Transcript Slide 1
Virginia e-WIC Kick-off Meeting June 14, 2011 Page 1 Agenda – Day 1 – AM Time 10:00 – 10:15 Topic Welcome Facilitator Facilitator: Opening Comments 10:15 – 10:30 Introductions 10:30 – 11:45 Solution Overview EPPIC e-WIC Solution Overview Network Solution Overview Account Setup Overview Retailer Settlement Overview 11:45 – 12:00 Break/Pickup Box Lunches Working Lunch 12:00 – 1:15 12:00 – 12:45 Project Overview Page 2 Facilitator: Summary of Project Objectives Summary of Scope Project Success Criteria and Benefits Role Definition Communication Structure Retailer Enablement Facilitator: Agenda – Day 1 – PM Time Working Lunch 12:00 – 1:15 12:45 – 1:15 Project Timeline 1:15 – 3:00 3:45 – 4:15 4:15 – 4:45 Page 3 Facilitator: Facilitator: Overview Wrap up Facilitators: Requirements Process Requirements Validation Sessions Requirements Management Methodology Artifacts ACS Test Methodology Facilitator: Critical Assumptions, Risks, & Dependencies Deliverable Submission Review Cycles Acceptance Criteria Milestones and Deliverables Change Management Process Overview Break Requirements Validation and Methodology Facilitator Wall Walk Project Management 3:00 – 3:15 3:15 – 3:45 Topic Upcoming Events Decision Points Takeaways Facilitator: Opening Comments ACS Senior Vice President and Managing Director ACS, a Xerox Company State Enterprise Solutions (SES) Page 4 Introductions ACS Corporate Oversight Senior VP and Executive Director Electronic Payment Services Delivery Center Vice President Government Solutions Payment Services Group Delivery Center Director Card Services Program/Project Manager Implementation Product Manager Manager WIC SME Technical Coordinator TBD Deputy Program Retail Manager Manager Technical System Lead Electronic Payment Group Delivery Center – Technical and Operations Team Page 5 System Test Mgr Solution Overview ACS Technical Coordinator Page 6 Project Overview ACS Program/Project Manager Page 7 Summary of Project Objectives • In parallel with the implementation of the new Crossroads MIS system, replace the current paper-based method of issuance and redemption with a leading edge online e-WIC system that allows participants more flexibility with their shopping experience while reducing the stigma typically associated with paper checks. – Coordinated development of e-WIC system and the Crossroads MIS system – Develop the proper interfaces and provide technical services to support Virginia e-WIC – Integrated testing and implementation with the Crossroads MIS system – Retailer enablement, integration and certification – Compliance with the Technical Implementation Guide, Operating Rules and Universal Interface Specification Page 8 Summary of Project Scope Virginia e-WIC • In scope • • • • • • • Page 9 System Requirements, Business Requirement Document, Interface Control Document and Functional Specification Document Development of real-time interfaces with the Crossroads MIS system User Acceptance Testing (UAT) training and support Train the Trainer training and support • Coordinated training with Crossroads team • Commonwealth staff training for reports and administrative terminal • Automated Response Unit (ARU) training and participant training materials Retailer enablement • Stand beside POS installation and training • Retailer integration support • Third Party Processor (TPP) retailer support for Kentucky shared retailers Pilot implementation and full e-WIC project rollout support Ongoing operation of the e-WIC system Project Success Criteria and Benefits • • Success Criteria: – Successful requirements and design documents approval – Successful completion of UAT approved by Virginia Department of Health (VDH) and USDA Food and Nutrition Services (FNS) – Successful pilot – Successful full e-WIC project rollout Expected benefits: – Seamless integration with Crossroads MIS system – Flexibility in benefit redemption for participants – Reduced stigma for participants – Improved transaction processing for retailers – Stronger reporting capabilities – Improved agency and clinic efficiency allowing a greater focus on nutrition education Page 10 Project Roles Role ACS Program/Project Manager Assigned To Assignment Specifics • Single point of contact for VDH • Customer-facing delivery management role that ensures the contract obligations are tracked and customer relationships are maintained. • Primary contact and manager of deliverables submitted to VDH as well as coordinator