www.seabees202.com

Download Report

Transcript www.seabees202.com

QTY
12
VOIP (TDN)
6
COMPUTERS (ECG)
(C2PC PCs)
4
TABLE
11
CHAIR
16
PRINTER (TDN)
2
WHITE BOARD
1
MAP BOARD
2
PROJECTOR
3
SWITCH (TDN)
1
VoIP unless noted
ECG Computer
NCR Computer
J. Clerk Admin
COMPUTERS (TDN)
POOW
C2PC C2PC
DSN
Switch
WO
ENTRANCE
ITEM
WC
Printer
EXCON
25JUN2010
NCR - COC
1
QTY
5
VOIP (TDN)
2
TABLE
7
CHAIR
9
PRINTER (TDN)
1
WHITE BOARD
3
MAP BOARD
3
PROJECTOR
0
SWITCH (TDN)
1
ENTRANCE
3A Status Tracker
Board
Printer
Switch
25JUN2010
R3 Clerk
WHITE
BOARD
NCR Computer
ENTRANCE
ENTRANCE
VoIP
UMCC MAP
WHITE
BOARD
COMPUTERS (TDN)
UMCC
ITEM
R33
COPS MAP
R3 TENT
R33C
R35C
R35
FOPS MAP
2
QTY
5
VOIP (TDN)
1
PHONE (DSN)
1
TABLE
7
CHAIR
10
PRINTER (TDN)
1
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
0
SWITCH (TDN)
0
VoIP unless noted
NCR Computer
ENTRANCE
GDUNK
R43
R42
COMMON
AREA
DSN
R4
LOG
ENTRANCE
COMPUTERS (TDN)
ENTRANCE
ITEM
R41
Printer
R4 BOARD
ENTRANCE
25JUN2010
R4/COMMON AREA TENT
3
ITEM
QTY
COMPUTERS (TDN)
3
VOIP (TDN)
1
PHONE (DSN)
1
TABLE
4
CHAIR
5
PRINTER (TDN)
1
WHITE BOARD
2
DSN
ENTRANCE
VoIP unless noted
NCR Computer
Printer
WHITE
BOARD
25JUN2010
R6 TENT
4
ITEM
QTY
COMPUTERS (TDN)
1
VOIP (TDN)
1
TABLE
5
CHAIR
10
PRINTER (TDN)
1
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
1
MAP BOARD
VoIP
C
ENTRANCE
NCR Computer
S
R
E
E
N
Printer
Projector
WHITE BOARD
25JUN2010
OPT #1 TENT
5
ITEM
QTY
COMPUTERS (TDN)
2
VOIP (TDN)
1
TABLE
6
CHAIR
8
PRINTER (TDN)
1
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
1
MAP BOARD
VoIP
C
ENTRANCE
NCR Computer
S
R
E
E
N
Projector
Printer
Printer
WHITE BOARD
25JUN2010
R2 /OPS OVER FLOW TENT
6
ITEM
QTY
COMPUTERS (TDN)
5
VOIP (TDN)
1
PHONE (DSN)
1
TABLE
7
CHAIR
13
PRINTER (TDN)
2
WHITE BOARD
1
Medical
CHAPS
MILADV
DSN
ENTRANCE
NCR Computer
ENTRANCE
VoIP unless noted
Printer
Check in
R1A
R1
ENTRANCE
25JUN2010
R1/SPECIAL STAFF TENT
7
QTY
COMPUTERS (TDN)
3
VOIP (TDN)
1
TABLE
6
CHAIR
10
PRINTER (TDN)
1
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
1
VoIP
Printer
WHITE BOARD
ENTRANCE
NCR Computer
ENTRANCE
PROJECTOR SCREEN
ITEM
CSO
Projector
CMDMC
25JUN2010
CMDR/BRIEFING TENT
8
ITEM
QTY
COMPUTERS (TDN)
1
VOIP (TDN)
1
PHONE (STE)
1
TABLE
2
CHAIR
2
WHITE BOARD
1
VoIP unless noted
NCR Computer
ENTRANCE
STE
WHITE BOARD
25JUN2010
CMDR TENT
9
25JUN2010
10
EQUIPMENT
ROLL
EQUIPMENT LOCATION
EQUIPMENT
ROLL UP
UP
COC
ITEM
R4 TENT
QTY
ITEM
R3 TENT
QTY
ITEM
QTY
COMPUTERS (TDN)
12
COMPUTERS (TDN)
5
COMPUTERS (TDN)
5
VOIP (TDN)
6
VOIP (TDN)
1
VOIP (TDN)
2
COMPUTERS (ECG)
(C2PC PCs)
PHONE (DSN)
1
TABLE
7
4
TABLE
7
CHAIR
9
TABLE
11
CHAIR
10
PRINTER (TDN)
1
CHAIR
16
PRINTER (TDN)
1
WHITE BOARD
3
PRINTER (TDN)
2
WHITE BOARD
1
MAP BOARD
3
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
0
MAP BOARD
2
PROJECTOR
0
SWITCH (TDN)
1
PROJECTOR
3
SWITCH (TDN)
0
SWITCH (TDN)
1
25JUN2010
