Vidhya Cylinders P. Ltd
Download
Report
Transcript Vidhya Cylinders P. Ltd
Beyond Fabrication. Nurturing Hopes
This Presentation is aimed at giving an overview of our Company,
Prefabricated Structures, its applications, technical specifications,
features & its advantages in respect to infrastructure.
LAST UPDATED: Jan’2013
VCPL Prefabricated Shelters
VCPL Prefabricated Shelters a division of Vidhya Cylinders P. Ltd, was established in the
year 2008. The entry into Prefabricated Shelters by Vidhya Cylinders was part of a forward
integration extension to its original fabrication business of cylinders. Vidhya Cylinders the
parent company is in the business of Manufacturing, importing, exporting of various types of
welded cylinders, industrial gas cylinders, domestic & commercial gas cylinders, Drum , Guardrails
,Prefab huts & Aluminum water tanks. We in VCPL, being aware of the growing demand for group
accommodations & for quick fix solutions for varied requirements of the industrial & domestic
sector, we set up a state-of-the-art unit to manufacture PREFABRICATED SHELTERS. These
structures are manufactured off-site in advance at our unit & are designed to be created as per
approved quality drawings. These structures cover various applications including Barracks, Site
Offices, Site Accommodation, Class Rooms, Storage Shed, Labor Camps, Transit Camps, Guard
House, Sentry Post, Roof Top Accommodation, Cottages, Partitions, Resort Accommodation, Low
Cost Housing, Health Center, Aganvadis etc. any many more. manufactures custom made
structures for which necessary information regarding requirements has to be intimated by the client
and the company works out the best configuration which is idle suited of ones requirement and is
cost effective.
Sales by Departments/Sectors
Sales
Railways
Police Dept
Infra Projects
C Govts
S Govts
• Over 60% contribution from repeat orders with
Police Departments of Jharkhand ,Chhattisgarh ,
Railways & NTPC Ltd emphasizes quality of
execution
• Work Experience of varied sectors
• Rich experience of erection in remote multi
locations.
• Experience of multi specification.
• Supported by over 25 professional erection teams
for speedy erection
Order & Execution status (Value based in lacs) YTD Jun’12
900
800
700
600
500
400
300
200
100
0
Order
Execution
Order & Execution status Clientwise 2009-10 (Value based
in lacs)
200
180
160
140
120
100
80
60
40
20
0
Order
Execution
Order & Execution status Clientwise 20010-11 (Value based in
lacs)
180
160
140
120
100
80
60
40
20
0
Order
Execution
Order & Execution status Clientwise 20011-12 (Value based in
lacs)
200
180
160
140
120
100
80
60
40
20
0
Order
Execution
Order & Execution status Clientwise 20012-13 (Value based in
lacs)
350
300
250
200
150
100
50
0
Order
Execution
Our Clients
• South Eastern Railways
• Police Headquarters, Raipur
• SP Office, Chaibasa & Saraikela; Jharkhand
•SIB, Ministry of Home Affairs, Raipur
• NTPC Ltd
• PWD Buildings Department, Jamshedpur, Jharkhand
• Rural Development Special Division, Chaibasa, Jharkhand
• Military Engineering Services, CWE(AF) Palam, New Delhi
• ITBP
• CRPF, New Delhi
• College of Materials Management, Jabalpur
• Municipal Corporation of Delhi
• Rural Works Dept, Saraikela, Jharkhand
• CPWD
• NPGC, Bihar
• Mecon Limited
• MPPGCL; Jabalpur
Overview Prefabricated Structure
The criteria for design of VCPL Prefab has been:
•Simple engineering requiring no high skills.
•The elements or the components of the shelters should be in small
sizes that can be transported easily even in a difficult terrain and
manually handled at site of work.
•The erection should be fast requiring no machinery.
•The shelters should have high strength and light weight requiring
less foundation.
•In case of need these shelters should be feasible for dismantling
and re-erecting in different location with minimum loss of materials
or high salvage value.
•The design should have flexibility and adoptability from a small
shed to a posh building as required by the customer.
•Above all they should be durable, comfortable and cost effective.
Applications (Barracks)
•Defense & Paramilitary use this form of Barracks as a quick fix alternative to group
accommodation in all terrains & condition.
•These Barracks come in sizes to accommodate comfortably between 12-50 jawans at a time.
• Being insulated these barracks can withstand relatively tough weather conditions.
• These barracks can be partitioned & put to many alternative uses too.
Applications (Site Offices/Camps)
• Conventional Barracks can be used
as Site Office.
• Custom made site offices are
available on demand in almost all
sizes & shapes.
• Provision to aesthetically improve &
add value added features & finish (
Interiors & Exteriors) as per demand.
Applications (Schools/ClassRooms)
• The application of Prefab for making school buildings is on the rise given the
shortage of classrooms & the urgency to meet the gap.
• More & more of State Governments are working on Prefab Technology to
accelerate the process.
• Prefab serves the viability of easily setting up infrastructure in remote places.
Applications (Low Cost Housing)
• Prefab Technology is also being
used for Low Cost Housing
needs growing both in Rural &
Urban areas.
• Municipalities are using these
structures for providing shelters
to permanently, semi
permanently displaced families.
• Growing needs of Night
Shelters is being met with Prefab
Structures.