of all meetings with VDH. ACS Technical Coordinator • Works closely with VDH Project Managers. • Participates in kickoff meeting as Technical Coordinator representing ACS as technical Subject Matter Expert and primary technical resource. • Technical lead and facilitator of the Requirements Validation sessions (RV). ACS Implementation Manager • Ongoing primary technical resource and subject matter expert for project. • Develops, Maintains and Tracks the overall technical project plan from project initiation through project implementation completion. • Major activities include resource management, schedule management, cost management, critical path management, quality management, risk management, issue management and action management. Page 11 Project Roles (cont.) Role ACS Business Analyst Assigned To Assignment Specifics • Owner/lead of the Requirements Phase and Processes. • Ensures RFP Requirements are captured, validated and refined into Business Requirements and Functional Specifications/Technical Requirements. ACS Product Manager • Works closely with the Implementation Team Manager to ensure requirements issues are addressed and resolved timely, and that review/approval timelines are agreed upon to ensure timely completion of the requirements phase and start of development. • Ensures definition of the strategic content of the product. • WIC Subject Matter Expert, will support project kickoff and Requirements Validation Sessions with the Commonwealth. • Will engage in requirements reviews as needed. ACS Retail Manager • Ongoing resource for project. • Leads retailer enablement efforts. • Will manage scheduling and installation efforts of e-WIC point of sale devices. • Coordinates retailer meetings. Page 12 Communication Structure ACS Technical Coordinator Requirements Validation Facilitator Technical resource Solution expert ACS Implementation Mgr Status Risks, Issues, Actions ACS Business Analyst Requirements Validation, Requirement Deliverables, and clarifications / questions Page 13 ACS Program/Project Manager Primary communicator with VDH: •Deliverable delivery •VDH review communications •Project status •Risk, Issue, Action tracking •All VDH/ACS meeting content, agendas, minutes Virginia Department of Health VDH Project Manager Sylvia Mitchem VDH EBT Coordinator Natasha Miller Retailer Enablement ACS works with retailers to provide a solution that best meets their needs • • • • • • • Coordinated efforts by ACS with retail service providers and third party processors provide many retailers with the option of integrating with their existing system Direct connect POS devices and an integrated direct connect option provides savings to retailers that choose those options Retail Manager, Ed Yorkavich coordinates enablement efforts and provides strong support for retailers The Retailer Portal provides instant access to transaction and settlement reports 24/7 retailer helpline is provided to answer questions and/or troubleshoot issues Integration support for testing and certification. Currently certified with several TPPs and Electronic Cash Register (ECR) systems. Retailer Benefits • • • • • Faster settlement, usually within 24 hours System approves only prescribed WIC items (fewer errors) Fewer administrative tasks i.e., no batching paper, no retailer stamps, no rejected checks Reduced risk of non-compliance and/or program violations Reduced training for personnel, less time to train cashiers Page 14 Project Timeline ACS Implementation Manager Page 15 VA WIC Wall Walk May June July SEE Aug Sept PPR Kickoff Meeting RV BRD Oct Nov SDR ICD Use Cases DDR Dec Jan Feb Mar TRR Approval of Final Design Report Specs Approval of Final Test Plans Project Planning Siebel BRD / ICD / Use Cases Design PSG Development, Unit Test, Integration Test Test Planning System Testing Regression Testing Networking Hardware & Telecom Installation and Testing Siebel Design Siebel Development Unit Test Integration Testing Crossroads / EPPIC Integration Testing VA WIC (Crossroads) Req. / Design VA WIC (Crossroads) Development/System Testing LOB Retailer/TPP Certification FNS Cert IVR Planning CSI IVR Call Flow Updates CSI Call Flow Approvals IVR Development Setup Integration Testing Retailer Outreach (i.e. survey and pre-cert efforts) EPS Page 16 RAPS/AIMS Requirements and Design Deploy CSI solution Call Center Training - Install/Train Pilot Retailer/Client POS RAPS/AIMS Testing and Deployment Retailer Call Center