CMMi
•
•
•
•
•
•
What is CMMi?
Basic terms
Levels
Common Features
Assessment process
List of KPAs for each level
CMMi - Introduction
• CMMi – Capability Maturity Model Integrated
• A set of best practices, organized under different
key process areas
• Software Engineering Institute (SEI) of Carnegie
Mellon University (CMU) and US Department of
Defense (DoD) did an elaborate study in many
top software and hardware companies
• They compiled the best processes that yielded
good results in all these companies
• That has become a rule book for others to follow
• This can be used as a scale to measure the
process capabilities of a company
CMMi - Introduction
• CMM was initially introduced
• CMM had gaps in areas of electronic/hardware
processes, systems engineering, supplier
processes, team processes with respect to
software processes
• Hence CMM was improved to bridge these gaps
and the new process was called CMMi
• CMMi has got 2 variations – staged and
continuous
Basic Terms
•
KPA – key process area
– A set of related activities, events and deliverables. A group or department may
take the main responsibility
•
CG – common goal
– A generic aim to be achieved
•
GP – generic practice
– A generic set of activities to be followed
•
SG – specific goal
– A specific aim to be achieved within the KPA
•
SP – specific practice
– A specific set of activities within the KPA to be followed
•
AB – ability
– What enables to carry out the activity
•
VE – verification
– How to ensure the KPA is followed well
•
DI – directing implementation
– Reviewing status with management, maintaining documents
•
CO – commitment
– What are the commitments the management need to provide to implement the
KPA
Framework Architecture
Maturity Levels
Process Area 1
Process Area 2
Specific Goals
Process Area n
Generic Goals
Common Features
Commitment
to Perform
Ability
to Perform
Directing
Implementation
Implementation
Specific Practices
Generic Practices
Verifying
Implementation
Levels
• L1 – Initial level. Totally adhoc processes. Success
depends on individual capabilities of people
• L2 – Managed. Project level processes are established.
Requirements are managed. Successful process in a
project can be a role model to others. Each project level
process may be different
• L3 – Defined. Organizational level processes are
established. These are tailored to projects. Consistency
is established across the board. All engineering activities
are covered.
• L4 – Quantitatively Managed. Every aspect is measured
and statistically compared. Predictability of success is
high.
• L5 – Optimizing. Continuously measure and improve all
processes and variations. Optimize at organization level.
Common Features
•
Establishing an organizational policy
– At the apex level we need to define a policy to implement the KPA
– This is a commitment
•
Institutionalize the process
– The process must be consistently implemented across the organization
– This will increase predictability
•
Plan the process
– Every process implementation must be planned and tracked
•
Provide Resources
– Provide human resources, hardware and software resources, necessary tools
•
Assign Responsibility
– Different stakeholders in the KPA must take specific work areas
•
Train People
– Educate people on the respective KPAs
•
Manage Configurations
– All documents and work products must be tracked for versions and approval
levels
Common Features
• Monitor and control process
– Ensure the tracking is done at all levels
• Objectively evaluate adherence
– Measure adherence and associate numbers
with it across the organization
• Review status with management
– Status must be communicated and reviewed
periodically
Stakeholders
•
•
•
•
•
•
•
Senior management
Project Management
Project members (engineering teams)
Support groups
Quality group
Supplier Management group
Customer interaction group
Assessment Process
• A team of appraisers will be formed along with authorized lead
appraiser (ALA)
• The team will undergo training conducted by ALA
• A sample set of projects will be taken with all related work products
• All documents will be reviewed – every compliant area will be
marked and sticky notes will be attached to the documents
• A wall chart is prepared with KPA compliance areas with respect to
quality management documents and project documents
• A team of members will be randomly selected from all groups of the
organization
• The appraising team will interview all selected members with a lot of
relevant questions to ensure the process knowledge and adherence
• Every checklist item will be ensured for adherence
• Depending upon the KPAs satisfied by all team members, the
assessment level will be awarded
Process Areas for each Level
•
Maturity Level 2: Managed
–
–
–
–
–
–
–
•
Maturity Level 3: Defined
–
–
–
–
–
–
–
–
–
–
–
–
–
–
•
Requirements Development
Technical Solution
Product Integration
Verification
Validation
Organizational Process Focus
Organizational Process Definition
Organizational Training
Integrated Project Management for IPPD
Risk Management
Integrated Teaming
Integrated Supplier Management
Decision Analysis and Resolution
Organizational Environment for Integration
Maturity Level 4: Quantitatively Managed
–
–
•
Requirements Management
Project Planning
Project Monitoring and Control
Supplier Agreement Management
Measurement and Analysis
Process and Product Quality Assurance
Configuration Management
Organizational Process Performance
Quantitative Project Management
Maturity Level 5: Optimizing
–
–
Organizational Innovation and Deployment
Causal Analysis and Resolution