HEAT PUMPS

CPLE

• 10 S.E.E.R.

• Low pressure control • Accumulator • Check-flow rater expansion device • Defrost controls

SMALL CHASSIS = 23" [58cm] LARGE CHASSIS = 29" [73cm] SMALL CHASSIS = 23" [58cm] LARGE CHASSIS = 29" [73cm] CPLE18 = 22.5" [57cm] CPLE24 = 30" [76cm] CPLE30 = 30" [76cm] CPLE36 = 25" [63cm] CPLE42 = 30" [76cm] CPLE48 = 32.5" [81cm] CPLE60 = 32.5" [81cm] SMALL CHASSIS LARGE CHASSIS ADDITIONAL 1-1/2" [38.1mm] ELEVATED CHANNEL FORMED INTO BOTTOM PAN LIQUID CONN.

1-1/8" [28.5mm] DIA. POWER 7/8" [22.2mm] DIA. CONTROL SUCTION CONN.

LOUVERED SERIES 10 SEER CONDENSING HEAT PUMP NOMINAL CAPACITY 18 = 1-1/2 TONS 24 = 2 TONS 30 = 2-1/2 TONS 36 = 3 TONS 42 = 3-1/2 TONS 48 = 4 TONS 60 = 5 TONS Nomenclature CPLE 18 1 VOLTAGE DESIGNATOR 1 = 208-230/1/60 3 = 208/230/3/60

INSTALLING & OPERATING

SETTING OF THE UNIT

• Unobstructed condenser air inlet and discharge • 10 inches minimum air clearance on all sides • 18 inches clearance at the service access • Unit to be mounted solid level foundation • Make sure rooftop application can handle the weight

ELECTRICAL SERVICE

• Unit rating plate will list electrical data for proper size of electrical service • Make owner familiar with location of the over • 18 gauge wire is needed for 24 volt control wiring

REFRIGERANT TUBING

USE ONLY REFRIGERANT GRADE COPPER INDICATED IN TABLE 1

• SUCTION LINE INSULATION IS

NECESSARY

TO PRESENT CONDENSATION • 3/8 WALL THICKNESS OF ARMFLEX IS

SATISFACTORY

BRAZING THE LINE SET

• Tubing should be cut with a good tubing cutter • Clean off any burrs • Wrap a wet rag or use a thermal paste around a service valve to prevent overheating • Trickle a small amount of nitrogen through the line set • Braze with silver solder

LEAK TESTING

• Visually check all solder joints with an inspection mirror • Add a trace amount of R22 and then fill line with 200 psig of dry nitrogen • Test with soap bubbles or electronic leak detector • If there are no leaks vacuum line set to 500 microns and hold for 30 minutes

SYSTEM CHARGE

• System comes charged for 15 foot of line set and matching evaporator • Adjust the charge for every additional foot of line set(see chart) • Systems with over 50 foot line set may require an oil charge adjustment • Adjust the charge by the Superheat Method (see video)

CLJ & CPLJ Conversion To Scroll Compressors

Scroll Compressors should never be pumped down into a vacuum .This could could cause internal arching and cause the compressor to fail.

Scroll Compressors do not need crank case heaters.

COOLING MODE

HEATING MODE

The Reversing Valve Is Energized In The Cooling And Defrost Modes Only

Reversing Valve

Pilot Valve

Solenoid w/feeder tubes

Hot Gas Discharge tube Pilot Valve Tubes True Suction tube

ACCUMULATOR

Defrost Control

DEFROST CONTROL BOARD

CAPACITORS

IT IS IMPORTANT TO KNOW THAT THE CAPACITOR IS PRODUCING THE CORRECT EFFECT TO THE MOTOR CIRCUIT. TESTING THE CAPACITOR WITH A METER CAN BE MISLEADING. THE METER PRODUCES 9 VOLTS TO THE CAPACITOR WHEN TESTING THE MICRO-FARAD CAPACITY. THE CAPACITOR OPERATES WITH GREATER THAN LINE VOLTAGE APPLIED. THE START WINDING PRODUCES WHAT WE CALL COUNTER EMF [ELECTROMOTIVE FORCE]. THE CAPACITOR CAN BE TESTED WHILE OPERATING BY READING THE VOLTAGE APPLIED AND THE AMPERAGE TO THE START WINDING OF THE MOTOR. ONCE THOSE READINGS ARE TAKEN, THE TECH CAN APPLY THEM TO THIS FORMULA.

