Complexity metrics
measure certain aspects of the software (lines of
code, # of if-statements, depth of nesting, …)
use these numbers as a criterion to assess a
design, or to guide the design
interpretation: higher value higher complexity
more effort required (= worse design)
two kinds:
intra-modular: inside one module
inter-modular: between modules
1
Sized-based complexity measures
counting lines of code (intra-modular)
differences in scale for different programming languages
Halstead’s metrics: counting operators and
operands
2
Halstead’s metrics:
n1: number of unique operators
n2: number of unique operands
N1: total number of operators
N2: total number of operands
3
Example program
public static void sort(int x []) {
for (int i=0; i < x.length-1; i++) {
for (int j=i+1; j < x.length; j++) {
if (x[i] > x[j]) {
operator, 1 occurrence
int save=x[i];
x[i]=x[j]; x[j]=save
}
}
}
}
operator, 2 occurrences
4
operator
public
sort()
int
[]
{}
for {;;}
if ()
=
<
…
n1 = 17
# of occurrences
1
1
4
7
4
2
1
5
2
…
N1 = 39
5
Example program
public static void sort(int x []) {
for (int i=0; i < x.length-1; i++) {
for (int j=i+1; j < x.length; j++) {
if (x[i] > x[j]) {
int save=x[i];
x[i]=x[j]; x[j]=save
}
operand, 2 occurrences
}
}
operand, 2 occurrences
}
6
operand
x
length
i
j
save
0
1
n2 = 7
# of occurrences
9
2
7
6
2
1
2
N2 = 29
7
Metrics:
size of vocabulary: n = n1 + n2
program length: N = N1 + N2
volume: V = N log2n
level of abstraction: L = V*/ V, V*=volume of fct prototype.
For sort(x), V* = 2 log 2. For main(), L is high.
approximation: L’ = (2/n1)(n2/N2)
programming effort: E = V/L
estimated programming time: T ’ = E/18
estimate of N: N ’ = n1log2n1 + n2log2n2
for this example: N = 68, N ’ = 89, L = .015, L’ = .028
8
Remember…
Metrics are only estimates, give some idea on
complexity
critique:
different definitions of “operand” and “operator”
explanations are not convincing (empirical, may not apply to
other projects)
Source code must exist
9
Other metrics (structure-based)
use
control structures
data structures
or both
example complexity measure based on data
structures: average number of instructions
between successive references to a variable
best known measure is based on the control
structure: McCabe’s cyclomatic complexity
10
1
Example program
2
public static void sort(int x []) {
for (int i=0; i < x.length-1; i++) {
for (int j=i+1; j < x.length; j++) {
if (x[i] > x[j]) {
int save=x[i];
x[i]=x[j]; x[j]=save
}
}
}
}
3
4
5
11
6
7
8
9
10
11
1
Cyclomatic complexity
2
3
e = number of edges (13)
n = number of nodes (11)
p = number of connected components (1)
CV = e - n + p + 1 (4)
4
5
11
6
7
8
9
10
12
Intra-modular complexity measures,
summary
for small programs, the various measures
correlate well with programming time
however, a simple length measure such as LOC
does equally well
complexity measures are not very context
sensitive
complexity measures take into account few
aspects
it might help to look at the complexity density
instead
13
System structure: inter-module complexity
measures dependencies between modules:
draw graph:
modules =nodes
edges connecting modules may denote several relations,
most often: A uses B (ex: procedure calls)
14
The uses relation
the call-graph
chaos (general directed graph)
hierarchy (acyclic graph)
strict hierarchy (layers)
tree
15
In a picture:
chaos
strict
hierarchy
hierarchy
tree
16
Measurements
width
height
}
size
# nodes
# edges
17
Deviation from a tree
hierarchy
strict
hierarchy
tree
18
Tree impurity metric
complete graph with n nodes has e = n(n-1)/2
edges
a tree with n nodes has e = (n-1) edges
tree impurity for a graph with n nodes and e
edges:
m(G) = 2(e-n+1)/(n-1)(n-2)
(0 for tree, 1 for complete graph)
19
Any tree impurity metric:
m(G) = 0 if and only if G is a tree
m(G1) > m(G2) if G1 = G2 + an extra edge
if G1 and G2 have the same # of “extra” edges wrt
their spanning tree, and G1 has more nodes than
G2, then m(G1) < m(G2)
m(G) m(Kn) = 1, where G has n nodes, and Kn is
the (undirected) complete graph with n nodes
20
Information flow metric
tree impurity metrics only consider the number of
edges, not their “thickness”
Shepperd’s metric:
there is a local flow from A to B if:
A invokes B and passes it a parameter
B invokes A and A returns a value
there is a global flow from A to B if A updates some global
structure and B reads that structure
21
Shepperd’s metric
fan-in(M) = # (local and global) flows whose sink is
M
fan-out(M) = # (local and global) flows whose
source is M
complexity(M) = (fan-in(M) * fan-out(M))2
22
Point to ponder:
What does this program do?
procedure X(A: array [1..n] of int);
var i, k, small: int;
begin
for i:= 1 to n do
small:= A[i];
for k:= i to n-1 do
if small <= A[k]
then swap (A[k], A[k+1])
end
end
end
end
23
Object-oriented metrics
WMC: Weighted Methods per Class
DIT: Depth of Inheritance Tree
NOC: Number Of Children
CBO: Coupling Between Object Classes
RFC: Response For a Class
LCOM: Lack of COhesion of a Method
24
Weighted Methods per Class
measure for size of class
WMC = c(i), i = 1, …, n (number of methods)
c(i) = complexity of method i
mostly, c(i) = 1
25
Depth of Class in Inheritance Tree
DIT = distance of class to root of its inheritance
tree
Good: forest of classes of medium height
26
Number Of Children
NOC: counts immediate descendants in
inheritance tree
higher values NOC are considered bad:
possibly improper abstraction of the parent class
also suggests that class is to be used in a variety of settings
27
Coupling Between Object Classes
two classes are coupled if a method of one class
uses a method or state variable of another class
CBO = count of all classes a given class is
coupled with
high values: something is wrong
all couplings are counted alike; refinements are
possible
28
Response For a Class
RFC = size of the “response set” of a class
response set = {set of methods: M} {set
methods called by M1: R1} {R2} …
R1
M1
M2
M3
29
Lack of Cohesion of a Method
cohesion = glue that keeps the module (class)
together, eg. all methods use the same set of
state variables
if some methods use a subset of the state
variables, and others use another subset, the
class lacks cohesion
LCOM = number of disjoint sets of methods in a
class
two methods in the same set share at least one
state variable
30
OO metrics
WMC, CBO, RFC, LCOM most useful
Predict fault proneness during design
Strong relationship to maintenance effort
Many OO metrics correlate strongly with size