Go Live Commonwealth Approvals Project Toll Gates VA WIC Wall Walk (cont.) 2012 Mar April May June July PRR Aug Sept Oct ORR Nov Dec PCR PSG User Acceptance Testing and Report Validation Pilot Operations LOB Statewide Operations UAT / Pilot Support CSI Install/Train State POS (Stand-Beside) EPS Page 17 Client Outreach Client Call Center Go-Live Retailer Outreach Project Management ACS Program/Project Manager ACS Implementation Manager Page 18 Critical Assumptions • • • • • • • • VDH will ensure coordination with Crossroads team for support of design, development and test phases (Crossroads integration) VDH will ensure coordination with Crossroads team to review ICD documents as applicable VDH will provide UAT test data Deliverables will be approved according to agreed upon review cycles Approvers will be named, available, and participating as needed Assigned VDH Staff will be available and coordinate with the Crossroads team when required by the work plan VDH is responsible for gathering and providing feedback on requirements from FNS to ACS. The timeline must include any review by FNS if content is expected to be included in the baselined requirements. Page 19 Dependencies on VDH • • • • • • • • • • Infrastructure Review PC for Administrative Terminal FTP Server Firewall Setup/Configuration VDH Data Center for circuit installation Router (ACS will assist with setup) IT Telecom Questionnaire (ACS to provide) Outreach to clinics, cardholders, government offices and officials Timely review and approval of deliverables as outlined in the work plan User Acceptance Testing support Page 20 Risks • • • • • • Inherent schedule flaws due to unknowns prior to entering each phase Increase in requirements during Plan and Design Change in project assumptions and/or requirements Extended review and approval of deliverables Concurrent development cycle with Crossroads Additional Modifications to Universal Interface Specifications, WIC Operating Rules and Technical Implementation Guide Page 21 Deliverable Submission • Document Submission: – – – – – – Document will be delivered by the BA to the ACS Program/Project Manager for submission to the VDH e-WIC Project Manager Document will be delivered via email Document will include the name of the document followed by v.0x DRAFT to indicate that it is a draft document under review Document revision history will reflect the date, author and relevant notes when submitted Document will be submitted by end of the day ’12-midnight’ according to the deliverable milestone ‘day’ agreed to that triggers the review cycle Midpoint through a review cycle, the ACS project team or VDH may request or agree to a review to discuss any questions or critical feedback as to not delay any initial understanding of the document or impact the remaining assumptions during the review Page 22 Proposed Review and Approval Cycles • Requirement Deliverables – 10/5/2 • Initial 10 day Commonwealth review (BRD, ICD’s and larger documents) • 5 business day ACS BA review/doc update • 2 days of final review and Commonwealth approval/sign off – 5/2/2 (Functional Specs, Screen Mock-Ups, Report Specs etc) • Initial 5 day Commonwealth review • 2 business day ACS BA review/doc update • 2 days of final review and Commonwealth approval/sign off Page 23 Acceptance Criteria • Acceptance suggestions: – – – – – – Approved ‘as is’ (no updates required) Approved with minor modifications (no major issues, open items) Not Approved – Scope or major issues identified, update and re-review required Acceptance/Approval is requested to be via email approval from the approvers identified during Requirements Validation. The above assumes all comments from both Commonwealth and FNS are obtained in the acceptance. Commonwealth is responsible for gathering and providing FNS’ comments, or acting as the ‘proxy’ approver in their acceptance Acceptance/Approval should be focused on material requirements content and questions related to completeness, validation and accuracy related to system functionality as discussed/agreed to during Requirements Validation etc. Grammatical or other minor corrections/agreed upon updates should not prevent a document from being accepted/approved. Page 24 Sample Review Form Review Details Document Name: [Specify Document Name] Page # Section Review Comment Document Name: [Specify Document Name] Page 25 Action (to be completed by BA) Document Updated/Resolution? VA e-WIC Deliverables Milestone