Transcript Document
Integrated Project Delivery: Built to Last CMAA Water Summit July 20, 2010 James A. Parrott Executive Director MSDGC Background • Population Served – 850,000 in Hamilton County, Ohio – 220,000 connections • Double Governance – Hamilton County Sewer District – Operated by City of Cincinnati MSDGC Challenges • Aging Infrastructure – About 50% combined sewers – Some 150 years old • Multi-Billion $Consent Order – Plan submitted in 2006 – Conditional approval in 2009 • Phase 1 = $1.2B by 2019 • Stagnant/Failing Local and National economy – Unprecedented local layoffs (especially in government) – Affordability issues with residents Key Facts • MSD is among the top 5 CSO dischargers in the US • MSD must submit a plan to USEPA by December 2012 for the Lower Mill Creek Remedy (location of our largest CSO) • MSD has until 2017 to submit Phase II Schedule MSD’s Environmental Challenge Must control by 85% How to Build a Consent Order Wet Weather Strategy Strategy Flexibility Affordability Source Control Conveyance & Storage Product Control Phased Approach Phase 1: 2009 – 2019 Phase 2: Schedule to be submitted by 2017 Controlled Spending Phase 1: $1.145B Credit for $300M of projects already built Phase 2: To Be Determined Clock is Ticking 2017 2009 2011 MSD received conditional approval of the Wet Weather Plan after three years of negotiations Evaluate alternatives to achieve overflow reductions of 2BG 2009 2010 2011 2012 Submit Plan for Phase 2 including schedule and costs 2017 2018 2010 2012 2018 Final legal action anticipated MSD will integrate results to arrive at a recommended plan to submit to USEPA MSD must achieve 2 BG overflow reduction in Lower Mill Creek $200.0 $1,800.0 $180.0 $1,600.0 $160.0 $1,400.0 $140.0 $1,200.0 $120.0 $1,000.0 $100.0 $800.0 $80.0 $600.0 $60.0 $40.0 $400.0 $20.0 $200.0 $- $2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Years Total Cost (M$) Annual Cost (M$) Phase 1 Costs (2006$) Annual Total WWIP Phases & Workload 250 D evelo p m en t P h a se P eak P ro d u ctio n P h as e C o n stru ctio n D esig n P lan n in g 200 N u m b e r o f P ro je c ts M o b ilizatio n P erio d 150 WWIP Phase I 100 R am p D o w n P h ase 70 Completed 45 New Projects 8 Annual Allowances WWIP Phase II Total167 Projects Schedule will be negotiated 50 0 2007 2008 20 0 9 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Wet Weather Strategy Determines Capital Portfolio Other 5% Source Control 0% Product Control 35% Conveyance & Storage 60% WWIP as Currently Approved MSD Wet Weather Strategy Determines the Project Portfolio • Source Control – Removal of natural drainage from entering the system – Regional BMPs, Separate storm sewer installation • Conveyance & Storage – Tunnels, parallel interceptors, storage facilities – Real-Time control • Product Control – EHRT and peak flow enhancements to existing WWTP’s MSD Wet Weather Strategy Implementation Hydraulic Grade Line How We Got Started • Three phased PMC – GAP Analysis • Highlighted project risks, resource and process needs – Developing Process to Bridge the GAP • Master Program Management Plan – Implementation Plan and Monitor Progress MSD Organization in 2006 County Program Mgt Director Deputy Director Administration Treatment Engineering City Chief Engineer Wet Weather Strategy Collections Laboratory & Industrial Program IT Engineering Division Program Mgt Superintendent Administration Planning Project Management: Design Project Management: Construction Public Services Conventional “Cradle to Grave” Project Management Program Management and Monitoring operates in own silo What We Know Now That We Didn’t Know Then… • Organizational structure change inevitable – What we did…. Tried to make incremental change – What we should have done…. Slash and Burn – Staff must: o Have sense of urgency o Be open to change o Obtain new skill sets o Or GET OUT OF THE WAY! How We Needed to Change • MSD Manages Integrated Program – External Monitoring – Incentive based embedded staff • Business Case Evaluations – Project selection by Triple Bottom Line analysis • Separated Planning from Design/Construction – Where the rubber hits the road – Allows priority focus for Project Delivery MSD Organization in 2010 Director Deputy Director Chief Engineer Stormwater Management Admin Treatment Engineering: Project Delivery Engineering: Planning & Development Collections Laboratory & Industrial Program IT Wet Weather Strategy Capital Programs Management Financial Planning & Analysis Engineering: Project Delivery MSD Executive Leadership Engineering: Planning & Development Environmental Programs Wet Weather Strategy Enterprise Management Project Controls Design & Construction Management Quality Assurance Cross-Functional Responsibility and Imbedded Program Management Support with External Monitors Environmental Programs EP Manager Sustainable Project Construction Delivery Sustainable Watershed Planner Demonstration Programs Concentration on Sustainable Watershed Management Current WWIP Profile Product Control 35% Other 5% Source Control 0% Other 5% Product Control 25% Conveyance & Storage 60% Source Control 35% Conveyance & Storage 35% Potential Sustainable Approach Other Lessons Learned • Financial System Inadequate – Multiple systems needed to be integrated – Need analysis and decision support tools • Let Risk Management Drive Decisions – Justify projects and alternative selection inside a risk framework – Strengthen Asset Management principles • Communication – Internal and external tools necessary MSD Risk Management • Comprehensive process integrating all enterprise risks – – – – Corporate Asset Operational Project Implementation • Process driven by MSD Financial Policies – Owned by Finance Manager Other Lessons Learned • Let Risk Management Drive Decisions – Justify projects and alternative selection inside a risk framework – Strengthen Asset Management principles • Financial System Inadequate – Multiple systems needed to be integrated – Need analysis and decision support tools • Communication – Internal and external tools necessary Sharing the Vision Technology Drivers Where We Are Tactical • Activity-Based • Document Management • Construction Coordination Where We Are Going Strategic • Integrated Management • Workflow Integration through Document Control • Watershed Management Required Systems • • • • • Fully functional DMZ Scheduling tool Integrated financial management system Forecasting and Earned Value tools Asset management system Built to Last Formula 1. Consent Order with Flexibility 2. Wet Weather Strategy that leverages infrastructure investments to create factor conditions that support community development/urban infill 3. Organization Structure that support integrated project management 4. Renewed focus on environmental programs that support the wet weather strategy 5. Financial and Risk Practices linked with strategic organizational performance Sustainable Organization – Financially and operationally stable Sustainable Infrastructure – Does not create future liabilities Sustainable Community – Maximizes benefits for all residents Value Creation Leveraging MSD Investments Questions? James A. “Tony” Parrott 513-244-1212 [email protected]