Transcript Slide 1
eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH eDEP UG Bretigny, June 9th 2008 Content RST History RST in brief RST users Support & Maintenance Future steps eDEPUG Bretigny, June 9th 2008 RST History • V1.0 replacement was necessary • obsolete software 1999 2000 V 1.0 2001 2002 2003 2004 2005 V 1.0 V 2.0 Austrocontrol T T NATS Belgocontrol 2006 2007 V 2.1 T TFG16 RST UG • V2 - Phased development • Intensive live testing eDEPUG Bretigny, June 9th 2008 RST in brief eDEP Courses Classes Users Radar Skills Trainer Flights Weather Airspace R/T Analyses Replay Progress review Exercise E Preparation P Tool T •Lightweight, Java-based PTT •Automatic objective measurement •Replay eDEPUG Bretigny, June 9th 2008 RST Configuration • STANDALONE Hybrid Distributed • Local Network – No Course Management System • Local Network - CMS eDEPUG Bretigny, June 9th 2008 RST Configuration: standalone - 1PC Hybrid Standalone eDEPUG Bretigny, June 9th 2008 RST Configuration: distributed - 2 PCs Controller Pilot Network connection RST software No CMS PWP software eDEPUG Bretigny, June 9th 2008 RST Configuration: CMS server Controller (CWP) Pilot Network connection (PWP) CMS SERVER RST software eDEPUG Bretigny, June 9th 2008 What may be measured? eDEPUG Bretigny, June 9th 2008 Users 13 RST Users FI 5 LAs in preparation SE NO RU EE LV DK LT IE KZ BY GB PL NL BE UA DE CZ LU FR SK AT CH SI AM IT RS CG AZ BG MK ES PT GE RO HR BH MC MD HU TR AL GR CY MA DZ TN MT http://elearning.ians.lu/ptt/ eDEPUG Bretigny, June 9th 2008 Support & Maintenance • Maintenance agreement (TDH – Graffica) • 1st level - On line help DESK • Each authorised user – support account • Response within two (working) days • On site CMS installation on request (Graffica) • Mission expenses covered by user • Local IT support to assist installation • Similar service offered by Austrocontrol eDEPUG Bretigny, June 9th 2008 Future steps 2008 Feb Mar Apr May Jun Jul 2009 Aug Sep Oct Nov Dec Jan Feb eDEP coordination Mar Apr V2.3 development eDEP UG eDEPUG Bretigny, June 9th 2008 Future steps Component(s) affected Effort Required (days) Cross Over the Point EPT, SIM, Replay 5 PWP Aircraft Performance EPT, SIM 7 Route Visibility EPT, SIM, Replay 5 Range and Bearing Values EPT, SIM 1.5 Mode N (Primary only targets) EPT, SIM, Replay 5 Transponder Failure EPT, SIM, Replay 7 CMS record all results CMS 7 EPT map resource configuration and preview functionality EPT 4 Specify holding fixes and scoring of related tasks EPT, SIM 5 Prediction Vector selectable by students EPT, SIM 2 Improved Radar picture at PWP PWP 3 Express range and bearing tolerances in percentages EPT, SIM 1 Exercise clock for pilot PWP 1 Extra notification when PWP is available but not visible SIM 1 Change Request Description •V 2.3 improvements eDEPUG Bretigny, June 9th 2008 Future steps TWR ITWP RST AVT CIMACT LARA TCAS FASTI eDEP eDEPUG Bretigny, June 9th 2008 Future steps • better coordination • shared software changes • reduced overall costs • guaranteed and improved maintenance • increased workload • dependence on the core platform for software releases eDEPUG Bretigny, June 9th 2008 eDEP UG Bretigny, June 9th 2008