COMMUNITY DEVELOPMENT BLOCK GRANT

Download Report

Transcript COMMUNITY DEVELOPMENT BLOCK GRANT

MAINE COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG) PROGRAM
MRWA 2013 ANNUAL CONFERENCE
PUBLIC INFRASTRUCTURE PROGRAM
• The funding comes from the federal Department of
Housing and Urban Development (HUD).
• For 2014 we have allocated $2,700,000 for Public
Infrastructure Grants.
• It is a competitive process.
• As “Entitlement Communities” Auburn, Bangor,
Biddeford, Lewiston, Portland and all of
Cumberland County with the exception of
Brunswick and Frye Island, are not eligible to receive
State CDBG program funds.
WHO CAN APPLY?
• Units of General Local Government (UGLG).
• The town applies on behalf of the Water District,
Sewer District, Utility District, etc.
HOW DO WE APPLY?
• It’s a two-stage process.
• Step one-Letter of Intent (LOI) is due in our office by 4:00 PM
on Friday, January 17, 2014. This is an e-mail process.
([email protected])
• Step two-If your LOI is approved you will be invited to submit
a full application which is due in our office by 4:00 PM on
Friday, March 7, 2014.
• Award Announcements are typically made about 5-7
weeks after the application due date.
WHAT IS THE POINT OF THE LOI?
• To determine if;
• The project meets the national objective of benefiting low
to moderate income people (in accordance with 24 CFR
Sec. 570.483)
• The project activities are eligible under the Housing and
Community Development Act (in accordance with 24 CFR
Sec. 570.482)
• The project complies with Maine’s PL 776, regarding growthrelated capital investment.
IS THE TARGET AREA ELIGIBLE?
SURVEY SAYS . . . . .
• For Public Infrastructure: greater than 51% of the
households in the target area must have annual
income that is less than 80% of the county median
income.
• You must provide OCD with materials from your
income survey completed using HUD approved
methodology, and that has been reviewed and
approved by the Regional Planning Commission.
IS THE PROJECT ELIGIBLE?
Eligible activities in the PI Program are:
Acquisition of utility right of ways, construction,
reconstruction/rehab, and installation.
Public infrastructure limited to supporting construction
of fully-funded affordable LMI housing.
Eligible planning activities necessary to complete the
Project Development Phase.
A CASH match of 25% of the
grant award is required.
TWO ACTIVITY GROUPS
Activity Groups:
1. Water system installation/improvements, sewer system
installation/improvements, water/sewer system hookups,
storm drainage, utility infrastructure, dams with the main
purpose of providing the primary water storage facility for
an active water district or municipal system. Maximum Amount:
$1,000,000
2. Infrastructure in support of new LMI affordable fully financed
housing.
Maximum Amount: $1,000,000
WHERE ARE THE FORMS? MEOCD.ORG
WHAT DO I NEED FOR THE
APPLICATION?
•
•
•
•
Cover Sheet with original signature;
Activity Designation Sheet;
Application Page;
Responses to the Impact, Development Strategy,
and Citizen Participation sections. (You may only
use the three pages provided.);
FIRM COMMITMENT OF MATCH
Matching Funds Table with attached letters of
commitment; A CASH match of 25% of the
grant award is required.
Funding Source
Grant/Loan
TOTAL: $
Amount
Terms of borrowing
or bond sale
PROJECT BUDGET
Column 1
Cost Category
Land Acquisition
Legal Expenses
Appraisals
Relocation
Demolition
Site Work
Architectural
Engineering
Administration
Construction
Materials
Equipment
Inspection
Other (List)
1.
2.
3.
TOTAL COSTS
CDBG
Column 2
Local
Column 3
State
Column 4
Utility
Column 5
NonCDBG
Federal
Column 6
Other
Column 7
Cost
Category
Total
PUBLIC HEARING
Public Hearing Notice
The City/Town of _________________
The City/Town of _________________ will hold a Public Hearing on
(date) , at
(time) , at the
(location) to discuss an application being submitted to the State of
Maine CDBG program for a (specific name of grant program) . The purpose of
the grant application is to state purpose). Public comments will be solicited at this
Hearing and will be submitted as part of the application. All persons wishing to make
comments or ask questions about the grant application are invited to attend this
Public Hearing. Comments may be submitted in writing to: (name of contact,
address) at any time prior to the Public Hearing. TDD/TTY users may call (list local
TTY number or 711) . If you are physically unable to access any of the City’s/Town’s
programs or services, please call (list local contact and phone number), so that
accommodations can be made.
Any applicant submitting a non-compliant public hearing notice will have five points
deducted from their final application score.
ENGINEERING REPORTS
• Mandatory professionally prepared engineering
and/or health/safety report documenting conditions
which warrant the project; and
• Mandatory engineering design report and cost
estimates.
IF I HAVE QUESTIONS?
• Terry Ann Holden
• (207) 624-9814
• 111 Sewall Street
• 59 State House Station
• Augusta ME 04333-0059
[email protected]