11
EQUIPMENT
ROLL
EQUIPMENT LOCATION
EQUIPMENT
ROLL UP
UP
R2/OPS OVERFLOW TENT
ITEM
R6 TENT
OPT TENT
QTY
ITEM
ITEM
QTY
QTY
COMPUTERS (TDN)
2
COMPUTERS (TDN)
1
COMPUTERS (TDN)
3
VOIP (TDN)
1
VOIP (TDN)
1
VOIP (TDN)
1
TABLE
6
TABLE
5
PHONE (DSN)
1
CHAIR
8
CHAIR
10
TABLE
4
PRINTER (TDN)
1
PRINTER (TDN)
1
CHAIR
5
WHITE BOARD
1
WHITE BOARD
1
PRINTER (TDN)
1
MAP BOARD
1
MAP BOARD
1
WHITE BOARD
2
PROJECTOR
1
PROJECTOR
1
RDSAT SHACK
ITEM
25JUN2010
QTY
COMPUTERS (TDN)
1
VOIP (TDN)
1
PHONE (DSN)
1
TABLE
2
CHAIR
4
LAN POD
1
12
EQUIPMENT
ROLL
EQUIPMENT LOCATION
EQUIPMENT
ROLL UP
UP
R1 SPECIAL STAFF TENT
ITEM
CMDR/BRIEFING TENT
QTY
ITEM
CMDR TENT
QTY
ITEM
QTY
COMPUTERS (TDN)
5
COMPUTERS (TDN)
3
COMPUTERS (TDN)
1
VOIP (TDN)
1
VOIP (TDN)
1
VOIP (TDN)
1
PHONE (DSN)
1
TABLE
6
PHONE (STE)
1
TABLE
7
CHAIR
10
TABLE
2
CHAIR
13
PRINTER (TDN)
1
CHAIR
2
PRINTER (TDN)
2
WHITE BOARD
1
WHITE BOARD
1
WHITE BOARD
1
MAP BOARD
1
PROJECTOR
1
25JUN2010
13
EQUIPMENT
EQUIPMENTROLL
ROLL UP
UP
EQUIPMENT
ROLL
UP
Items
QTY REQ
QTY REC
RDSAT Package *
1
1
LAN POD with capability to **
1
1
Switches to support 45Laptops, 30 VOIP, 9 Printers
4
3-NCR 1-ECG
Laptops Ruggedized - 3NCR
40
50
Laptops Ruggedized (ECG Requirement)
11
Mouse and Pad for LapTops
51
0
Solipsys(shell, (3)projectors, (3) screens)
1
1
VIOP Phones -3NCR
20
15 1NCD-GPT
VIOP Phones (ECG Requirement)
10
10 1NCD
Projector for OPT(s) R00 briefing room
3
3
Printer/Copier/Scanner
2
2 NCR
Printer (ECG Requirement)
2
2
Printer -3NCR
6
8
* Capability 5 Commerical Lines
** VIOP, Email, Sharepoint, Microsoft Office Suite,
25JUN2010
14
EQUIPMENT
EQUIPMENTROLL
ROLL UP
UP
EQUIPMENT
ROLL
UP
Items
QTY REQ
QTY REC
COMSEC Storage System (Assembly 04096)
1
1
Telephone Secure Unit (STE) ***
1
NCR
KSV-21 card ***
1
NCR CCI
AN/GRA-39
6
6
Real Unit (RL-31)
1
1
Wire Wheel (RL-159U) with ~ 600yrds of wire (WD-1A)
1
1
Phone (TA-838 )
10
10
Distro Box (J-1077)
2
2
Cable Assembly and Reel (CX-4566)
1
1
Tool Kit Electricians (TE-33)
3
3
*** For R00
25JUN2010
15
EQUIPMENT
ROLL
CONSUMABLES
EQUIPMENT
ROLL UP
UP
Items
Ink Cartridges for all printers and copiers
QTY
10 each color and blk
Caution Tape (Yellow 3inX100yrds)
3 rolls
Duct Tape (Green 2inX20yards)
10 rolls
Wire Zipties (12inches)
200 individual
Electrical Tape (0.75 inchX66ft)
10 rolls
CAT 5 Solid Conductor (1000FT Boxes)
5 Boxes
RJ 45 Connector Jumpers (male to male) (Each)
24
RJ 45 Connectors (EA)
250
RJ 11 Connectors for phones (EA)
24
25JUN2010
16
CONSUMABLES
Items
QTY
Canned Air (Can)
50 Cans
Computer Screen Rags (Non-static)
20 Boxes
CD-R disks
100
Batteries for AN/GR-39 D-Cell (BA-3030) (each)
100
Batteries for TA-838 C-Cell (BA-3042) (each)
50
Commercial Phone (Corded, speaker)
8
Tactical Field Message Book S/N 0109-LF-063-0200 (Yellow Canary)
10
UPS (i.e. APC) (each)
10
Power Strips (10ft) (each)
15
Extension Cord 50‘ (each)
10
25JUN2010
17