Stage 2 Disinfectants and Disinfection Byproducts Rule

Download Report

Transcript Stage 2 Disinfectants and Disinfection Byproducts Rule

Stage 1 and 2
Disinfection Byproduct Rule
presented by:
Joseph Munson
Outline
• Introduction to Disinfection Byproducts
• Stage 1 & 2 Overview
• Initial Distribution System Evaluation
(IDSE) Options
• Stage 2 Compliance
• DCTS
• IDSE Tool
Public Health & Disinfection
Disinfectants:
• Kill or inactivate
disease-causing
microorganisms
• React with
substances
naturally in water
to form harmful
DBPs
• Produce negative
health effects
when present in
excessive levels
How Are DBPs Formed?
Precursor in Water
NOM
Bromide
Added Disinfectant
+
Chlorine
Chloramines
Chlorine Dioxide
Ozone
DBP
=
TTHM
HAA5
Chlorite
Bromate
Health Effects
• Disinfectants
(in large doses):
− Eye and nose
irritation
− Stomach discomfort
− Anemia
− Other acute shortterm health effects
• Byproducts:
− Cancer
− Liver problems
− Kidney problems
− Central nervous
system problems
− Anemia
− Reproductive
problems
A Delicate Balance



Risk: microbial
contamination vs.
DBP formation
EPA’s solution:
control health risks
from microbials,
disinfectants, and
DBPs
Result: M-DBP
Suite of rules
Microbials
DBP’s
Stage 1 & 2
DBPR Overview
Stage 1 & 2 DBPR Overview
• Stage 1
− Applied to all community and nontransient noncommunity water
systems that add a chemical disinfectant.
− 221 systems in South Dakota are complying with Stage 1
regulations.
• Stage 2
− Will apply to all community and nontransient noncommunity
water systems that add a chemical disinfectant or that purchase
water with an added chemical disinfectant.
− 403 systems in South Dakota will have to comply with Stage 2
regulations.
The requirements that apply to each system depend on
treatment process and type of source water.
Population-Based
Monitoring and Scheduling
• Stage 1 DBPR
– Scheduling based on source water type and
population served
– Monitoring based on source water type, population
served, and number of treatment plants/wells
• Stage 2 DBPR
– Scheduling based on source water type, population
served, and population of the largest system in combined
distribution system (CDS)
– Monitoring based on source water type and population
served (excluding CDS)
Combined Distribution Systems
(CDSs)
• All systems in a CDS (i.e., wholesalers,
consecutive systems) must comply with
Stage 2 DBPR requirements on the same
schedule
– Compliance date is based on the population of
the largest system in the CDS
– Largest system is not necessarily the wholesaler
• EPA or state has discretion to determine
CDS
– Emergency or seasonal connections
Consecutive Systems
• Must comply with IDSE requirements
• Must conduct Stage 2 DBPR TTHM
and HAA5 compliance monitoring
• Must comply with the Stage 1 DBPR
requirements for chlorine and
chloramines
Compliance Calculation
& Reporting
•
Stage 1
•
Stage2
•
Compliance Reporting for Stage 1 & 2
− Calculate compliance at the end of every quarter in which the system
monitors using the Running Annual Average (RAA) of results from the
last 12 months and compare to MCL
− Calculate compliance at the end of every quarter in which the system
monitors using a Locational Running Annual Average (LRAA).
 Systems must report a LRAA for every site they sample at and each
LRAA must be below the MCL.
− Within 10 days of the end of each quarter in which samples are taken,
report RAA or LRAA, MCL violations, and information about samples to
the state.
− Consecutive systems must begin complying with the Stage 1 DBPR
requirements for chlorine and chloramines beginning April 1, 2009. Each
system must submit a quarterly chlorine residual to the state within 10
days of the end if each quarter.
