No Slide Title

Download Report

Transcript No Slide Title

2nd Post-EPS User Consultation
Workshop
Darmstadt, 3-4 February 2009
ONLY SELECTED
SLIDES FOR ASI
Programme Preparation
Lorenzo Sarlo
Slide: 1
EUM/PPS/08/VWG/0124 -
22 October 2008
The Post-EPS
Framework
08
20
15
10
30
25
35
Post-EPS Sounding/Imaging (09:30 LTDN)
EPS MetOp A, B, C (09:30 LTDN)
Post-EPS Additional Contribution (TBD)
NPOESS C2, C4 (05:30 LTDN)
NOAA-N, N’ (13:30 LTAN)
Readiness /
NPP (13:30 LTAN)
NPOESS C1, C3 (13:30 LTAN)
Sentinel-3 (±10:30 LTDN)
Jason 1, 2
EUM/PPS/09/VWG/0013
3 February 2009
Jason 2 follow-on / SWOT
Slide: 2
NPOESS follow-on programme
The Post-EPS
Framework

The Post-EPS Programme Preparation includes the Phases 0 and A
• The Phase 0 is currently running and will last until Q4 2009
• The Phase 0 will be closed with the planned MDR (Mission Definition Review)
• The Phase A includes a PCR (Preliminary Concept Review) and will close with a
PRR (Preliminary Requirements Review) at system level

EUMETSAT conducts the overall Mission, System and Ground Segment
Engineering


ESA conducts Industrial Studies at Pre-feasibility and feasibility level
ESA also ensures coordination at Space Segment Level for the GMES Sentinel 5
Post-EPS Programme Preparation process based on the logic deployed for the successful
preparation of the MTG Programme.
MTG entered Phase B in January 2009
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 3
Post-EPS
User Consultation Process
2005
1st Post-EPS UC Workshop, 2006
User
Needs
Application
Expert
Group
(AEG)
Position
Papers
Candidate
Missions
Post-EPS
MRD, PARD
2nd Post-EPS UC Workshop, 2009
MDR
Phase 0
Studies
Space Segment
Configuration to
be Selected by
Council
Key milestones of the User Consultation Process
are these Workshops, providing the forum for
users and experts to follow and steer the results
of the process.
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 4
3rd Post-EPS UC
Workshop
Phase A
Studies
PRR
(2009-2011)
Draft EURD
Payload
Complement to
be Selected by
Council
Phase A
Closeout
2011
PHASE B
Post-EPS
User Consultation Process
User Consultation
 > 150 User Representatives involved
 2 Workshops conducted since 2006
 The 1st UC Workshop (DA, 2006) provided
The Post-EPS Mission
Expert Team
 This 2nd Workshop will help to discuss on
Requirements definition and
consolidation
very relevant recommendations for the
elaboration of mission requirements
candidate missions to support further
consolidation of requirements and concepts
 Further Workshops will be organised in the
future to keep users informed on progress of
Post-EPS during Phase A
 7 meetings already done
 Support to Mission
 Consulted for all relevant
requirements descoping
necessary to eliminate hard
design drivers
 Will be maintained during
Phase A
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 5
Planning
Elements
Post-EPS Status & Roadmap
Phase 0
Mission Analysis
2005 – 2009
Phase A
Feasibility
2009 – 2011
Phase B
Preliminary Definition
2011 – 2013
Phase C/D
Detailed Definition, Production
2014 – 2019
Phase E
Utilisation
from 2018/2020
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 6
Planning
Elements
Post-EPS Status & Roadmap
2nd User Cons. Workshop
MDR
2007
2008
2009
Phase 0
2010
2011
Phase A
2012
2013
Phase B
Prep. Programme
2014
2015
2016
2017
2018
2019
Phase C/D
IR and MW Sounding
VIS/IR Imaging
missions
Development and Operation Programme
EUMETSAT
Approval Processes
ESA Programme
EUM/PPS/09/VWG/0013
3 February 2009
ESA Min. Conf.
go ahead for
phase B/C/D
Slide: 7
2020
Operations
Other
missions
Industrial Studies
conducted
ESA Phase 0 Studies
> EUMETSAT
Preparatory Programme
2007
2008
2009
2010
2011
2012
planned
Ph. A Studies
Ph.0 Studies
extension
PAR held in June
June 2008
MTRs completed
in January 2009
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 8
PAR
MTR
ESA CMin-11
go-ahead for
Phase B/C/D
FR + MDR
2nd User Consultation
Workshop
… Detailed Presentations planned at
this workshop …
Cooperation
Framework
NPOESS
Post
NPOESS
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 9
2nd User Consultation Workshop Objectives
JPS
… other
Operators /
Agencies …
Other potential areas for cooperation
3MI and RO
The User Consultation Process is a Pillar of the EUMETSAT
Programme Preparation process
The Post-EPS Mission Experts Team (PMET)
effective work highly recognised and appreciated
Next Steps aim to prepare for important decisions of the
EUMETSAT and ESA Councils for the Post-EPS
Programme to endorse MRD and agree on the
cooperation schemes
… Dialogue with Users continues…
EUM/PPS/09/VWG/0013
3 February 2009
Slide: 10