines and an 850 person naval
support element with sustainment capability for
up to 30 days
Administration
Command/control
PQS Question 103.3 List the different echelons
of your unit’s Table of Allowance (TOA)
Reference: NAVFAC P-25, TA67, P-35, P-31
and P-05 Table of Allowance(TOA)
NMCB TOA
P25
NMCB
P25A
NMCB AIR DET
P25C
NMCB AIR ECH LESS AIR DET
P25D
NMCB SEA ECHELON
PHIBCB TOA
The PHIBCB TOA is not broken into echelons
TA67-3
AMPHIBIOUS CONSTRUCTION BATTALION
HOMEPORT TOA
UCT TOA
P35
UNDERWATER CONSTRUCTION
TEAM (UCT)
P35DA
ECHELON 02 UCT AIR DET ALFA
P35DB
ECHELON 03 UCT AIR DET
BRAVO
UCT TOA
P35DC
ECHELON 04 UCT AIR DET
CHARLIE
P35DF
ECHELON 06: UCT ARCTIC
SUPPORT
P35DS
ECH 05: UCT SEA ECHELON
NCFSU TOA
P31N01
NCFSU ECHELON 1: HQTRS ADMIN
& LOGISTICS
P31N02
NCFSU ECHELON 2: ENGINEERING
SUPPORT
P31N03
NCFSU ECHELON 3: LONG HAUL &
TRANSPORTATION OPS
P31N04
NCFSU ECHELON 4: NMCB AUGMENT
EQUIPMENT & SUPPORT
NCFSU TOA
P31N05
NCFSU ECHELON 5: FACILITIES
P31N06
NCFSU ECHELON 6: AUGMENT
CLOTHING/SLEEPING SYSTEM
P31N07
NCFSU ECHELON 7: WATER
PRODUCTION
P31N08
NCFSU ECHELON 8: SOIL STABILIZATION
OPERATIONS
P31N09
NCFSU ECHELON 9 ASPHALT PLANT &
PAVING OPS
NCFSU TOA
P31N10
NCFSU ECHELON 10: CONCRETE PLANT
OPERATIONS
P31N11
NCFSU ECHELON 11: HEAVY
CONSTRUCTION
P31N12
NCFSU ECHELON 12: TRANSMISSION LINE
INSTALLATION
P31N13
NCFSU ECHELON 13: EARTH MOVING &
COMPACTION
P31N14
NCFSU ECHELON 14: ROCK CRUSHING
OPERATIONS
CBMU TOA
The NAVFAC P-05 is not broken into
echelons.