Schedule Deliverable Due Date based on RFP Status Initiation Meeting Agenda 6/12/2011 Complete Initiation Meeting Materials 6/12/2011 On Track Requirements Validation Meeting Materials 6/23/2011 On Track Requirements Validation Meeting Agenda 6/25/2011 On Track Initiation Meeting Report 6/21/2011 On Track Requirements Validation Meeting Report 7/4/2011 On Track Project Work Plan 6/28/2011 On Track Project Management Plan e-WIC / MIS Interface Specification Document (ICD) Integrated Retailer Interface Specification Document 7/14/2011 On Track Requirements Specification (BRD) 8/15/2011 Not Started New WIC Card Design 8/15/2011 Not Started Functional Design Document 8/29/2011 Not Started Retailer Enablement Plan 8/29/2011 Not Started Retailer Enablement Assessment Report 8/29/2011 Not Started Integrated Retailer Certification Test Scripts 8/29/2011 Not Started Detailed Design Document 9/28/2011 Not Started Settlement and Reconciliation Manual 9/28/2011 Not Started Page 26 7/30/2011 Not Started 7/30/2011 Not Started June July August SeptemberOctoberNovemberDecember January February March April May June VA e-WIC Deliverables Milestone Schedule (cont) Deliverable Due Date based on RFP Status Interface Test Scripts 10/15/2011 Not Started Implementation Plan 10/28/2011 Not Started Comprehensive Training Plan 10/28/2011 Not Started e-WIC Security Assessment 11/27/2011 Not Started Capacity/Scalability Plan 11/27/2011 Not Started Test Plan 11/27/2011 Not Started Security Plan 11/27/2011 Not Started Continuation of Business Plan 11/27/2011 Not Started Operations Manual 11/27/2011 Not Started Contract Transition / System Conversion Plan 11/27/2011 Not Started Clinic Enablement Plan 12/15/2011 Not Started User Acceptance Test (UAT) Scripts 1/15/2012 Not Started Reports Manual 1/16/2012 Not Started Administrative Terminal Manual 1/16/2012 Not Started Training Materials 1/16/2012 Not Started Cardholder Training Pamphlet Cardholder Training Automated Response Unit (ARU) Script 1/16/2012 Not Started 1/16/2012 Not Started Retailer POS User’s Manual 1/16/2012 Not Started Retailer Tips Card 1/16/2012 Not Started e-WIC Train-the-Trainer Manual 1/16/2012 Not Started Virginia WIC State Agency Staff e-WIC Manual 1/16/2012 Not Started Page 27 June July August SeptemberOctoberNovemberDecember January February March April May June VA e-WIC Deliverables Milestone Schedule (cont) Deliverable Due Date based on RFP Status Demonstration Report 2/15/2012 Not Started VA Sign-off on Functional Demonstration Report 3/1/2012 Not Started VA Approved Functional Demonstration Report 3/5/2012 Not Started VA with Certification of Readiness for UAT 3/10/2012 Not Started Final System Testing Report 3/15/2012 Not Started Consortium Review and Signoff of UAT Report 3/15/2012 Not Started Retailer Enablement Acceptance Report 3/31/2012 Not Started VA Certification of Readiness for Pilot Report VA Acceptance of Pilot Readiness Assessment Report Final Go / No-Go Decision to Proceed to Pilot Operations 5/15/2012 Not Started Interim System Testing Reports 6/15/2012 Not Started 7/15/2012 Not Started ongoing Not Started TBD Not Started Bi-weekly Status Calls / Agendas / Notes varies ongoing Bi-weekly Status Reports varies ongoing Clinic Enablement Assessment Report varies Not Started Clinic Enablement Acceptance Report varies Not Started Training Acceptance Report Page 28 June July August SeptemberOctoberNovemberDecember January February March April May June July Change Management Overview • The Change Management Process is a systematic approach to managing impact to cost, scope, schedule, and quality during a project – Requests for changes to any approved item will be managed via the Change Management process VDH submits Change Request to ACS Project Manager May be submitted by VA e-WIC Project Manager or other preset arrangement Page 29 ACS performs Impact Assessment on Change Request Standardized process utilized to determine cost, schedule, and other impacts to the project ACS submits and reviews Impact Assessment with VDH Results of Impact Assessment provided to facilitate VDH decision on Change Request VDH either approves or rejects the Change Order If approved, the project baseline is revised – if rejected, the Change Request is closed Requirements Validation Sessions & Requirements Methodology Overview ACS Implementation Manager Page 30 Requirements Process – A Closer Look • Value & Goals of the Requirements Workshop & Requirements Phase • The BA role & SME expectations • Requirements Methodology & Management Process • Artifacts, Reviews/Inspections & Approvals Page 31 Methodology Value Points 1. Represents Industry Best Practices/Standards and CMMI Advancement Goals 2. Methodology has been proven through reduction of missed/invalid requirements by approx. 