Transcript Slide 1

eDEP Users Group Meeting
Radar Skills Trainer
Road map
Vladimir Bubalo, IANS TDH
eDEP UG Bretigny, June 9th 2008
Content
RST History
RST in brief
RST users
Support & Maintenance
Future steps
eDEPUG Bretigny, June 9th 2008
RST History
• V1.0 replacement was necessary
• obsolete software
1999
2000
V 1.0
2001
2002
2003
2004
2005
V 1.0
V 2.0
Austrocontrol T T
NATS
Belgocontrol
2006
2007
V 2.1
T
TFG16 RST
UG
• V2 - Phased development
• Intensive live testing
eDEPUG Bretigny, June 9th 2008
RST in brief
eDEP
Courses
Classes
Users
Radar Skills Trainer
Flights
Weather
Airspace
R/T
Analyses
Replay
Progress review
Exercise E
Preparation P
Tool
T
•Lightweight, Java-based PTT
•Automatic objective measurement
•Replay
eDEPUG Bretigny, June 9th 2008
RST Configuration
• STANDALONE
Hybrid
Distributed
• Local Network – No Course Management System
• Local Network - CMS
eDEPUG Bretigny, June 9th 2008
RST Configuration: standalone - 1PC
Hybrid
Standalone
eDEPUG Bretigny, June 9th 2008
RST Configuration: distributed - 2 PCs
Controller
Pilot
Network connection
RST software
No CMS
PWP software
eDEPUG Bretigny, June 9th 2008
RST Configuration: CMS server
Controller
(CWP)
Pilot
Network connection
(PWP)
CMS SERVER
RST software
eDEPUG Bretigny, June 9th 2008
What may be measured?
eDEPUG Bretigny, June 9th 2008
Users
13 RST Users
FI
5 LAs in preparation
SE
NO
RU
EE
LV
DK
LT
IE
KZ
BY
GB
PL
NL
BE
UA
DE
CZ
LU
FR
SK
AT
CH
SI
AM
IT
RS
CG
AZ
BG
MK
ES
PT
GE
RO
HR
BH
MC
MD
HU
TR
AL
GR
CY
MA
DZ
TN
MT
http://elearning.ians.lu/ptt/
eDEPUG Bretigny, June 9th 2008
Support & Maintenance
• Maintenance agreement (TDH – Graffica)
• 1st level - On line help DESK
• Each authorised user – support account
• Response within two (working) days
• On site CMS installation on request
(Graffica)
• Mission expenses covered by user
• Local IT support to assist installation
• Similar service offered by
Austrocontrol
eDEPUG Bretigny, June 9th 2008
Future steps
2008
Feb
Mar
Apr
May
Jun
Jul
2009
Aug
Sep
Oct
Nov
Dec
Jan
Feb
eDEP coordination
Mar
Apr
V2.3 development
eDEP UG
eDEPUG Bretigny, June 9th 2008
Future steps
Component(s)
affected
Effort
Required
(days)
Cross Over the Point
EPT, SIM, Replay
5
PWP Aircraft Performance
EPT, SIM
7
Route Visibility
EPT, SIM, Replay
5
Range and Bearing Values
EPT, SIM
1.5
Mode N (Primary only targets)
EPT, SIM, Replay
5
Transponder Failure
EPT, SIM, Replay
7
CMS record all results
CMS
7
EPT map resource configuration and preview functionality
EPT
4
Specify holding fixes and scoring of related tasks
EPT, SIM
5
Prediction Vector selectable by students
EPT, SIM
2
Improved Radar picture at PWP
PWP
3
Express range and bearing tolerances in percentages
EPT, SIM
1
Exercise clock for pilot
PWP
1
Extra notification when PWP is available but not visible
SIM
1
Change Request Description
•V 2.3 improvements
eDEPUG Bretigny, June 9th 2008
Future steps
TWR
ITWP
RST
AVT
CIMACT
LARA
TCAS
FASTI
eDEP
eDEPUG Bretigny, June 9th 2008
Future steps
• better coordination
• shared software changes
• reduced overall costs

• guaranteed and improved maintenance

• increased workload
• dependence on the core platform for
software releases
eDEPUG Bretigny, June 9th 2008
eDEP UG Bretigny, June 9th 2008