Stage 1 & 2 DBPR
MRDL & MCL
• MRDLs
Disinfectant
MRDL
Chlorine
4.0 mg/L
Chloramines
4.0 mg/L
Chlorine Dioxide
0.8 mg/L
Disinfection Byproduct
MCL
TTHM
0.080 mg/L
HAA5
0.060 mg/L
Bromate
0.010 mg/L
Chlorite
1.0 mg/L
• MCLs
Initial Distribution
System Evaluation (IDSE)
Options
IDSE Options
1
VSS
Waiver
2
40/30
Certification
Existing Data Only
3
Standard
Monitoring
4
System
Specific Study
New and Existing Data
Choose Stage 2 TTHM/HAA5 Sites for Compliance
Conduct Stage 2 Compliance Monitoring
LRAA
IDSE
Implementation Timeline
Submit 40/30
Submit IDSE Report
Certification, SM,
Complete SM or
(only systems
Sch. Systems Serving:
SSS Plan, or
SSS By:
conducting SM or
receive VSS
SSS) by:
Waiver by:
1
> 100,000
Oct. 1, 2006
Sept. 30, 2008
Jan. 1, 2009
2
50,000–99,999
Apr. 1, 2007
Mar. 31, 2009
July 1, 2009
3
10,000–49,999
Oct. 1, 2007
Sept. 30, 2009
Jan. 1, 2010
4
< 10,000
Apr. 1, 2008
Mar. 31, 2010
July 1, 2010
Schedule for systems in a combined distribution system is based on that
of the largest system in the combined distribution system
Very Small System (VSS)
Waivers IDSE Options
Eligibility Criteria
• Systems must
– Serve fewer than 500 people
– Have taken TTHM and HAA5 samples
Reduced monitoring acceptable
Operational data acceptable
• 137 systems out of an eligible 243 systems in
South Dakota have received their VSS Waiver
Note: EPA or the state may deny a VSS Waiver for any
reason, even if system meets all eligibility criteria
VSS Waivers
• Waivers effective immediately
− No application necessary
− Systems must meet all criteria
• EPA or the state can require Standard Monitoring or System
Specific Study
• VSS Waiver is only a waiver from additional IDSE activities
− No Standard Monitoring or System Specific Study Plan
− No IDSE Report
• Continue compliance with Stage 1 DBPR until Stage 2 DBPR
compliance begins
– Complete a monitoring plan for the Stage 2 DBPR
40/30 Certification
Eligibility Criteria
• Systems must have Stage 1 DBPR data equivalent to 8
quarters worth of data:
− No individual sample can have exceeded:
 0.040 mg/L for TTHM
 0.030 mg/L for HAA5
− No TTHM or HAA5 monitoring violations
− For schedule 3 and 4 systems data can not be before January 1,
2005
• Approximately 88 systems in South Dakota will be eligible for
a 40/30 Certification
Note: EPA or the state may deny the certification for any
reason, even if system meets all eligibility criteria
Operational Data
• EPA or the state may allow systems to use
operational data to qualify for certification
– Should be equivalent to Stage 1 DBPR data
• Considerations
– Samples taken and analyzed by approved
methods at a certified lab
– Adequate number of sample sites for system
size
– Samples taken at appropriate locations (average
to maximum residence time)
– Samples taken at appropriate frequency and
during month of warmest water temperature
Submitting a 40/30 Letter
• Once a system has collected a sufficient
amount of data it can prepare a 40/30
Certification Letter and submit it to the EPA:
– Electronically (through IDSE tool)
– Hard-copy (through mail)
 US
EPA-IPMC
PO Box 98
Dayton, OH 45401-0098
Example 40/30 Certification Letter
System Information
PWS Name_____________________ PWS ID:_______________________
Street Address:__________________ City, State, Zip:_________________
Population Served:_______________ Source Water Type:
 Ground 
Subpart H
System Type:  CWS  NTNCWS
Combined Distribution System:  Wholesale  Consecutive  Neither
Contact Person
Name:
_______________________Title: ____________________
Phone Number:__________________Fax Number (if available):____________
Email Address (if available):_______________________
Certification
I hereby certify that each individual Stage 1 DBPR compliance sample collected
from ________ to _______ was less than or equal to 0.040 mg/L for TTHM and
0.030 mg/L for HAA5. I understand that to be eligible, each individual sample
must be equal to or below these values. I also certify that this PWS collected
all required Stage 1 samples and did not have any monitoring violations
during this time period.
Signature:_________________ Date:______________________
Standard Monitoring
Standard Monitoring IDSE Steps
1
2
Select Standard Monitoring Locations
Prepare and Submit Standard Monitoring Plan
EPA or the state approves the Standard Monitoring Plan
3
Conduct Standard Monitoring
4
Select Stage 2 DBPR
compliance monitoring locations
5
Prepare and Submit IDSE report
IDSE Schedule for
Standard Monitoring
Sch.
