Communications space’ at WSF 3

Download Report

Transcript Communications space’ at WSF 3

A Comprehensive Review of the Uganda National Development Strategy (PEAP)*

by Wilson Turinawe Blasio Musisi Johnson Nkuuhe Alexander Aboagye 1

UNDP RBA MDG-Based National Development Planning Training Workshop, Dar, Tz, 27 February – 3 March 2006 * PEAP = Poverty Eradication Action Plan (equivalent of PRSP)

1. Ambition

of Uganda’s PEAP

2 MDGs 1. Eradicate poverty & hunger 2. UPE (1 goal) 3. Gender equality PEAP goals

Reduce the incidence of poverty from 56% to 38% then to 10% by 2017

UPE enrolment to 98%by 2003

Adult literacy 85% by 2005

Female enrolment in tertiary education to 40% of total by 2003

Increase the proportion of women among decision makers More (+ ); Less (-); Equal (=) or Not comparable (NC) + + NC NC

1. Ambition

of Uganda’s PEAP (2)

3 MDGs 4. Reduce child mortality 5. Improve maternal mortality PEAP goals

Reduce infant to 68/1000 by 2005

Reduce the under 5 MR to 103/1000 by 2005

Reduce the MMR to 354/100,000 by 2005

Increase the proportion of birth attended by skilled health personnel to 45% by 2004/05 = More (+ ); Less (-) Equal (=) or Not comparable (NC)

1. Ambition

of Uganda’s PEAP (3)

4 MDGs PEAP goals 6. Combat HIV/AIDS/Malaria

Reduce the antenatal HIV/AIDS prevalence rate to 5% by 2005

Increase the contraceptive prevalence rate to 30% by 2005 7. Ensure environmental sustainability

• •

Ensure that 65% of the population have access to clean and safe drinking water in 2005 and 100% in 2005 Ensure that 80% of the urban popn have access to C & S water in 2005 and 100% 2015 + + More (+ ); Less (-) Equal (=) or Not comparable (NC) NC

PEAP and MDGs: PEAP pillars explained

1 – Economic Management 2 – Enhancing Production, competitiveness and income 3 - Security, conflict resolution and disaster management 4 - Good governance (Justice, law and order, democratization, public sector management) 5 - Human development (Health, education, water & sanitation, social development) 5

* PEAP = Poverty Eradication Action Plan (equivalent of PRSP)

2. Scope

Investment clusters: comparison between Uganda’s PEAP and MDGs 6 MDGs 1. Rural development 2. Urban development 3. Education 4. Health (CMR, MMR, HIV, TB, Malaria) 5. Gender 6. Environment 7. Science and Technology 8. Cross-national infrastructure 9. Public management PEAP Pillar 1 Pillars 1 & 2 Sparsely mentioned in he document Pillar 5 Pillar 5 The sector is under stated under housing Human development Pillar 5, seen as cross cutting Pillar 2 Gender means men, women, persons with disability Pillar 2 Pillar 2 Pillar 4 Comment PEAP emphasis on macro-economic management PEAP funds for innovation, but not implementation and up-scaling Major focus is in-country, only rail is cross-national

7

3. Rigor

of Uganda’s PEAP

Plan rigorous in some aspects, but not in others. Examples: free bed nets for 4 m pregnant women; increase of per capita expenditure on drugs from $ 1.2 per capita to $2.5, Analysis rigorous in the following sectors:

Education (especially primary education) see Table 7.1 page 155 of the PEAP document)

Health (see Table 7.5 page 167)

Water and sanitation (especially the water component) (See Figure 7.1 page 169)

Works, housing and communication (infrastructure)

Not rigorous enough in remaining sectors

4. Timeframe

8

    

Uganda’s PEAP is a 3-year rolling planning framework.

Does not relate to Vision 2025, which is being transformed into Vision 2035. Not aligned to MDGs and it is not consistent with short- long term goals and Vision 2025. This is the last PEAP under Ministry of Finance, Planning and Economic Development. The next PEAP will be under the National Planning Authority, and it will be aligned to Vision 2035, cascaded into three 10-year strategic plans each with two- 5year development.

9

5.

Costing

of Uganda’s PEAP

   

Sectors with investment plans have costed them, e.g.: $ 951 million for rural water for 2001-2015; about $ 481 million for urban water development; Most interventions are not costed and budgeting is not aligned to the MDGs based assessment.

10

Challenges in Uganda

Timeframe looks too short

 

Financial and human resources Resistance from MTEF implementing institutions.

Lack of enthusiasm and cooperation from other stakeholders.

Resistance based on not understanding the distinction between MDG-based planning and PRSP /PEAP

11

Expectations

Resource persons

Financial resources

Assistance with high level negotiations

At NY, regional and national levels

With Donors, the UN system, bureaucrats, CSO

Assistance with coordination

12 This process needs determination, Fortunately Uganda has lots of it!

13

A Comprehensive Review of the Uganda National Development Strategy (PEAP)*

by Wilson Turinawe Blasio Musisi Johnson Nkuuhe Alexander Aboagye

Thank you, may God bless your journey