__ __

MICROFARAD VOLTS

A WEAK CAPACITOR CAN CAUSE THE COMPRESSOR TO OVERHEAT CAUSING A HIGH DISCHARGE TEMPERATURE WHICH GETS US BACK TO THE BREAKDOWN OF THE LUBRICANT.

INSTALLATION

LOCATION •

10 TO 12 INCHES FROM WALLS OR OBSTRUCTIONS

IF THERE IS AN OVERHANG….. SHOULD BE AT LEAST 36 INCHES CLEARANCE

UNIT IS TO BE MOUNTED ON A SOLID, LEVEL FOUNDATIONS ELECTRICAL

ALL WIRING MUST BEIN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE

RATING PLATE ON THE CONDENSING UNIT LISTS ELECTRICAL DATA NECESSARY FOR THE SELECTION OF PROPER SIZE ELECTRICAL SERVICE AND OVER-CURRENT PROTECTION

CONTROL WIRING REQUIRES A 24 VOLT MINIMUM 25 VA SERVICE FROM THE INDOOR TRANSFORMER ……………... 18 GAUGE WIRE MUST BE USED

TEMPERTURE RISE METHOD

CFM = KW x 3413 TEMPERATURE RISE x 1.08

where : KW = The indoor section's measured input power = Volts x Amps and : Volts = The measured Volts at the Indoor Section Amps = The measured Amps at the indoor Section Temp. Rise = The temperature of the supply air minus the temperature of the return air 3413 = BTU per KW 1.08 = specific heat air constant e.g. : The input power to the indoor section = 10 KW The Temperature Rise = 20o F CFM = 10 x 3413 = 1580

TEMPERTURE SPLIT

  

Verifying proper air flow

Set thermostat to emergency heat mode. Call for heat.

Measure

D

T @ indoor coil

Measure Electric Heat volts & amps BTU = Watts (Volts X Amps) X 3.413

CFM = BTU / (

D

T X 1.08)

All Fuel Board

• • • • • • •

Goodman Part # AFE 18-60 Primary Functions Control Inputs Control Outputs Normal Operation Outdoor Thermostat Mode Control Environment

Primary Functions

Interface Between a Heat Pump Thermostat and a Heat Pump and a Fossil Fuel Furnace

• •

Option for an Outdoor Thermostat Compressor Short Cycling Prevention

Normal Operation

• 1st Stage Cooling from Thermostat Operates the Heat Pump Compressor • 2nd Stage Cooling or an Emergency Heat Call Operates the Fossil Fuel Furnace & Disables Compressor • Timer Prevents Compressor from Operating for 120 Seconds from De Activation

Control Inputs • “R” - Source is Furnace “R” Terminal – Distributes “R” to Heat Pump & Thermostat • “C” - 24VAC Common ; Source is Furnace – Distributes “C” to Heat Pump & Thermostat • “O” - Reversing Valve Routed to Heat Pump • “E”- Emergency drops out heat pump via K2 contact energizing W2 gas furnace heat • “W2”- 2nd Stage Call for Heat – Identical to Emergency Heat ; Connected to Same on Control

Control Outputs

• Furnace “W” - Heat Pump “W2/OT-NO” • Furnace “G” - T-Stat Input for High Speed Fan • Heat Pump “O” - Reversing Valve Output • Heat Pump “Y” - Heat Pump Compressor Call

Control Outputs Continued...

• Heat Pump “OT-NC” - Connects to Heat Pump “Y” thru N.C. Relay K2 and N.O. Relay K3 – Determines if Heat Pump Will Run When “Y” Call is Received from Thermostat • “OT-C” - Common Terminal for Outdoor Thermostat – “BREAK FOR ODT” Tab must be removed

Outdoor Thermostat Mode

• Provision for SPDT Outdoor Thermostat • Outdoor Thermostat Must be Connected to the OT-NC & OT-C Terminals • Determines Whether Heat Pump or Furnace will Run in 1st Stage Heating.

• The “BREAK FOR ODT” Must be Removed Before Connecting the Outdoor Thermostat

any questions?