• The Government of
Chandigarh has constructed
1500 structures towards
rehabilitation programme.
Applications (Hostels/QuickFix Accomodation)
• Prefab Structures are also
being used for setting up
Hostels, along side Ashram
Schools in various Tribal
dominated districts of India.
Applications (Primary & Sub Health Centers)
• Given its flexibility & easy
transportability Prefab is being
used to reach Primary Health care
to even the remotest corners of the
country.
• Madhya Pradesh Government is
contemplating of constructing 3500
Sub Health centers across the State.
Applications (Roof Top Accomodation)
• Prefab Technology is widely used
to construct semi permanent
structures on existing buildings.
•Being light weight there is much
less load on existing civil structure.
Applications (Aganwadis)
• Prefab Technology is also
being used for construction
of Aganwadis.
• The Governments of
Gujarat & Andhra Pradesh
are widely using Prefab
structures to construct
Aganwadis.
Applications (Double Storey Structures)
• In urban areas given
constraints of space double
storey constructions are also
being made with Prefab.
Applications (Expansive Structures)
• Large Expansive structures for multi purposes can also be constructed with
prefab technology
• These structure can be over a span of even 20000 sqft.
• Power projects are solely depended on these structures for their preliminary
infrastructure.
Technical Specifications
Structure Base
MS Base Frame, rails on outer and support column and beams.
MS Tubular square pipe for partition frame and U Channels for sandwich panels.
Walls/Partitions
4mm sheet for economy models & 8 mm sheets for regular models
30 – 50 mm sandwich panel duly reinforced with insulating material.
Roof
CGI sheet/AC sheet/Corrugated PVC sheet/CPC sheet/PPGI sheets
Doors
30mm Wooden shutter fitted/ CR sheet frame & powder coated over tubular frames/ flash doors/
PVC doors.
Windows
CR sheet frame & powder coated/Aluminum sliding windows.
Painting
Only on tubular structure panel sheets as per requirement & choice of customer.
Optional –
Grill Window
Electrical wiring with accessories.
Bath room / kitchen portion
Interior - Custom made design as per client choice.
Flooring: PVC
Painting
Technical Specifications (Optional Panels)
•Aerocon Insta panels is a slim and lightweight wall panel consisting of a core of portland
cement, binders, silicaceous & micaceous . These panels are an excellent substitute for
plasterboard, plywood, particleboard and brickwalls because of their sheer strength coupled
with fire & moisture-resistance properties and ease of installation.
• PUF Panel Systems are specifically designed to cater all kinds of Cold Storage, Telecom
Shelters, Living Shelters & Clean Room Enclosures. The high performance and quality
offered by these systems ensures extra strength, better overlap, weather tightness, corrosion
resistance, low maintenance cost and good aesthetics. These panels are interlocked with each
other using Cam Lock Systems or through Tongue & Groove arrangement, which ensures a
precise interlocking of panels and dimensional accuracy. This eliminates the risk of thermal
bridging & provides an air tight joints between panels after erection.
Technical Specifications (Optional Value add ons)
• Pre painted Galvanized sheets on roof add to the aesthetic value of the
structure.
• Floor Tiles/Vitrified Tiles as an upgrade.
• Pre Laminated wall boards improves interior finish.
• Alumunium/Powder Coated windows & designed flush doors to enhance look.
Key Features & Advantages
Lightweight & easy to install
Space saving yet strong & durable
Excellent acoustic barrier
Fire resistant finish
Optimum thermal insulation
Relocatable with high salvage value
Verification done at factory
Raw material with specs procured on a lot basis
Verification of every panel and door for dimensional accuracy and visual appearance
Clean room constructions
Clean zone constructions
Flexible finish options
Design flexibility with choice of color finishes
Panels can be installed horizontally or vertically
Reliable robust mechanical performance
High speed of construction
Aesthetic appearance
Fire safety
Water resistant
Other Conditions & Compliances
Completion Period
Time will be the essence of the contract . Contract period for each work site shall be
fixed from the schedule date of commencement. The job of erection at site shall
be started as per instructions of EIC.
Defect Liability period
Defect Liability Period of the job shall be 12 ( Twelve) months after complete
handing over of each structure.
Method of Measurements
Measurement shall be taken jointly after the erection of Prefabricated Structure.
Clear measurement (Plinth level) shall be payable.
All brought out materials shall be in accordance with CPWD / IS Specifications
and shall be used subject to approval.
All Safety & statutory requirements to be complied with.
DGS&D Rate Contract
Pre-fabricated structures have come up to its real importance with its wide applicability and
acceptability. These structures are now a days a need rather than a luxury. The DGS&D with this
objective brought Pre-fabricated Structures on their Rate Contract.
Pre-fabricated structures manufactured by us under DGS&D Rate Contract has proved to
be highly useful for various Government Institutions. These shelters are more comfortable and
durable providing relief from extreme climatic conditions prevalent in India. They are also
economical in the long run as they last for almost twenty-five years .These structures provide
better living conditions and are fire, water, termite retardant.
Regd Office: Surya Palace, Sarafa Bazaar,
Lashkar, Gwalior – 474001, MP
0751 2632841 – 2332842
Fax: 0751 2632844
Email: [email protected]
VCPL Prefabs– Plot No 112, Sector A, Industrial
Area, Mandideep, Dist Raisen, MP