Transcript Modifying the Interconnection thermal shields
Modifying the interconnection thermal shields during LS1.
Graeme Barlow - TE-MSC-CMI 1
• Why are we modifying the thermal shields?
Welds to cut
Courtesy A.Musso
Graeme Barlow - TE-MSC-CMI 2
The shields after modification.
Clamp Hinge Braids Graeme Barlow - TE-MSC-CMI Snap fastener Courtesy A.Musso
3
Procurement of the parts.
• • • • • • • 1900 Clamps A.Musso
1900 Hinges 3800 Latches 4000 Braids A.Musso
48000 Rivets 6000 Screws 11000 Washers Graeme Barlow - TE-MSC-CMI 4
Shield preparation.
Graeme Barlow - TE-MSC-CMI 5
Shield preparation.
Graeme Barlow - TE-MSC-CMI 6
The Parts needed for the modification.
Graeme Barlow - TE-MSC-CMI 7
The Clamp (for thermal contact and location).
Graeme Barlow - TE-MSC-CMI 8
The Latches (for quick and easy opening, closing).
Graeme Barlow - TE-MSC-CMI 9
The Hinge & Braids (for opening the shield and for thermal conductivity). Graeme Barlow - TE-MSC-CMI 10
How many do we need to modify?
• 8 per day.
• 1695 for LS1 + 100 spares.
• 130 in stock now.
Graeme Barlow - TE-MSC-CMI 11
The tooling (design stage).
Graeme Barlow - TE-MSC-CMI 12
The Tooling (ready to go).
Graeme Barlow - TE-MSC-CMI 13
The team.
Graeme Barlow - TE-MSC-CMI 14
Where are the modifications taking place?
Graeme Barlow - TE-MSC-CMI 15
New area in January 2013 !
Graeme Barlow - TE-MSC-CMI 16
New area in March 2013 !
Graeme Barlow - TE-MSC-CMI 17
Modifications to the tooling.
• Change of the clamps to hold the shields and templates.
Graeme Barlow - TE-MSC-CMI 18
Original clamps on the tooling.
Graeme Barlow - TE-MSC-CMI 19
New clamps.
Graeme Barlow - TE-MSC-CMI 20
New clamps on the tooling.
Graeme Barlow - TE-MSC-CMI 21
Modifications to the tooling.
• Change from manual to pneumatic rivet gun.
Graeme Barlow - TE-MSC-CMI 22
Original manual rivet gun.
Graeme Barlow - TE-MSC-CMI 23
New pneumatic rivet gun.
Graeme Barlow - TE-MSC-CMI 24
Modifications to the tooling.
• Hole templates with holes aligned to the components.
Graeme Barlow - TE-MSC-CMI 25
Hole templates.
Graeme Barlow - TE-MSC-CMI 26
Safety.
Graeme Barlow - TE-MSC-CMI 27
Chemical cupboard.
Graeme Barlow - TE-MSC-CMI 28
Safety containers and safety data sheets.
Graeme Barlow - TE-MSC-CMI 29
Eye wash and plaster station.
Graeme Barlow - TE-MSC-CMI 30
• Now we are ready to modify the interconnection thermal screens in a productive and safe way during LS1.
Graeme Barlow - TE-MSC-CMI 31