50% in the last 1.5 years in various EPS Client Implementations 3. Supports Upfront Quality and Ongoing Requirements Validation throughout the Requirements Phase 4. Supports Incremental Development and Testing more seamlessly 5. Allows for more contained and shorter client stakeholder review/approval timeframes Page 32 Requirements Validation Sessions & Requirements Phase Goals • To define ‘the what?’ • To validate critical requirements/system functionality and any ‘gaps – enhancements/detailed rules etc’ to existing functionality • To clearly identify Open Issues/Follow Up items with accountable owners and due dates that impact resolution of requirements • To ensure completeness, accuracy and agreement of business ‘system’ requirements gathered across key ACS and VDH stakeholders and SMEs that will be designed, developed and delivered in the final solution that meets The Commonwealth’s business needs and objectives Page 33 Artifacts – Gap Analysis : Documentation of gaps and further details refined from the RFP and based on WIC core product solution from the Requirements Sessions Note: This is not an approved document, but captures Validated Req’s, Actions, and Open Items that may require further discussion. – Interface Inventory – Teams identify all ICDs, systems, and frequency. This is an inventory only that goes in the BRD. – BRD – Business Requirements Document, Represents High Level Functional and Non-Functional System Requirements and Interfaces. (NOTE: it does not include operational requirements) VALUE: the BRD is the document that locks down the ‘system scope’ of the project. • Page 34 BRD Inspection: Review and approval/sign off from key Commonwealth and ACS stakeholders. Once approved by the Commonwealth and ACS Technical team, it is base-lined as Version 1.0. Artifacts – Detailed Requirements: ICD’s, Report Specifications and Functional Specifications including: Use Cases, Business Rules, Screen Mock-Ups, Data Fields, Error/Dialog Message, Report Specifications (traced to higher level business requirements in the BRD) VALUE: These are the artifacts that Development, Quality Assurance (QA), and UAT teams design, develop and write test and UAT scenarios from, thus it is critical these are correct, to ensure quality delivery and what is expected of the client. • Page 35 Detailed Requirements Inspection: Review and approval/sign off from key Commonwealth and ACS stakeholders; Identified documents are baselined as Version1.0 once approved by Commonwealth and ACS Technical teams. Artifacts • Requirements Traceability Matrix (RTM): – Traces Requirements from RFP to BRD, Detailed Specifications, Design Documents and Test Cases. • RTM: Updated as each deliverable artifact is completed, reviewed, and baselined by ACS, This document can be provided to the Commonwealth as a tool to reference requirements from the BRD to their locations in other documents. Note: This is not a formal deliverable and thus is not subject to formal review/approval. Page 36 Commonwealth SMEs Availability & Time Allocation • Requirements sessions and the requirements phase of the project require a high concentration of time and attention by all critical subject matter experts and reviewer/approver stakeholders • WIC Policy/Operations SME: provide subject matter knowledge, documentation and validation of the Commonwealth’s operational process and the related functional requirements and/or gap details and rules to ensure requirements gathered are accurate • Technical SME: provide information to ACS technical team for technical functionality, such as file transfer management, non-functional requirements, and other technical requirements to fulfill the project • Assumptions: – Assigned VDH Staff will be available when required by the work plan. – Approvers will be named, available, and participating. – Time allocation historically has shown that reviews and collection of feedback may take anywhere between approx. 4 – 10 hours a week during the critical review cycle depending on the size of the document; • i.e. a BRD review over 2 weeks may take 16 hours for review and approval. Page 37 Wrap Up Page 38