1
2
3
4
Systems
Serving
> 100,000
50,000 –
99,999
10,000 –
49,999
< 10,000
Submit Plan
Complete
Monitoring
Submit
IDSE
Report
10/1/2006
9/30/2008
1/1/2009
4/1/2007
3/31/2009
7/1/2009
10/1/2007
9/30/2009
1/1/2010
4/1/2008
3/31/2010
7/1/2010
Schedule for systems in a combined distribution system is based on that of
largest system in the combined distribution system
Required Components of
Standard Monitoring Plan
• Distribution system schematic
– Entry points, sources, and storage facilities
– Locations and dates of proposed Standard Monitoring
sites
– Locations and dates of Stage 1 DBPR monitoring sites
• Population served
• Source water type
• Justification of Standard Monitoring sites
– Must include a summary of data used to justify
selection of Standard Monitoring sites
Standard Monitoring
Requirements
•
What, where, and how often do I monitor?
– Samples Collected
 Dual sample set (both TTHM and HAA5) collected at all locations
– Monitoring Locations
 High TTHM levels
 High HAA5 levels
 Average Residence Time
 Near Entry Points
– Number of sites
 Based on system’s source water type and population served
– Monitoring Frequency
 1, 4, or 6 monitoring periods during the year at each location
 Number based on population served and source type
TTHM and HAA5
(1)
Standard Monitoring
• For groundwater systems or systems that purchase groundwater
Population
< 500 consecutive
< 500 nonconsecutive
Frequency
(in year)
Total
Sites
Near
EP
ART
High
TTHM
High
HAA5
1 (during
peak
historical
month)(2)
2
1
-
1
-
2
-
-
1
1
2
-
-
1
1
6
1
1
2
2
8
1
1
3
3
500-9,999
10,000 – 99,999
100,000-499,999
4 (every 90
days)
(1) A dual sample set (i.e., a TTHM and an HAA5 sample) must be taken at each monitoring location
during each monitoring period.
(2) The peak historical month is the month with the highest TTHM or HAA5 levels or warmest water
temperature.
TTHM and HAA5
(1)
Standard Monitoring
•
For Subpart H systems and systems that purchase Subpart H water
Population
Frequency
Total
Near EP
ART
High
TTHM
High
HAA5
<500 consecutive
1 (during
peak
historical
month)(2)
2
1
-
1
-
2
-
-
1
1
2
1
-
1
-
2
-
-
1
1
4
-
1
2
1
8
1
2
3
2
16
3
4
5
4
<500 non-consecutive
500-3,300 consecutive
500-3,300
non-consecutive
4 (every 90
days)
3,301-9,999
10,000-49,999
50,000- 249,999
6 (every 60
days)
Standard Monitoring
Site Selection – Justification
• Plan must include a justification for the
selection of sites to be sampled during
Standard Monitoring
• Data sources and tools
– Distribution system maps
– Water quality data
– Distribution system operating data
Final “Selected” Sites
• Some site selection will be obvious
– Near entry point
• Others will require professional judgment
– Consider geographic representation
– Consider hydraulic representation
– Consider areas fed by sources with higher DBP
precursors
– Use sites that “multi-task”
– Consider accessibility
Submitting
Standard Monitoring Plan
• Once the system has collected and
analyzed its information, it must
prepare the plan and submit it to EPA
or the state
– Electronically (through IDSE tool)
– Hard-copy (mail to IPMC address)
• Must include required information
System Specific Study (SSS)
Stage 2 Compliance
Monitoring Schedule
Sch.
System
Serving:
Start Stage 2 Compliance
Monitoring By:
1
> 100,000
April 1, 2010
2
50,000 –99,999
Oct. 1, 2012
3
10,000 –49,999
Oct. 1, 2013
< 10,000
Oct 1, 2013
Oct 1, 2014*
4
* Date for systems that were required to conduct Crypto monitoring under LT2
Questions?
Information Processing &
Management Center (IPMC)
and Data Collection &
Tracking System (DCTS)
Information Processing and
Management Center (IPMC)
• What is the IPMC?
− It’s a centralized location to process hard copy
Stage 2 DBPR & LT2ESWTR submissions
• What is the Goal of the IPMC?
− To conduct administrative tasks such as data
entry and mail distribution for the Regions and
states
− Have one mailing address that would process all
the Stage 2 DBPR & LT2ESWTR submissions
What can be submitted to
the IPMC?
• For Stage 2 DBPR:
– 40/30 Certifications
– Standard Monitoring Plans
– System Specific Study Plans
Extensive Data
Hydraulic Modeling
• IDSE Reports
IPMC Contact Information
• The IPMC will receive, sort, scan, & perform
data entry for Stage 2 DBPR and
LT2ESWTR submissions into the DCTS.
Mailing Address:
Stage 2 DBPR &
LT2ESWTR IPMC
P O Box 98
Dayton, OH 45401
Fax Number:
937-586-6557
E-mail Address:
[email protected]
Data Collection & Tracking
System (DCTS)

What is the DCTS?
