Transcript Aims of this course
David Warne Independent Manufacturing Consultant
Product Management Works Orderless Production Manufacturing Extension Pack
Product Management
Product Management
A system and frame-work which supports the management of product design, release and changes within a controlled and audited environment.
Management of product life cycle from Design and Pre-Production to obsolescence
Module Components
CAD System Data Exchange Classified Search Change Note Register Drawing Register Part Database Release Update Process Sage Enterprise Manufacturing
Lifecycle control
new product introduction design changes obsolescence impact on the supply chain rework
Product Management
Two elements Drawing Register Engineering Change Control
Part Database
Drawing Office data base of Design Parts Limited information Part templates to provide consistent coding to avoid duplication Classification of components
Drawing Register
Mirrors the system of parts structures Defines the relationship between parts within an assembly History of changes maintained
Change Note Register
Register storing details of manufacturing updates User defined control levels Against a unique reference the details of change requirements specific to a part, sub assembly or finished product.
Authorisation System
Engineering Change Notes (ECN) details changes required 20 separate authorising departments Level of control set by System key Drawing revision specifies the assembly affected List of changes are detailed against the drawing
Authorisation System
ECN can be linked to a Drawing revision The control of system updates is via the authorisation status of the ECN
Engineering Change Control
Review existing stock position:
Physical stock Allocations Work in progress 2 bin stocks Scrap bins
Stock status enquiry Where used report Production bin report
Review outstanding works orders:
Outstanding balances Due Dates Work in progress MPS
Works Order enquiry WiP status report Wip audit trail MPS report
Review outstanding purchase orders:
Confirmed P/O's Requisitions Outstanding quantities Due dates Outstanding returns
Purchase Order enquiry Requisition enquiries Define and set effectivity date Purchase Order status report
On authorisation action changes to:
Stock master Bills of material Works orders Purchase orders Return / write off stocks Amend 2 bin system Rework existing wip Effect recall of defective units
Create / amend Stock details Bill of material amendment Works Order entry Purchase Order entry Stock Write Off Bin to Bin transfer Purchase Order rejection
Environments for ECC
Where is it used?
Aerospace Automotive Electronics Engineering Chemical
Environments for ECC
Where it could be used Control of software releases Control of document releases Maintenance of quality Management of processes Management of cost
Who needs to be involved in the process?
Fit Form Function - Design Change introduction - Planning Production Engineering - Manufacturing Procurement – Purchasing Marketability – Sales / Marketing Cost Implications – Accounting Stock Control – Inventory Management
ECN Templates
ECN templates define base data and analysis of resulting ECN’s Release Update option controls the implementation of Change Control Associated BOMs are copied or created Route details are updated Stock items are created
Engineering Change Control
Drawing numbers and revisions are updated throughout Sage Active Works Orders are identified Active Purchase Orders are identified
Engineering Change Control
Changes details are stored on user defined Technical Pages Drawing revision status is changed Impact Analysis report available
Application of ECC
How is this process managed?
Engineering change note
What is an Engineering Change Note?
An electronic document that defines the change requirements and allows authorising parties to agree or veto the changes.
Once authorised it will process the changes and record them against the stock records.
Drawing Register
Drawing Register
Drawings are linked to an assembly, sub assembly or component
Design Parts database
Design Part Templates creating Design Parts Design Parts Components Assemblies
Entering Component Changes Add new components (A) Delete existing components (D) Replace existing components (R) Modify existing components (M) Leave a component alone (U)
Drawing Controlled Release
ECN based control If all authorisers are set to A the ECN status can be automatically set to A for approved Green light system A combination of both User based and ECN based control
Stock records are created from design parts Bills of material are created Drawing revision updated