Compliance regime of the Convention on Long

Download Report

Transcript Compliance regime of the Convention on Long

PM work plan under the
Convention on Long-range
Transboundary Air Pollution
Henning Wuester
Secretariat of the United Nations Economic Commission for Europe
http://www.unece.org/env/lrtap (for general information)
http://www.unece.org/env/tfiam (for the Task Force)
Intergovernmental bodies, expert groups
and scientific centres under the Convention
Executive Body
Working Group on
Effects
EMEP
Steering Body
Implementation Committee
Working Group on
Strategies and Review
ICP
Forests
TF
Programme
Coordinating Centre
TF
Emissions Inventories
and Projections
Ad hoc
expert group
on ammonia
ICP
Integrated Monitoring
TF
Programme
Centre
TF
Measurement
and Modelling
Ad hoc
expert group
on POPs
Chemical
Coordinating
Centre
TF
By-products
HMs and POPs
ICP
Mapping
TF
ICP
Materials
TF
ICP
Vegetation
TF
ICP
Waters
TF
TF
Health
Coordination Centre
for Effects
Main Research
Centre
Programme
Centre
Programme
Centre
Meteorological
Synthesizing
Centre-West
Meteorological
Synthesizing
Centre-East
TF
Integrated
Assessment Modelling
Centre
Integrated
Assessment Modelling
Tentative timetable for work on PM,
adopted by EMEP: The basis
Broad timing:
Aimed at supporting the review of the Gothenburg Protocol
in 2004.
2003 reserved for testing and sensitivity analysis
Results of specialized studies and new data should be
available by 2002
2001 for preparatory work
 Coverage: acidification, eutrophication, ozone and exposure to
fine particles involving SO2, NOx, VOCs, NH3 and the various
species of particulate matter. Linkages to climate change
policies. Here: only PM-relevant parts
Tentative PM timetable: contributors
EMEP (CCC, MSC-W, CIAM, TFIAM, TFMM,
TFEIP) covers:
atmospheric modelling,
monitoring,
emissions & projections,
abatement costs,
integrated assessment modelling
Input from:
other bodies under the Convention (effects) and
work done by EEA and the EC
national contributions by Parties
Tentative PM timetable: Atmospheric
modelling
Autumn
2000
Preliminary PM model
MSC-W
2001
Workshop on modelling aerosol
dynamics
MSC-W with Univ.
Helsinki et al.
Study on regional PM transport
MSC-W with …
Workshop on Hemispheric modelling
MSC-W & CIAM, hosted
by Canada & US
Workshop on rural-urban linkages and MSC-W, hosted by
O3 limiting factors
Switzerland
2002
Study/workshop on urban modelling
EMEP ?, funded/hosted
by CAFE (?), …
Final 50x50km source-receptor
matrices
MSC-W
Tentative PM timetable: Monitoring
Autumn
2000
Preliminary PM monitoring strategy CCC/TFMM
2001
Monitoring plan for compliance
TFMM, TFEIP, TFIAM
Workshop on urban air quality
TFMM, EIONET,
funded/hosted by EEA
Tentative PM timetable: Emissions
and projections
2000
Preliminary PM inventory
(CEPMEIP)
2001
Review of PM estimates by Parties All Parties, coordinated
by MSC-W, CIAM
2002
MSC-W, TNO,
funded/coordinated by
EMEP, EEA, CH, NL
Reporting guidelines
MSC-W, CIAM, TFEIP
Reporting of 2000 PM emissions
All Parties
Review of emission trends
MSC-W, CIAM
Final PM inventory, projections for
modelling
All Parties coordinated
by MSC-W and CIAM
Tentative PM timetable: Abatement
options and costs
Autumn
2000
Workshop on abatement potential
and costs
CIAM, TFIAM, funded
by Germany
2001
Preliminary PM cost curves
CIAM
2002
Study on new abatement options
TFIAM, EIPPCB, …
Study on costs and instruments for
structural change
TFIAM, …
Review of PM cost curves
All Parties, coordinated
by CIAM
Analysis of side-effect for CD, Pb,
PAH/BaP
CIAM, MSC-E
2003
Tentative PM timetable: Effects
2001
2002
Workshop on the measurement
and economic valuation of health
effects
NEBEI, TF Health,
hosted by UK
Workshop on biodiversity
indicators
CCE, TFIAM
Review of new PM effects data
TFAIM, TF Health,
WHO, US, EC
Workshop on health impacts
indicators
TFIAM, TF Health, …
Final benefits module
NEBEI, ICPs, TF
Health, TFIAM
Tentative PM timetable: Integrated
assessment modelling (1)
Autumn
2000
Preliminary modelling framework
CIAM
2001
Preliminary reduced form model
MSC-W, CIAM, TFIAM
2002
Interface to urban scale model(s)
CIAM, TFIAM, CAFE (?)
…
Update of base year emissions,
CIAM, TFIAM
update of modelling framework and
2010, 2015 and 2020 scenarios
Workshop on shipping emissions
CIAM, MSC-W, TFIAM,
BARCOM, …
Tentative PM timetable: Integrated
assessment modelling (2)
2003
2004
Test of scenario analysis, sensitivity runs
CIAM, TFIAM
Workshop on uncertainty management
TFIAM, …
Workshop on national IAM experiences
TFIAM, …
Application of the model for policy
discussions by the Working Group on
Strategies and review
CIAM, TFIAM
Tentative PM timetable: summary
2000
2001
Monitoring
P
F
Atmospheric modelling
P
F
Emissions/projections
P
F
Health impacts
P
Techniques/costs
P
Integrated assessment
modelling
P – preliminary, F - final
P
2002
2003 2004
F
F
F
Tentative PM timetable:
summary
2000
Atmospheric
modelling
Measurements
P
Emissions
projections
Techniques/ costs
P
P
2002
2004
F
F
P
P
2003
F
P
Health impacts
IAM
2001
F
F
overview
F