Switzerland – a land of railways
5,100 km of track
2,291 km/year/resident
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
2
Confirmed by referendum
1992
Yes to the building of new lines through the Alps
1994
Yes to the Alpine initiative
1998
Yes to the development of railway infrastructure
1998
Yes to nationwide tolls on heavy good vehicles
2001
Yes to the surface transport agreement with the EU
2004
No to a second road tunnel through the Gotthard
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
3
Capacity shortages on the rail network
Lines
Capacity bottleneck
Gauge restrictions
(freight traffic,
passenger traffic)
Stations
Insufficient capacity
Platforms too short
Both
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
4
Railway infrastructure funding not
ensured
5'000
Mio. CHF (real, Preisstand 2010)
4'500
4'000
3'500
3'000
2'500
2'000
1'500
1'000
500
0
2010
2015
2020
2025
2030
2035
FinöV-Fonds
Bevorschussung
Advancesdes
from
the FinöV fund
NEAT-Kosten)
MinöSt
Fuel(25%
taxesder
(25%
of NEAT costs)
MWSt (1‰
VATMWSt)
(1 ‰of VAT)
LSVA-Erlöse)
(2/3
LSVA
HGV
tolls
(2/3rds toll income)
General
federal funds
Bundesmittel
allgemeine
Investment in expansion
Erweiterungsinvestitionen
Repayment
of FinöV advances
des FinöV-Fonds
der Bevorschussung
Rückzahlung
Interest on advances
Bevorschussungszinsen
Folgekosten aus Erweiterungen (inkl. Bahnprojekte aus dem IF)
Betrieb und Substanzerhalt bestehendes Netz
Costs arising from extensions (including IF railway
projects)
Total verf ügbare Mttel
Total available resources
2040
Operation and asset management on existing network
(Funding shortfall, reference situation, without future extensions)
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
5
Today: funding for major projects
NEAT
10.6 billion €
Road tolls
Rail 2000
3.8 billion €
Fuel taxes
Funds
High speeds
20 billion €
700 million €
(Railway Development
Plan (ZEB)
2-3 billion €
VAT
Noise reduction
1.5 billion €
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
6
New: Global railway infrastructure
fund
Formerly FinÖV fund
bisher FinöV-Fonds
Income
Outgoings
Performance-related
heavy vehicle toll
VAT
Fuel taxes
Extension/Development
Railway
infrastructure
funding
Interest on advances
Repayment of aggregate
advances
Income =
outgoings
• Contributions cantons
• Train path price
adjustments
• Flat-rate calculation
Travel cost deductions
Federal taxes
General Federal funds
Infrastructure operation
New sources
Asset maintenance
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
7
Targeted railway infrastructure
development
Long-term prospects for the railway
Strategic railway infrastructure development programme
(STEP, formerly Rail 2030)
2025
Time horizon
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
2030
Time horizon
xy
Time horizon
8
Long-term prospects for the railway
15 min interval main-line clockface service
30 min interval main-line clockface service
Connection to European economic centres
Freight corridors
Light rail with 15-min interval clockface services in core
area
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
9
The country needs new track
EFRTC General Meeting | Zurich, 27. Mai 2011
Dr. Peter Füglistaler, Direktor BAV
10