– It’s a database that will track and store
Stage 2 DBPR and LT2ESWTR early
implementation submissions
– For Stage 2 DBPR, gives you access to
the online IDSE tool
Develop and submit your 40/30 Certification
or IDSE Plan or Report online
Accessing the IDSE Tool
• There are many ways to access the IDSE Tool
– Online
 CDX username and password required
 Submit information electronically to EPA
– CD Version
 Download or request from EPA warehouse
 E-mail, fax, or mail information to EPA
– Hard Copy Template
 From IDSE Guidance Manual
 Fill in template by hand
 Mail information to EPA
Accessing the IDSE Tool

Both the online and the CD version of the
IDSE Tool have access to the Wizard and
the Plan/Report Entry feature
– Wizard determines which IDSE option is best for
the system
– IDSE Plan/Report Entry feature creates custom
forms for the selected IDSE option and helps the
system complete electronic forms
Accessing DCTS
• There are two ways to register for DCTS:
– Using a CRK key
EPA began distributing CRK keys to PWSs in
Summer 2006 (according to system schedule)
– Via the CDX Web site
Access Request Process for
Individuals With a CRK Key
• What is a CRK Key?
– User name and password that allows first time
users to login to the DCTS if the user does not
already have access through other applications
• Who will receive a CRK Key?
– Administrative users (the first user associated
with an organization) will receive the CRK Key in
the mail
– Do not change provided user name to ensure
pre-registration works!
User Approval within DCTS
• Administrative users in each organization will
be responsible for approving all standard
users
– Admin user must be registered before others can
use the DCTS for their organization
– Some admin users may be linked to more than
one organization (e.g., DCTS users with multiple
PWSs)
 Commonly used by those who work for a PWS
organization
CRK Access
Go to: http://cdx.epa.gov/preregistration
What if I Did Not Receive
a CRK Letter and Need to
Register?
Access Request Process
We recommend that you use the Registration
Guide (sent with email handout)
Go to https://cdx.epa.gov
Access Request Process
Steps for New DCTS Users with No CRK and
No Previous Interaction with CDX:
• Step A
– Apply for access via EPA’s CDX Web site
• Step B
– Read and sign the warning notice, privacy
statement, and terms and conditions
– Fill out User and Organization information
• Step C
– Select: “LT2ESWTR: LT2ESWTR, Stage 2 DBPR,
and IDSE Plan/Report Entry” from the list of CDX
applications
Add Program:
Step C for All Users
Access Request Process
Steps for New DCTS Users with No CRK:
• Step D: Select
–
–
–
–
–
Role Dropdown Menu: “A Submitter”
Program ID Type: “Standard”
ID Field: Enter your PWSID
Submission Method Dropdown: “WEBFORM”
Click Finished
• Step E
– Application will be verified and approved
• Step F
– Once approved, you’re my CDX page will have a link to
DCTS; click link to enter DCTS
DCTS Quick Guide
to Logging In for PWSs
• For more detailed
information, refer to
the DCTS Quick Guide
• http://www.epa.gov/ogwdw
/disinfection/tools/pdfs/instr
uctions_mdbp_dcts.pdf
• Please send questions to:
[email protected]
Questions?
IDSE Tool Wizard
Overview
IDSE Tool: Purpose
• Helps you determine which IDSE
option is best for your system
• Guides you through templates, using
the IDSE guidance manual excerpts to
explain requirements
• Generate an electronic file for your
system to submit and keep on file
IDSE Tool: Information
• The IDSE Tool is comprised of two
modules
– The Wizard
– Plan/Report Entry
General Information - Wizard
• The Wizard – Walks you through a series of
questions that will help you determine:
– If your system has any IDSE requirements
– Appropriate IDSE compliance option for your
system
– The specific requirements for your system
determined by its schedule and IDSE
compliance option
IDSE Tool – CD Version
• EPA also developed a CD version of the
IDSE Tool
– Target audience of IDSE Tool CD Version:
 Systems that do not have access to the internet
 Systems serving fewer than 10,000
 Systems serving more than 10,000 may use the CD,
but may need to get additional forms (e.g., to list all
monitoring sites
– Limitations:
 May not submit electronically
 No pre-populated categories
 Will not auto-generate monitoring tables
IDSE Tool
Demonstration
IDSE Tool – CD Version
• To obtain the CD Version
– Visit the Stage 2 DBPR Web site:
http://www.epa.gov/safewater/disinfection/t
ools/tools-idse.html
– Contact the EPA Warehouse: (202)260-3103
– E-mail [email protected]
Questions?